Traditional Culture Encyclopedia - Weather forecast - Earthwork construction scheme in rainy season

Earthwork construction scheme in rainy season

Rain can be said to be the biggest weather constraint in earthwork construction.

First of all, the dump truck is preferably double-bridge;

After the rain, the soil yard and roads should be drained in time, the soil on the surface can be pushed off by bulldozers, and the small dead pit can be filled with dry soil;

The main construction roads can be done better by properly investing some funds. Take new soil to heighten the road surface, mix lime with rotary tillage, and then roll it.

Ditching can be used to control the moisture in soil fields;

After the rain, the soil on the construction surface should be turned over and compacted in time, otherwise it will be difficult for heavy vehicles to get in.

We should always pay attention to the weather changes, make accurate judgments, and close the working face before it rains, which can greatly reduce water seepage and make on-site drainage measures in advance.