Traditional Culture Encyclopedia - Weather forecast - Emergency plan for heatstroke prevention and cooling (5 highlights)
Emergency plan for heatstroke prevention and cooling (5 highlights)
Emergency plan for heatstroke prevention and high temperature (5 highlights) (1) Purpose:
In order to ensure the health of production personnel in summer, especially in high temperature season, and effectively guarantee the normal operation of the company's production, this scheme is specially formulated.
Detailed implementation rules:
First, earnestly implement the responsibility system for heatstroke prevention and cooling.
The factory director of each workshop is the first person responsible for safety in production. It is necessary to strengthen heatstroke prevention and cooling, clarify the responsibility for safety in production, and implement preventive measures to prevent employees from heatstroke and various safety accidents caused by high temperature weather.
Second, strengthen heatstroke prevention education.
Each workshop organizes employees to carry out heatstroke prevention and cooling safety education and publicity, so that everyone can master the common sense of heatstroke prevention and cooling safety, strengthen summer job safety training, and enhance employees' awareness of safety in production. Focus on heatstroke prevention, food poisoning prevention and fire prevention, and adhere to safety work.
Third, do a good job in health and epidemic prevention and adjust the summer diet.
Strengthen canteen management, strengthen food hygiene management, strictly implement food hygiene system, and avoid poisoning incidents caused by food deterioration. At the same time, do a good job in the adjustment of canteen recipes. In high temperature season, the menu is light, nutritious, easy to digest and absorb, and there are cool and refreshing soups, such as kelp pumpkin soup and winter melon soup.
Fourth, ensure adequate supply of drinking water.
Provide enough drinking water that meets the sanitary requirements on site to effectively prevent heatstroke and avoid heatstroke.
Five, actively improve the site production environment
We should conscientiously implement the management regulations of the job site and actively take measures to strengthen ventilation and cool down. Electric fans and air coolers must be installed at the job site.
Six, do a good job of fire prevention in summer.
In view of the fact that fire accidents are prone to occur in hot summer and dry weather, fire prevention measures should be further strengthened, and flammable places such as distribution boxes, welding areas and warehouses (paint and engine oil) should be inspected regularly, and problems should be dealt with immediately, and fire-fighting equipment should be equipped according to regulations.
Seven, the implementation of heatstroke prevention and cooling items
The person in charge of each workshop buys heatstroke prevention drugs according to the actual number of people. Each workshop should have sufficient heatstroke prevention and cooling drugs (such as Ren Dan, Huoxiang Zhengqi Water and Fengyoujing) in the comprehensive office to ensure that employees can get timely treatment when they are sick.
Eight, apply for appropriate high temperature subsidies.
1. Distribution standard: 5 yuan/day/person for first-line high-temperature posts and 2 yuan/day/person for non-high-temperature posts, 30 days per month.
2. Release date: tentative.
3. Distribution scope: subject to the actual on-the-job list.
Nine, emergency rescue plan
1, mild patient rescue
When dizziness, fatigue and dizziness occur, the operator should immediately stop the operation to prevent the occurrence of secondary accidents. Other peripheral operators should arrange symptomatic personnel to rest in a cool and ventilated place and provide them with cold water and wet towels. And let them take summer drugs such as Ren Dan or Huoxiang Zhengqi Water.
2. The rescue of critically ill patients
When heatstroke occurs at the job site (accompanied by fainting, shock, severe water shortage, etc.). ), the people around the work should immediately notify the team leader, and timely transfer the accident personnel to a cool and ventilated place (or an air-conditioned office), and immediately organize emergency treatment according to the specific situation. If the symptoms are serious, you should immediately call the medical emergency number "120" and report to the company.
Emergency plan for heatstroke prevention and cooling (5 highlights) (2) 3
In midsummer, the temperature rises, and this method is specially formulated to do a good job of heatstroke prevention and cooling in the summer construction site, protect the health of employees, and prevent production safety accidents such as heatstroke caused by high temperature weather.
First, the security department should go deep into the workshop, publicize the knowledge of heatstroke prevention and first aid, and improve the safety awareness of all employees.
Two, the security department and the office should pay close attention to the weather forecast about high temperature weather.
1, and the maximum daily temperature is greater than or equal to 33 degrees Celsius. Start heatstroke prevention and cooling measures: ensure sufficient drinking water supply in the workshop. Designate a special person to be responsible for the cold storage of drinking water, and ensure the supply of ice water at least three times a day (but ice water cannot pass through ice).
2. When the highest temperature of the day is greater than or equal to 35 degrees Celsius, start high-temperature heatstroke prevention measures: shift work and rest work are taken in the workshop to shorten the continuous working hours of employees; In addition to ensuring adequate drinking water supply, the administrative department also needs to arrange the cooking of summer drinks, such as mung bean water, sour plum soup, ginger and salt tea, watermelon and so on. , and timely supplement salt water drinks.
3. If the maximum daily temperature is greater than or equal to 37 degrees Celsius, start the continuous high-temperature heatstroke prevention measures: the workshop work shall be rested in shifts, and the continuous working hours of employees shall not exceed the time stipulated by the state, and outdoor open-air operations shall not be arranged; The administrative department should not only ensure adequate drinking water supply, make summer drinks well, but also replenish salt water drinks in time.
3. The purchasing department shall cooperate with the office to implement heatstroke prevention and cooling items, such as Ren Dan, Huoxiang Zhengqi Water and Ten Drops of Water. The production equipment dept. shall, in combination with the actual production situation, formulate a heatstroke prevention and cooling drug plan, and timely purchase and distribute it to each team in the workshop.
Four, check the workshop heatstroke prevention and cooling equipment. The production equipment department shall make statistics on the damaged fans, air conditioners and cooling equipment, and organize procurement or maintenance after reporting to the company for approval. Ensure the normal operation of heatstroke prevention and cooling equipment in the workshop.
Five, do a good job of fire prevention in summer. In view of the hot weather in summer, lighting mosquito-repellent incense and using electrical appliances are prone to fire accidents, and fire prevention measures must be strengthened. The safety department shall regularly inspect the flammable places in the whole plant, deal with the problems immediately when they are found, and provide fire-fighting equipment as required.
Emergency plan for heatstroke prevention and cooling (5 highlights) (3) Emergency plan drill plan for high-temperature heatstroke accident High-temperature heatstroke is a common accident in the construction process of high-temperature weather. Judging from the final injury degree of heatstroke victims, it is very likely to be rescued if the heatstroke victims are rescued in time and in the right way. The purpose of preparing the emergency plan for high temperature heatstroke accident is to try our best to rescue the heatstroke victims from the death line and reduce the casualties of the accident to a minimum.
I. Scope of application of the plan This emergency plan is applicable to all employees involved in the production of this project. When someone has heatstroke in the workplace, they will take the responsibility of emergency rescue for others' heatstroke. If someone is found to have heatstroke in other places, he shall bear the obligation of emergency rescue for heatstroke of foreigners.
Second, the drill situation simulated that when the project department poured column concrete, due to the continuous high temperature, a construction worker of the concrete team fell to the ground due to heatstroke.
Third, the time of the exercise is set at XX, XX, XX.
Iv. Planning organization and responsibilities:
1, high temperature heatstroke accident organization (commander in chief)
Chief Commander: Xu Jian's main responsibilities:
First, be fully responsible for on-site emergency work;
B, decided to start the emergency plan;
C, command emergency work.
Deputy Commander: What does Ding Jinqing do? Main responsibilities:
First, organize emergency work;
B, coordinate the unified scheduling of all departments;
C, responsible for investigation, monitoring and the determination of the first aid plan.
On-site conductor: He Xuefeng, Song, etc. Main responsibilities:
A, communicate and contact the drill personnel of various departments, and be responsible for the smooth flow of rescue lines and on-site alert;
B, assist the commander-in-chief to do a good job in various logistics affairs and preparation of drill materials and other related matters;
C, coordinate communication with local hospitals and public security, and be responsible for the collection and arrangement of drill data.
2. The responsibilities of each group:
(1) Accident handling group: The main task is to determine the rescue plan and organize personnel and vehicles to rescue heatstroke victims;
(2) Medical rescue team: The main task is to arrive at the scene of the accident in time to rescue the heatstroke victims, and decide to give first aid at the scene or the nearest hospital according to the injury to ensure the life safety of the wounded.
(3) Alert Liaison Group: The main tasks are to upload and issue leadership instructions, clear traffic routes, communicate with the outside world to inform the scene of accidents, send people to meet at intersections, and record the whole process of drills.
(4) Logistics Support Group: The main task is to obey the instructions of the leaders of the headquarters, arrange the dispatch of rescue drill vehicles and timely supply of emergency funds.
Each group of personnel consists of an accident handling group: Xu Jianhe, the other medical rescue groups: Zhou Xiujuan, Jin Lingjuan, the alert liaison group: Zhao Yisheng, Zhu, and, and the logistics support group: Jin Jiyong and Wang. Exercise procedures:
Simulated accident: Zhao simulated heatstroke of construction workers.
1, the accident happened at XX, and the construction worker fell to the ground with heatstroke.
3, in the process of disposal, 1, XX, XX concrete team found danger, immediately notify the project manager Xu Jian.
2. After receiving the accident report, the project manager of 2.XX Branch immediately started the emergency plan and reported the situation to relevant departments. He Gan, the person in charge of safety, called the emergency number "120" and arranged for the nearest hospital to prepare for rescue.
3. At XX, at XX, the field personnel carried the heatstroke employees to a cool and ventilated place to prevent secondary injuries and wait for the medical rescue team to rescue them.
4. At 4.XX, the on-site alert group immediately isolated the scene of the accident to protect the scene of the accident.
5. At XX, at XX, the on-site rescue team immediately carried the first-aid medicine box to practice the scene and quickly judged the condition. Artificial first aid was used at the scene, and the forehead and sweat of heatstroke patients were gently wiped with cold towels. And unbutton the coat of heatstroke patients to achieve good ventilation effect.
6, XX XX point with cool ventilation drugs into the nostrils of heatstroke, so that its ventilation is smooth. Patients with mild heatstroke should be given an appropriate amount of cold and salty drinks and take corresponding drugs. Patients with moderate heatstroke were taken to the hospital immediately.
7. At XX, people suffering from heatstroke wake up slowly at XX.
8. In XX, the drill ends in XX. No one was injured this time, but the rescue process is the most important.
9. In XX, what did the deputy commander of XX do to report the drill to the general commander Xu Jian, who made a simple summary of the drill.
An ambulance, a stretcher bed and a medicine box. Precautions 1. The alert liaison group should carefully record the exercise time, report time, personnel injuries and on-site personnel.
2. On the day of the drill, the logistics support team must ensure that all drill personnel and materials are transported to the drill site before 10, and emergency funds and logistics-related materials are arranged in place.
Rescuers should arrive at the scene in the shortest time. After the rescuers arrive at the scene of the accident, they should obey the command of the headquarters and carry out first aid work. After the rescue, evacuate all personnel from the scene of the accident and to a safe area.
4. Commander-in-Chief Xu Jian summarized the drill and announced that after the drill, all the drill personnel left the drill site to restore the construction order.
Through this drill, all our construction workers will be more clear about the rescue procedures of the emergency rescue plan. In order to deal with emergencies, the orderly implementation of emergency plans was ensured, time was gained for rescue, and the purpose of drills was achieved.
Emergency plan for heatstroke prevention and cooling (5 highlights) (4) 2
I. Scope and basis
1 and range
This plan is aimed at heatstroke events that may occur in projects under construction, and is applicable to all personnel in the project department.
2. Foundation
It is formulated in accordance with Guiding Opinions of Relevant Departments and Units in the State Council on Formulating and Revising the Framework of Emergency Plans, Regulations on Emergency Management of State Grid Corporation of China and Code for Preparing Emergency Plans of State Grid Corporation of China.
3. Conditions and severity of the accident
3。 1 conditions under which the event occurs
During the construction of this project in summer, due to the long-term continuous work of construction personnel in hot and high-temperature environment, heatstroke may occur.
3。 2 the severity of the incident
Heatstroke is a secondary event in engineering construction. Once it happens, this plan will be launched immediately after the approval of emergency headquarters.
Second, the basic principles of emergency response
1, emergency rescue work follows the principles of unified leadership, division of labor and cooperation, timely response, decisive measures, relying on science, giving priority to self-help, and combining unit self-help with social assistance.
2, to protect the safety of personnel as a priority principle.
3, any individual has the obligation to participate in or cooperate with the emergency rescue work of production safety accidents.
Third, the emergency rescue system
1, emergency organization system
Overview of emergency rescue organization structure of project department
2, emergency leading group and responsibilities
2。 1 members of the emergency leading group
Team leader: project manager
Deputy Head: Deputy Manager and Chief Engineer
Members: department heads, team leaders and drivers.
2。 2 responsibilities of the emergency leading group
2。 2。 1 Operation and coordination of all construction sites, including coordination with the command center.
2。 2。 2. On-site accident assessment.
2。 2。 Ensure that field personnel and the public implement emergency response actions.
3, emergency working group and responsibilities
3。 1 Functions and responsibilities of on-site casualty rescue team
3。 1。 1, necessary first aid should be given to heatstroke victims, and protective measures should be taken for other personnel:
3。 2. Functions and responsibilities of the Security and Steering Group
3。 2。 1 Effectively isolate the inside and outside of the site and keep the emergency rescue passage unblocked;
3。 2。 2. Evacuate people inside and outside the site from the dangerous area.
3。 3 Functions and responsibilities of Logistics Supply Group
3。 3。 1 rapidly allocate emergency materials and equipment to the scene of the accident;
3。 3。 2. Provide equipment and safety protection for inspection and rescue personnel;
Emergency plan for heatstroke prevention and high temperature (5 highlights) (5) 3
In order to further strengthen the implementation of emergency plan safeguard measures, improve the ability of the project department to deal with production safety accidents and emergencies, and educate employees how to deal with emergencies correctly, accurately and quickly, all departments are specially organized to carry out emergency drills for continuous beams and hanging baskets. The exercise plan is as follows:
First, the exercise time:
XX, xx, xx, xx p.m.
Second, the purpose of the exercise:
1, to prevent high-temperature heatstroke accidents in the field during high-temperature construction.
2. Respond quickly after the heatstroke accident and start the emergency plan procedure to minimize the deterioration of heatstroke and casualties.
Third, the exercise plan:
(A) the background of the emergency plan exercise
During the construction of No.8 subgrade side ditch, a worker suffered from heatstroke while cleaning the garbage in the cable trough in the ditch.
(2) exercise leading group:
Leader of emergency rescue team: xxx.
Team members: emergency team members, xx team leader and team leader.
(3) Division of exercise and rescue:
1 emergency rescue team: led by team leader xx, assisted by xx, and composed of members of relevant departments and collaboration groups. Organize emergency rescue.
Logistics support group: Sun, director of the office, is responsible for the basic first aid work of personnel in emergency rescue.
External Liaison Group: Secretaries xx and xx are responsible for external liaison, contacting the green channel of xx People's Hospital, and providing timely rescue for heatstroke patients.
(4) Exercise procedures and personnel responsibilities:
1, drill procedure: notify the emergency team to rush to the site-primary rescue on site, and carry the wounded to a flat and cool place for preliminary cooling treatment; At the same time, xx called the green channel ambulance to open a green rescue channel-xx immediately organized a team to maintain order at the scene-after the rescuers arrived, xx was responsible for cooperating with the rescuers to rescue the heatstroke victims, and assisted in carrying rescue vehicles to accompany them to the hospital-finally, the manager XX made a summary, and the safety director XX explained the common sense of preventing high-temperature heatstroke, self-help and mutual rescue, and matters needing attention-the drill was over.
2. Peng Pengguang, the leader of the emergency leading group, is the highest person in charge of emergency rescue work. During the rescue process, he urged the office, finance department and machinery department to be equipped with corresponding emergency materials and equipment. In case of heatstroke, he quickly started the emergency plan and commanded the rescue in an all-round way.
- Previous article:The weather in Europe in March
- Next article:What plants can predict weather changes?
- Related articles
- When it gets cold in autumn, people's appetites begin to improve. What foods must not be too greedy?
- Is changji city Dushi Tourist Resort interesting? How much is Du Shi's tourist resort?
- How to evaluate the fifth issue of the variety show Great Wall?
- What is the coldest month in South Africa?
- Elegant and poetic girl names refer to how to name girls.
- How far is Shenxianchi from Jiuzhaigou?
- Shanxi weather forecast broadcast
- Fishing skills after the Millennium
- Why do people feel like the weather?
- What is the Japanese meaning of drawing two blue lines in the photo? How to translate Hiragana in Japanese?