Traditional Culture Encyclopedia - Weather forecast - What does the oiler do?

What does the oiler do?

Question 1: What are the main jobs of oil workers and bricklayers? Painters are responsible for painting walls, doors and windows, and bricklayers are responsible for building houses. If the house needs to be rebuilt or broken, he is responsible. Fees can be paid by the day or included. By the day, one day in Shanghai 150 yuan.

Question 2: What are the detailed work steps of oil workers? The first step is to clean the base, pay attention to clean the nails and other things on the wall, and there can be no protruding concrete and other things. If the wall is uneven, you'd better repaint it. If it is not uniform, it will produce uneven tension on the putty and make it crack. Putty is generally approved for three times, the first time is generally scraped, then scraped for the second time, and then sanded for the third time after rest. Oil latex paint is usually oiled twice after the primer is adjusted. Pay attention to the same direction and sequence of oiling. Only when the previous one is almost dry can you oil it for the second time. The top coat is the same, horizontal and vertical twice, and the construction is the same as the primer. It should be noted that it is best not to construct in Nantian. If there is water seepage or dryness on the wall, waterproof treatment should be done. In case of rainy or humid weather during construction, the doors and windows should be closed, and the electric fan should be turned on for maintenance to keep the room dry. In order to prevent cracks, the thickness of putty is related to the treatment of joints and base. Generally, the thickness of putty is about 1~2mm, and the joints should be treated with caulking agent, and then the putty should be scraped after being pasted with kraft paper.

Question 3: What does the oilman do in the decoration process? 1, gypsum powder+glue for wall repair.

2. The user handles the ceiling edge line without steps and glues it.

3. Apply putty for 2-3 times.

4. Brush 1 bottom and both sides after drying.

5. If there is furniture, paint it with wood.

Question 4: What does a painter do? Painters are responsible for painting walls, doors and windows, and bricklayers are responsible for building houses. If the house needs to be rebuilt or broken, he will be responsible. Fees can be paid by the day or included. By the day, one day in Shanghai 150 yuan.

Question 5: What do oil workers do? 1, gypsum powder+glue for wall repair.

2. Treat the ceiling edge with non-grain steps and glue water. 3. Apply putty for 2-3 times.

4. Brush 1 bottom and both sides after drying.

5. If there is furniture, paint it with wood.

Question 6: What are the detailed work steps of the oilman? The oiler is a beautician. An oiler can't do well, which directly affects your decoration effect. Here I'll introduce you to the basic steps of scraping putty and painting the house. The first step is to peel off the wall, and then use Mo Dou to draw lines at the inner and outer corners. It is recommended not to use plaster line to level uneven places. Pay attention to the caulking and dressing of wire trench. Finally, scrape the putty for 2-3 times, polish it with 200 bulbs to remove dust, start to brush the primer to repair it, and finally brush the topcoat for 2-3 times.

Here is a detailed explanation of the renovation construction and steps of old furniture. Use coarse sandpaper to polish rough surface to produce paint adhesion, and then use Du Fang water-based putty and Du Fang putty for joint filling and leveling. Pay attention to use as thin as possible 500 # sandpaper to smooth, remove dust and spray primer for 2-3 times. Then use 1000 mesh sandpaper to polish and spray top coat once. Pay attention to indoor hygiene. The above are personal construction and steps for reference only. Please forgive me if there is any mistake.

Question 7: What does an oil tester do? I. The main work contents of oil testing workers are as follows:

1, safe wellhead operation, complete other tasks assigned by the monitor;

2, according to the construction design and admission data standards, take all the original data, responsible for filling in the report and reporting to the superior, to ensure the accuracy of the data;

3. Be responsible for the measurement, calculation and combination of underground pipe string to ensure the qualified construction quality;

4. Responsible for the management, inspection and handover of data, charts and various measuring tools and instruments to ensure the normal construction;

5, complete other work assigned by the leadership.

Second, the job requirements of the oil tester are as follows:

1, aged between 20 and 45, male, in good health, able to bear hardships and stand hard work, without bad hobbies;

2, high school, technical school or above, work experience is preferred;

3. Good conduct, honesty and trustworthiness, and strong organizational discipline;

4, can adapt to field work;

5. Height 1.7 meters or above, no color blindness and color weakness, corrected vision 1.0 or above;

6. Strong sense of responsibility and organizational discipline;

7, love their jobs, law-abiding, obey the enterprise management.

Question 8: What does a carpenter do to decorate a house, a bricklayer do, and an oilman do to help my friend solve it? Thank you for your basic process and management requirements for home decoration.

First, enter the sequence:

1 First, check the drawings and make clear the layout of the decoration objects (such as flushing walls, building walls and making furniture). ).

2. Pre-project: wall-beating, floor-beating, ceramic tile and old facilities demolition (according to the requirements of the site and the owner).

3. Hydraulic mobilization: arrange water supply and drainage positions and carry out construction (reasonable arrangement according to the requirements of the owner).

4. Electrician enters the site: fix the lamp position, lamp trough and pay-off (arrange reasonably according to the owner's requirements and engineering needs).

5. Masons enter the site: build walls, swing, lay floor tiles, stick tiles and install facilities.

6, check the prophase project quality:

Whether the masonry wall is straight and whether the floor tiles and tiles are flat, such as checking the corners of the floor tiles and tiles, at least triangular and aligned. Then, whether the gaps between floor tiles and between tiles meet the requirements of the company (the company has standards), and the laying of floor tiles and tiles is completed. After the cement is solidified, tap the brick surface gently with a small stick to see if it is empty. If found, correct it in time, and take certain measures to protect the brick surface after the quality is no problem.

Check whether the water supply and drainage is reasonable and whether the joints are tight, and there can be no leakage. Water supply and drainage should use as few joints and elbows as possible. After the installation of water supply, pressure test should be carried out to see if there is leakage.

Check whether the wire arrangement is appropriate, pay-off should take shortcuts as far as possible to save wires, whether the bottom joint is flat, whether the wire joint is reasonable and whether the pay-off is standardized, and arrange direct connection.

Laying procedure: elbow is arranged for elbow, tee is arranged for three forks, and redundant hoses (such as waterproof wax pipes and metal snake pipes, etc.). ), and it is required to install a lock at the bottom of the line.

Pay-off: 1) Lighting lamp, switch and copper conductor:15m2.

2) Copper conductor of socket: 2.5m2

3) Air conditioning circuit and water heater: 4-6 square meters.

4) General system: According to the room pay-off index (that is, how many lines are there), each air switch controls one line, and one or several leakage switches mainly depend on voltage (generally one leakage switch is arranged).

Second, carpentry began to play a role.

1, first review the drawings, what kind of furniture to make, how much to make, and measure the materials according to the furniture. At present, the commonly used boards for home decoration are: 15% core board, 12% plywood, 9% plywood, 5% plywood and 4% plywood.

2. Woodworking begins: first nail the sawing table, the ceiling and make the furniture frame. Basic dimensions of furniture:

Entrance: Shoe cabinet: 28-30 cm deep

Master bedroom: wardrobe: height: flat ceiling

L: According to the requirements of the owner.

Depth: 50-55cm

Hall: TV cabinet: according to the drawings or the requirements of the owner, the TV cabinet will be made into an arc, with the widest point of 80 cm and the narrowest point of 40 cm, and the lines will be smooth and natural.

Study: bookcase: Gaoping ceiling

L: natural or owner's requirements.

Depth: 28-30cm

Desk: length: natural or owner's requirements.

Height: 60-70 cm

Width: 55cm-70cm or as required by the owner.

Wine cabinet: 40 cm wide or required by the owner, or constructed according to the drawings.

Kitchen: basement: height: 80 cm width: 55 cm

Stove: height: 60 cm width: 55 cm

Length: Natural or actual kitchen length.

Application of panels and lines:

At present, plate applications: waist line, nail line, semicircle line, flat line, corner line and lap line.

Waist line: used for door and window covers.

Nailing thread: used in door covers, window covers, book tables, TV cabinets, decorative cabinets and other application places.

Semicircular line: used in desks, porches and other places.

Flat wire: the application of various furniture sealing

Binding: Glass ceiling for dining room.

Corner line: it can be divided into inner corner line and outer corner line. According to the needs of the project, the corner line should cover the corner, entrance or other.

Note: The lines listed above are commonly used, such as modeling or using some flower lines and magic colored lines if the owner has special requirements.

Painter: When carpentry is 90% finished, the painter begins to brush oil. Note: When buying panels, the purchased paint and panels should be brushed two or three times after arriving at the construction site, and then twice after construction. At first, the panel was not standardized, and the nail holes made by carpenters had to be dried and polished, and then brushed two or three times. If the effect is good, start grinding the water mill, which is more difficult to complete, mainly depending on the effect of the paint, such as grinding the water mill ... >>

Question 9: What does the oil collector do as a gathering worker? In short, gathering and transportation workers are engaged in oil gathering and transportation.

Gathering and transporting workers are a type of work in oil production plants, working in the joint station of oil production plants, mainly responsible for oil gathering, crude oil metering, crude oil dehydration and export in the joint station.

Question 10: What is the job of the needle oiler? The first step is to clean the base, pay attention to clean the nails and other things on the wall, and there can be no protruding concrete and other things. If the wall is uneven, you'd better repaint it. If it is not uniform, it will produce uneven tension on the putty and make it crack. Putty is generally approved for three times, the first time is generally scraped, then scraped for the second time, and then sanded for the third time after rest. Oil latex paint is usually oiled twice after the primer is adjusted. Pay attention to the same direction and sequence of oiling. Only when the previous one is almost dry can you oil it for the second time. The top coat is the same, horizontal and vertical twice, and the construction is the same as the primer. It should be noted that it is best not to construct in Nantian. If there is water seepage or dryness on the wall, waterproof treatment should be done. In case of rainy or humid weather during construction, the doors and windows should be closed, and the electric fan should be turned on for maintenance to keep the room dry. In order to prevent cracks, the thickness of putty is related to the treatment of joints and base. Generally, the thickness of putty is about 1~2mm, and the joints should be treated with caulking agent, and then the putty should be scraped after being pasted with kraft paper.