Traditional Culture Encyclopedia - Weather forecast - What are the precautions for installing and disassembling the drilling rig?

What are the precautions for installing and disassembling the drilling rig?

When installing and disassembling the rig, the rods used to lift the components of the rig should have sufficient strength. Dismantling the drilling rig should be done layer by layer from top to bottom. When entering the airport, you should wear work shoes, work clothes and safety helmet.

Safety training manual for geological drilling engineering

What are the precautions for installing and disassembling the drilling rig?

The installation and disassembly of drilling rigs are generally high-altitude operations, which are dangerous. When the operator is unskilled, paralyzed or inconsistent, it is easy to cause injuries such as falling in the air and being hit by objects. It is forbidden to install or disassemble drilling rigs at night or in strong winds, thunderstorms, heavy fog, heavy snow and other weather.

Safety training manual for geological drilling engineering

What are the precautions for installing and disassembling the drilling rig?

Before installing or putting down the drilling rig, the ground anchor should be buried firmly. During the operation, the operator should leave the lifting range of the drilling rig, and a special person should control the guy rope. When lifting and lowering the derrick, the safe distance between the outer edge of the derrick and the edge of the transmission line shall meet the requirements listed in the drawings.

Safety training manual for geological drilling engineering