Laying floor heating pipes at home. Do you want to put some material under the pipe?
1, floor heating inspection, debugging and acceptance shall be reported in writing by the construction unit, and the supervision unit shall organize relevant disciplines to conduct inspection and acceptance, and make records.
2, the professional construction unit of the floor heating system engineering, should have the corresponding construction qualification, engineering quality acceptance personnel should have the corresponding professional and technical qualifications.
3. The inspection, adjustment and acceptance of the floor heating system should follow the principle of "all parties should coordinate and confirm the same". Before the handover or concealment of various disciplines and processes, the following contents should be inspected and accepted, and a conclusion should be made:
(1) Quality of pipes, water collectors, valves, fittings, thermal insulation materials, etc. ;
② Installation quality of pipes and valves;
(3) Acceptance of hydrostatic test before concealment;
(4) the original ground, filling layer, surface and other construction quality inspection and acceptance;
⑤ Intermediate handover quality inspection and acceptance;
6. After concealment, acceptance of water pressure test;
All landowners circuit, system commissioning and debugging.
4, construction scheme and materials, equipment inspection
(1) The construction unit shall prepare the construction organization design or construction scheme according to the construction drawing and engineering technical standards, and the construction can only be started after approval.
(2) The main materials, equipment components, valves, pipe fittings and thermal insulation materials used in the floor heating system engineering must have quality certification documents, and the specifications, models and performance and technical indicators should conform to the current relevant national technical standards, and should be inspected and accepted when entering the site.
(3) Before installing valves, distributors and water collector components, strength and leak tests should be conducted. 65,438 00% of each batch (same brand, same model and same specification) shall be randomly selected for the test, and at least one bypass valve shall be installed at the inlet, outlet and bypass pipeline of the water collector. Strength and leak test should be carried out one by one, and all qualified.
(4) The strength test pressure of the valve is 1 and 5 times of the working pressure; The leak test pressure is 1 and twice the working pressure. The duration of the strength and leak test for valves with DN≤50mm is 15 seconds, during which the pressure remains unchanged, and there is no leakage in the shell, packing and sealing surface.
5, construction and installation quality acceptance
(1) After the installation of the heating pipe of the floor heating system, the construction unit shall, jointly with the supervision unit, conduct intermediate acceptance according to the requirements of concealed works before concrete pouring and mixing of the suspected fill layer.
(2) During the intermediate acceptance of the floor heating system, the following items must be tested and concluded:
(1) The thickness, laying and physical properties of the insulation layer can meet the requirements;
(2) Whether the material, pipe diameter, wall thickness, pipe spacing and bending radius of the heating pipeline meet the design requirements and whether the fixation is reliable;
(3) Whether the expansion joints are laid as required;
6, floor heating installation matters needing attention
Be sure to find a construction team with professional knowledge of floor heating. "Three points floor, seven points installation", the effect of amateur decoration team is self-evident.
The tightness of the floor heating system must be checked before laying.
The ground must be dry (which can be judged by experimental phenomena), and the water content of cement ground should be below 1.5%. The indoor humidity should not be too high. Whether there is geothermal heating or not, the ambient humidity before and after installation is about 60 degrees.
It is forbidden to nail nails on the ground during construction. After the construction is completed, it is also forbidden to nail on the ground to prevent damage to the heating coil.
Before laying the reinforced floor, EPE composite membrane should be laid (the words special for floor heating radiation must be marked on the EPE composite membrane) to isolate moisture and release it from the skirting board around.
Keels should not be laid. The low thermal conductivity of air will affect the heat dissipation effect and may also damage the pipeline.
When laying the floor, special glue for floor heating must be used to increase the use time and effect. Moreover, this glue basically does not have to worry about the emission of harmful gases.
There are enough expansion joints between the floor and the wall, and the skirting board thicker than the current general floor is used.
Paving the floor and installing the skirting board should be done twice. After the floor is laid for 48 hours, when the glue is completely dry, remove the fasteners before making the skirting board.
The floor cannot be heated until it is installed for 24 hours.
Next, Bian Xiao talks about matters needing attention in floor heating laying from four aspects: main floor heating pipe, pipeline laying, water separator installation and backfill layer laying.
Installation of floor heating main pipe
The main floor heating pipe is an important equipment for supplying water to the floor heating system. If there is a problem with the supervisor, it will affect the operation of the whole heating system. Supervision should pay attention to the following points during installation:
1. The supervisor must keep warm.
2. The supervisor should be installed horizontally and vertically.
3. The installation of the supervisor must be carried out in the position indicated in the design drawings, and there must be no error; (If changes are needed in the actual installation process, please pay attention to mark the location of supervision changes on the drawings, provided that the designer agrees. )
4. The supervisor should use pipe clamp to fix it firmly.
5. After the installation is completed, the supervisor shall conduct a pressure test.
6. Distribution manifold (including connectors, etc.). ) After installation, there should be finished product protection measures, and the casing should be fixed out of the ground.
7. There should be no joint for the heating pipe in the packing layer. The construction standard and allowable deviation of pipeline installation project and the construction standard and allowable deviation of original ground, filling layer and surface layer shall comply with relevant regulations.
Floor heating pipeline laying
In the construction of floor heating, the laying of floor heating pipes is the most important. The laying quality of floor heating pipes directly affects the heating effect of floor heating system. If improperly installed, the floor heating will be overheated or overheated locally. Therefore, attention should be paid to the construction according to the drawings when laying the floor heating pipeline.
1, resolutely put an end to pipeline crossing.
2, consistent with the design loop.
3, pipeline laying spacing and design.
4. The distance between the pipeline and the cold wall is100—150mm.
5. If the actual laying length difference between pipeline loops is greater than 30m, it needs to be readjusted and notified to the company in time.
6, connected to the ground part of the water separator pipeline must add insulation casing.
Installation of floor heating water separator
Distribution manifold is the heart of floor heating system. It is used to evenly distribute and recycle the water in warm branch pipes around the country, so as to achieve good system circulation. When installing, the distribution manifold should do the following:
1. The water separator shall be installed horizontally.
2. Pay attention to the connection of water supply and backwater.
3. After installation, wipe the oil-water separator clean.
4. After installing the water separator, it is necessary to indicate the heating area of each loop.
Laying of floor heating backfill layer
The backfill layer of floor heating can also be called thermal storage layer. Improper construction of floor heating backfill layer will not only affect the installation of floor decoration materials, but also damage the floor heating system. Pay attention to the correct construction when backfilling the floor heating.
1, fine stone concrete protective layer laying, check the pressure gauge before laying, if the pressure gauge is lower than 4MPA, construction is prohibited.
2. The ground elevation difference after concrete leveling shall not be greater than 5 mm ..
3. Concrete mixing: It is forbidden to mix concrete directly on the floor heating pipeline. The floor heating pipes can be covered with wooden boards or plastic boards. During construction, the floor heating coil shall not be exposed. If the wall insulation strip falls off, it is necessary to reset the boundary insulation strip.
4, when laying concrete, in the doorway, corridor, floor drain and other positions must be marked, to prevent improper behavior in the future construction damage to the floor heating pipeline.
- Related articles
- How to maintain health in spring, summer, autumn and winter?
- Speech at the opening ceremony
- What are the interesting places in China?
- Rizhao eleventh weather
- How to set the Apple 14promax wallpaper?
- Is the 20 18 Mugecuo Scenic Area closed? /kloc-Is it appropriate to travel to Ganzi in October?
- Africa is fertile and sunny. Is it feasible for China people to contract land to grow food?
- What do you think of the properties in Jincheng Community?
- Don't ignore these problems when applying waterborne wood paint in hot and humid weather.
- The weather in Urumqi is January.