# Report # Introduction A summary report is a review and evaluation of past work, which should respect objective facts and be based on facts. The following is the technical summary report of the project, welcome to read!

Technical summary report of 1. project

I graduated from the Computer Department of Shandong Laiwu Mining Workers College in 20_ years. In April of 20_, he was assigned to Xinwen Mining Group Exploration Company. In 20_, he was admitted to the correspondence undergraduate geological engineering department of Taian University of Science and Technology, and graduated at the end of 20_. In the past eight years, with the help of the company's leaders and colleagues, I have worked hard to do my job according to the requirements of post responsibilities and code of conduct, and have earnestly completed all the work assigned by the leaders, and my ideological consciousness and working ability have been greatly improved.

Positive thinking, can conscientiously implement the party's basic principles and policies, actively study political theory, adhere to the four cardinal principles, abide by the law, love their jobs, and have a strong sense of responsibility and dedication. Actively study professional knowledge, have a correct working attitude, be serious and responsible, and have good ideological and political quality, ideological quality and professional ethics.

In terms of work attitude and hard work, I love my job, can treat every job correctly and seriously, can actively find my own shortcomings, and learn to supplement them in time.

Carry forward the fine tradition of being hard-working and helpful in life, always be honest and trustworthy, work diligently, unite colleagues, be pragmatic and optimistic, and always maintain a rigorous and serious work attitude and meticulous work style.

In the first four years, I humbly studied geology with my teacher. They made me understand my responsibility as a geological technician. They laid a foundation for me and taught me to identify lithology, divide strata, record geology and so on. After working independently, I kept learning and accumulating experience in my work until I was hired as a geological technician by the group company at the end of 20_.

As a technician for three years, I have been responsible for compiling the following areas and reports: 3 hydrological holes in Bin County, Shaanxi Province, 2 geological holes in Dong 'e County, Liaocheng City, 7 geological holes, 1 hydrological hole, and the main and auxiliary wells of the new Shanghai Miaohengshanbao wellhead inspection hole in Inner Mongolia 1 each.

In Jindouying, yanggu county, Liaocheng, there are inclined shafts 1, main and auxiliary shafts for wellhead inspection 1, 5 geological holes and 5 geological holes. Hydrological hole 1 piece.

There are 2 geological holes in Jindouying, yanggu county, Liaocheng, 2 hydrological holes in Dabu Township, yanggu county, 8 geological holes in Zhangqiu County, 2 geological holes in Zhangqiu County and 2 hydrological holes in Zhungeer Banner, Inner Mongolia. Participate in the compilation of regional geological reports of Miaofucheng Mine, Hengshanbao, Dabu Township and Jindouying in yanggu county.

In charge of these projects, we will also encounter different problems, especially the pumping situation of hydrological holes and wellhead inspection holes, and the faults encountered by geological holes. Before pumping water, clean the well until you can see the lines on your palm and there is no sediment in the bottle. One of the problems encountered in pumping water is that the water is sometimes turbid, and sometimes it will produce sand, especially the water in loose conglomerate section. I can see the lines on my palm. There is no sediment in the bottle. Why does this happen when pumping water? There are two general reasons. First, there is mud on the casing wall. At this time, pumping equipment should be put forward, and an iron brush should be tied to the lower part of the drill pipe for washing. Secondly, if there is sand, it is because some conglomerates are not well cemented, and it is normal to produce sand in the screen. The general treatment method is to throw it into the hole and fish the sand tool until it is fished out. For the above two problems, in this way, when pumping again, there will be no turbidity or sand formation when pumping again. As long as you remember the lithology of the roof and floor of each coal seam and the lithology characteristics of the roof of the indicator layer of the coal measures section of the geological tunnel, but when encountering faults, especially the coal measures section, now the coal measures are all cored, and it is necessary to core until the core is complete, and there is no broken zone or fault extrusion or fault breccia. At this time, it is necessary to judge which horizon to reach through the lithologic characteristics that people usually see.

Future work plan, through summing up the work in the past three years, although some progress and achievements have been made, there are still some shortcomings, no innovative work ideas, and individual work is not perfect enough. In my future work, I will try my best to find out the shortcomings in my work so as to overcome them in my future work. At the same time, we need to read more books, study norms and related documents, master professional knowledge, improve our working ability, strengthen our sense of responsibility, and do our personal work in time. Constantly sum up and reflect, constantly spur yourself to enrich your energy, improve your quality and business level, in order to adapt to the development of the times and enterprises, and make progress and growth together with the company.

2. Technical summary report of the project

_ is a fruitful year, for me personally, _ is a year of comprehensive progress in personal professional skills. In the past year, as a technical cadre with engineering construction experience, I partially or fully participated in the technical work of several construction teams specializing in steam turbines. It is in this busy and fulfilling year that under the unique conditions of Ludian Power Engineering, on the one hand, I tested my original engineering knowledge and further deepened it, on the other hand, I initially built my own professional knowledge system. I. Overview of work

The technical work that I am personally responsible for throughout the year can be roughly divided into several time periods from the key points of the phased construction of the project.

At the beginning of the Spring Festival in _ _, I was the only technical cadre of the whole steam turbine group because Haikou and Baima projects were in the critical period of construction. As a technical cadre of steam turbine team, I am responsible for the technical work of all teams of steam turbine specialty. At the same time, the preparation plan of more than 60 sets of construction drawings of all 2 1 large systems in steam turbine specialty is also a time-pressing, huge and extremely important work.

During the period from April when other technical cadres entered the site to August, my work focus changed, and I was mainly responsible for managing the daily construction technical work of Class 1 and Class 2, as well as the unfinished phased construction tasks in the early stage. During this period, I was mainly responsible for the installation of steel platforms in 1 and 2# steam turbine rooms, the hoisting and hauling of three high-pressure heaters, the installation of traveling rail beam and traveling crane in circulating water pump room, the installation of circulating water pipeline in the factory and the installation of high-pressure water supply pipeline that participated in the water pressure test of 1# boiler in the first-class task of pipeline.

Since August, my technical tasks have been gradually stripped off. In early September, all the tasks of the second class of pipeline were delivered to the newly transferred technical cadres in the field, and the tasks were reduced. From June 5438 to this year 10, I began to take over the installation technical tasks of two steam-driven feed pumps, and my professional skills entered a new stage in dealing with the new tasks. So far, my work focuses on the installation of two steam-driven feed pumps, the installation of temporary steam pipeline purging and the improvement of all steam-water pipeline systems responsible for the first-class pipeline construction.

Second, the work summary

In my years of work, I have never been intimidated by a series of heavy construction tasks and unfamiliar technical work. I have always despised the engineering and technical work I am engaged in. After all, these works have mature construction experience to learn from, and there are many engineers and technicians like me who are engaged in this work together. But I take a cautious attitude in working methods and strategies, because I can accumulate and learn valuable experience from the working practice and details of these systems.

I regard every job given to me by the team leader as a valuable opportunity to accumulate personal work experience. It is my work goal to complete the task successfully, and it is my work attitude to try my best to solve the construction problems. I participated in every construction task that I was responsible for, and fully grasped the key points of the unit project and sub-project construction. Taking the installation of steel platform and circulating water pipe in the steam turbine room as an example, these two construction tasks were the earliest unit projects carried out by the steam turbine team. During the construction of these two projects, I often rush between the main workshop and the circulating water pipe trench to check the implementation of key points of the project and discuss with the construction team leader to solve the construction difficulties. It is precisely because I really put myself into the project construction process that I have mastered the span and verticality of steel platform columns, the installation elevation control of steel column nodes, the connection quality control, the installation quality control of circulating water pipes and so on.

To say hardship and fatigue, every worker on the construction site must have a deep understanding, and as a team technician, I have a special taste in it. At the busiest time of engineering construction, I have to run nearly 20 construction teams every day, and I have to run back and forth from the boiler 6 1 meter floor to the circulating water pump room several times every day for only one reason-I am an engineering technician. Because of the need of work, in the hot weather of more than 40 degrees in summer, I also discussed with the construction team leader to solve the construction difficulties of circulating water pipes and check the construction quality. Since I entered the construction site this year, I have only taken five days off for more than 300 days. The rest of the time, like the workers in the steam turbine team, I worked overtime every day for the smooth commissioning and power generation of the company's first 600mw unit, rain or shine.

As an employee of a modern large-scale enterprise, as an engineer and technician in a new era, I not only work hard, but also constantly sum up my progress. The conventional construction technology has long been firmly in my mind, and the new problems and difficulties encountered in the construction process are the focus of my summary. When the project is busiest, it is impossible to solve everything on the same day every day, so I will classify these things and deal with them in a planned way. Because my only project construction experience before Luzhou project was Panzhihua 135mw project, I had insufficient work experience and encountered many problems. For my shortcomings and mistakes, I corrected them in time, and for the established facts, I took the correct approach, analyzed the reasons from my shortcomings and mistakes, summed up the experience and lessons, and made them my own wealth.

In addition to technical work, I also hold positions in the general branch and installation branch of the engineering project department, and I am also the person in charge of Qing 'an post of the steam turbine team. Participating in youth activities is always my safety. I participate in every activity of the Youth League Committee with my heart and perform my duties well in the activities of the Youth League Committee. In the youth activities, my regret is that due to the busy work, the activities of young workers in the steam turbine team were not carried out as planned, and the propaganda task of the steam turbine site was not well completed in _ _, which is the failure of my project.

Three. abstract

I have always admired such a philosophical saying that a gentleman strives for self-improvement, and I have always demanded myself by the standards of an excellent engineer and technician, and I have made progress myself because of this requirement. The glory of the company needs our efforts to create, and personal development needs our own efforts to achieve. For these lofty goals, I have been making unremitting efforts and struggles. In the future work, I will continue to guard against arrogance and rashness, work hard, closely unite with everyone in the company's big family, realize the company's take-off with my brilliant youth, and write my own chapter with no regrets.

3. Technical summary report of the project

First of all, let me introduce the situation of the yantai wanhua project. Yantai wanhua Project is located in Lingang Chemical Industrial Park, Yantai Economic and Technological Development Zone. Electrical installation mainly includes power, lighting and grounding. The power distribution room includes the installation of transformers and voltage cabinets, cable laying, wiring calibration and debugging. The construction unit is yantai wanhua Polyurethane Co., Ltd., the supervision unit is Beijing Huaxia Petrochemical Engineering Supervision Co., Ltd. and Shandong Qilu Petrochemical Engineering Co., Ltd., and the design units are Lu Hua Engineering Technology Co., Ltd., Shandong Qilu Petrochemical Engineering Co., Ltd. and Shanghai Haicheng Design Institute. Company X has undertaken two sets of main equipment areas, namely yantai wanhua Project Department, Gasification Unit Area and Propane Dehydrogenation Unit Area, including 32 main projects in Gasification Unit Area and 33 main projects in Propane Dehydrogenation Unit Area, with a large amount of electrical instruments, including 18 main project started in Gasification Unit Area and 8 main projects started in Propane Dehydrogenation Unit Area. Yantai wanhua project is different from other projects. When I first came to the project department, I didn't adapt at all. Its management mode introduces DuPont management mode, which puts forward higher requirements for itself and the whole team. With the continuous understanding of Wanhua's enterprise management system, we gradually adapt to its enterprise management mode, which also requires us to be more strict with ourselves. I will think ahead about the work to be done next week. And make preparations in advance and make technical disclosure, and insist on going to the scene at least once a day to understand the actual situation on the spot, so as to know fairly well. The material budget of Wanhua Project is submitted by online process. First, submit the budget of newspaper cardboard materials. After the online electronic board material budget is submitted, the budget is approved and the demand plan is submitted. The required information needs to be found in the OA platform material library. Because there are many and miscellaneous materials in the construction of electrical specialty (many materials are not in the material library and need to communicate with the owner, design and procurement departments repeatedly), which brings us great trouble, so I set up a material coding library myself and a ledger for the material coding of common materials, which greatly saves time and improves work efficiency.

At present, I am responsible for the technical quality of the whole construction site. The two installation areas are far apart. At first, two project departments, two supervision units and three design units really couldn't stand it. So I make a three-day work plan every day, write down my daily work on paper and do it one by one. When I finish one thing, I will eliminate one thing on paper, which improves work efficiency and avoids shaving and eyebrows.

The 20_ year is coming to an end, and I feel that I still have a lot to do. There is still a lot to learn. I feel that on-site learning can learn a lot of new things every day. At the same time, I hope the company can organize more training courses, mainly aiming at the actual situation on the spot. We should emphasize theory and practice as much as possible, and tell everyone about the good construction methods and the problems that should be paid attention to on site. We will try our best to make every work of our instrument and electrical company a bright spot. If our work is not in place, we also hope that the company leaders will give us more criticism and advice, and we will conscientiously complete every task given to us by the leaders. I will refuel!

4. Technical summary report of the project

20_ is an important turning point in my life. Leaving school and stepping into the society, my life has a new starting point, a new beginning and a new goal. Lanshan Tunhe New Materials Co., Ltd. gave me a practical opportunity to apply theory to practice. During my work, my colleagues take good care of me and often give me encouragement and help. I will summarize my work in these months as follows: 1. Work gains.

In the past few months, as a quality inspector, I have carefully studied the company's quality management control process. According to the requirements of job responsibilities, I have the following main achievements:

1, raw and auxiliary materials are sampled and put into storage. I strictly follow the management requirements of the company to avoid missing a lot. Understand the physical and chemical properties of various raw materials and store them reasonably.

2. Sample inspection is a fine inspection process. Details determine success or failure. During the experiment, I do every experiment well with a rigorous working attitude. At present, I have mastered the inspection methods and steps of all raw materials. Thanks to my master and my colleagues, you taught me this.

3. Data Processing When recording data, I record, summarize and report every experimental data based on the principle of "seeking truth and being pragmatic". Make no mistakes and make false reports.

Second, feelings and experiences.

1, attitude determines that all work must be meticulous and meticulous. You can't always make mistakes. If necessary, check the results of your work to make sure that your work is foolproof. After work, we should always sum up work lessons, constantly improve work efficiency and sum up work experience. Although I will make some mistakes in my work and be criticized by my leaders, I don't think this is a shameful thing, because I think these mistakes and criticisms can help me avoid similar mistakes in my future work and make me grow faster in my work. During the time I worked with you, I was deeply impressed by their rigorous and serious work style, and I also learned a lot from them that I lacked.

2. Be diligent in thinking about the daily work of the post. It is tedious and boring in a few days, which requires us to be diligent in thinking about improving working methods, improving work efficiency and reducing working hours.

3. Constantly learning and constantly enriching your professional knowledge and skills will make your work more handy.

If a person wants to make a difference in his post, he must be familiar with the professional knowledge of the post and broaden his knowledge in continuous learning. I am like a blank sheet of paper. I haven't written a word on the company's paper until now. The paper is full of neat handwriting. Leaving school is my second class. Learning to work endlessly is another way of learning. After several months of laboratory study, I have now reached the working level of a regular employee.

Third, its own shortcomings.

1. Occasionally, work mistakes caused by carelessness bring unnecessary trouble to the work. In the future, I will finish my work seriously with a rigorous working attitude.

2, because other people's personality reasons are not active enough. In order to complete the work more perfectly in the future, I will take the initiative to communicate with my leading colleagues. I hope to learn from them what they can't learn in textbooks through conversation.

Since I left school and stepped into this historical stage, I feel that this society is strange for the first time, and everything is difficult for me, whether at work or in interpersonal relationships. After these months of baptism, I really grew up a lot.

The end of 20 years, the arrival of 20 years is the beginning and the end. In front of me, there is a fertile ground for me to gallop, and I clearly feel the heavy responsibility. In the future work and life, I will continue to study and practice in depth, constantly improve myself, and live up to the opportunities and leadership given by Blue Mountain Tunhe and the cultivation of my colleagues. I will grow up with Blue Mountain Tunhe. ...

5. Technical summary report of the project

According to the overall project planning of the Group and its subsidiaries in 20__ _, by the end of 65438+February, with the joint efforts of relevant personnel of the company, * * * Company has completed 9 new products and 9 technical renovation projects 1, successfully applied for 9 patents and obtained 24 authorizations. It has passed the declaration of county-level patent demonstration enterprises, municipal technology research and development centers and provincial innovation pilot enterprises, and the evaluation of municipal patent demonstration enterprises, provincial trademarks, provincial products and municipal enterprise technology centers, and won the second prize of county-level scientific and technological progress 1, municipal top 100 scientific and technological enterprises and other honors. At the same time, in order to further improve product quality, all subsidiaries actively carry out product research and development and production process optimization. The company's technical transformation, scientific research projects and internal production and development tasks have been well completed, and compared with previous years, it has made great progress and achieved gratifying results. In order to do better in 20 years, the summary is as follows: 1. Technical transformation project:

1 and 20__, at the beginning of the year, according to the technical transformation project of 8 million new auto filter, it is planned to invest1570,000 yuan. The subsidiary set up a project team specially. In March, with the cooperation of the technical department and other relevant departments, it fully mobilized the enthusiasm of technicians, aiming at less investment and advanced technology. Through the investigation, research and demonstration of special equipment at home and abroad, the research, installation and debugging of 5 1 equipment have been completed successively, of which 16 equipment has been independently developed and 14 equipment has been put into production. Manufacturing and processing 35 sets of conventional equipment, with a total equipment price of 10 million yuan. Among them, large winding machines and image yarn detectors have also applied for a number of invention patents. Eight sets of production equipment were purchased and reformed, and an oil filter and an air filter production line were added respectively. Among them, the large air filter was officially produced from June 14 to June 10, and now nearly 40 kinds of heavy air filter elements can be produced, and the production is basically on the right track. The automation degree of the equipment invested is relatively higher than that of the same industry, the production capacity is greatly improved, the labor intensity of operators is greatly reduced, and the invested funds are also greatly saved. The technical transformation project has achieved the expected purpose.

2. yingtan _ _ Company has completed the installation and debugging of most main equipment this year, and has reformed some equipment. The post responsibilities, operating rules, analysis and operating rules of raw materials, intermediates, elements and products of each post were compiled, and the post and safety training was carried out for the personnel of each post. Equipped with all kinds of instruments needed by the laboratory.

After repeated argumentation and investigation, the process route of zinc precipitation A and zinc A in flash drying system and the method of treating low zinc oxide raw materials with high chlorine content, high chlorine content in raw materials after washing and high chlorine content in washing water with activated carbon can not meet the expected requirements of nanometer scale and high purity. On the premise that the chlorine content of raw materials before entering the leaching process is less than 65438 0.0%, sodium chloride and sodium sulfate are recovered once by flake caustic soda process, and sodium salt recovery equipment is added. At present, sodium salt recovery equipment is being negotiated with suppliers.

The industrialization project of 30,000 industrial robots and key components has been postponed repeatedly since it was established, because the land has not been implemented. At present, the project land has been basically implemented, and the workshop drawings have entered the design stage.

Second, scientific research projects

The new product research and development project of 1. subsidiary shall be undertaken by the technical department. Since the beginning of this year, 9 new products in auto filter have been completed, including 6 new products approved by government departments (2 by the Bureau of Information and Economics and 4 by the Science and Technology Bureau), which passed the provincial new product appraisal in February 1.2 million yuan respectively, and the estimated government subsidy is 1.2 million yuan. The research and development of three new products independently established have also been completed, and all the performances have reached the predetermined goals. At the same time, "UC-5899 Multifunctional Composite Diesel Filter" won the second prize of county-level scientific and technological progress for 20 years.

In terms of technical reserves, the subsidiary specially organized the R&D team to develop 1 1 new products, covering filtration and separation products such as automobiles, environment, cigarettes and equipment, among which six products, such as PA end cover 07 series oil filter, screw air compressor oil separator, CNG low-pressure filter assembly, crankcase oil separator, Tenneco urea filter and air purifier filter three nets, have been designed. In cooperation with South China University of Technology, an integrated glass fiber tube was developed. South China University of Technology has tried the samples, and the company is testing the performance of the samples. Using 3D technology, the air purifier of armrest box is designed and put into market promotion.

At the same time, the technical department has produced about 500 kinds of routine samples from the main engine factory and developed more than 10 new products, among which the marine filter assembly (mechanical filter and diesel filter) of Hangfa has filled a blank in the product types of its subsidiaries. The key project of Yangchai VM project is tracked and verified, and the whole project is progressing smoothly.

2. The "Articulated Robot for Assembly" reported in the name of the group was a major scientific and technological project at the county level in 20__ _. Since the project was approved by the Municipal Science and Technology Bureau in 20__ _, due to the lack of technical strength, the research and development work has been stagnant. After the establishment of the company's robot automation division this year, the research and development of this project was restarted, and the completion time was postponed to the county science and technology bureau. At present, some drawings of the four-axis robot have been designed, which is expected to be completed in September 20__.

3. In September, 2000, the subsidiary company reported the "Oil Lubrication Module System", a major scientific and technological project at the county level in 2000. The total investment of the project is expected to be 2 million yuan, and the economic benefit is expected to reach150,000 yuan, with profits and taxes of 2.7 million yuan. At present, the project has passed the evaluation and publicity of experts from the Science and Technology Bureau, and will be formally established after a field trip to the company before February 2000.

4. The subsidiary also applied to the relevant government departments for the provincial enterprise technology center, county-level patent demonstration enterprise, municipal enterprise technology research and development center, provincial innovation pilot enterprise, municipal high-skilled talent innovation studio and municipal three cultivation demonstration enterprises. Among them, county-level patent demonstration enterprises and municipal-level high-skilled talent innovation studios have been approved, and provincial-level innovation pilot enterprises have passed the expert review of the Provincial Science and Technology Department, and are expected to be approved after doing their work. The provincial enterprise technology center failed to guide the intermediary and did not understand the evaluation experts, which led to the failure of the on-site defense and failed to pass.

At the same time, the municipal enterprise technology center has won excellent evaluation for 20 years. There are *** 150 municipal enterprises, of which 27 are excellent, and 2 are excellent at county level, among which subsidiaries are one. And successfully declared the municipal enterprise technology research and development center.

In addition, the subsidiary also passed the evaluation of provincial brand products and provincial trademarks and won the online technology auction award of 45 thousand yuan; And has been rated as one of the top 100 municipal science and technology enterprises for 20 consecutive years.

Environmental technology company is committed to upgrading detergent. T30 has been repeatedly tested with domestic raw materials instead of imported raw materials, and its performance is basically the same as that of imported raw materials. The tire care brightener and advertising wax care agent were tested and developed, and the test results were basically consistent with the American samples. The research and development of cleaner products began in September, and so far the function and color have basically reached the effect of Italian "cock head" samples. The fragrance and stability of this product are being tested and developed.

However, "T30" product was developed to replace phosphating solution, and repeated tests were carried out with different concentrations, different humidity and different formulations, and the effect was not satisfactory. The "7.3" gel test was carried out many times with five different raw materials, and the effect was not ideal. The effect of leather care agent developed by experiment is worse than that of American samples, and now we are looking for raw materials to improve it.

6. Three provincial key new products of yingtan _ _ Company passed the examination; After repeated argumentation, the zinc A process was finally rejected, and a systematic process condition was adopted. Two schemes of the primary system (alcohol recovery and direct recovery) were verified in the laboratory, and both achieved the expected results. Compared with the two processes, the raw material consumption and equipment investment of direct recovery are low, and the produced zinc oxide meets the product requirements of high-purity zinc oxide (≥99.9%) and meets the requirements of food-grade sodium sulfate.

Three. patented invention

The subsidiaries applied for 9 invention patents in 20__ years, of which 7 passed the preliminary examination and substantive examination, and 24 were authorized from 20__ to 20__. Obtained a patent subsidy of 37,800 yuan.

Four. Award summary

1. Awards and subsidies received

2, 20__ years have been completed to declare the rewards and subsidies that have not been obtained.

Problems with verbs (abbreviation of verb)

1. The technical personnel are highly mobile, resulting in the discontinuity of project development and construction.

2. The project management process is not smooth, and the job responsibilities are not clear, which leads to the uncertain boundary of the work scope and low work efficiency.

3. The lack of reward and punishment measures for project construction has affected the enthusiasm of technicians to some extent. Insufficient estimation of the difficulty of the project and unfamiliarity with the processing technology lead to repeated revision of the design process and production process, resulting in waste of raw materials and labor, which is very common; At the same time, there is a waste of materials and labor caused by nonstandard design drawings, which delays the progress of the project.