What are the disadvantages of summer decoration and winter decoration?
1. In summer, when the air is dry, the dust in the air is easily adsorbed in the paint, and bubbles are easily generated when painting. At the same time, in high temperature days, the thinner volatilizes quickly, and the paint is easier to crack and shell than in other seasons.
2. Under the influence of high temperature, the phenomenon of "backward convex" often appears in the construction of wood structure, that is, after the construction of wood structure is completed, the lines will shrink at the convergent position, resulting in uneven edges and corners. Therefore, it is best to stay for a period of time before planing, so that the wood line can fully expand and contract.
3. The rainy season is from mid-June to early July every year, with many rainy days and high humidity, so be especially careful. Whether it is the laying of solid wood floor or composite floor, try not to do it in rainy days, otherwise it will be prone to deformation or hollowing, especially on the first floor, and moisture regain will occur after installation.
Second, the disadvantages of winter decoration:
1, winter decoration period is not easy to grasp.
The cold winter will affect the state of construction workers, so it is normal for workers to delay the construction period. At the same time, winter decoration should pay attention to the construction site, dry weather, fire prevention and electricity prevention.
Winter decoration needs to be properly arranged. If you can't finish it before the Spring Festival, you should be prepared for the renovation of the Spring Festival and calculate the time for workers to rework after the holiday! It is suggested that the owner can complete the hydropower project before the Spring Festival, which is the initial stage and the most important part of the renovation. It will not affect the following projects after the spring of next year.
2. The cohesiveness of cement mortar will be affected.
For winter decoration construction, the weather conditions are really bad, and all winter decoration also has disadvantages.
It is very cold in winter. In winter decoration construction, too low temperature will affect the cohesiveness of cement mortar, and the pasted bricks may fall off in the coming year.
Extended data:
Acceptance after transformation:
1, before admission
See whether the demolition and reconstruction project meets the requirements of the contract, whether there are potential safety hazards, whether the wall treatment is clean, and whether the quantity, grade and specification of the materials entering the site are consistent with the prior agreement.
2. Waterway
The second stage of acceptance should be a separate acceptance of waterway and circuit transformation. Consumers should check whether all reconstructed lines are smooth, reasonable in layout and standardized in operation under the operation of professional hydraulic or electrician, and reconfirm the actual dimensions of line reconstruction. The putty worker can only seal the wall and scrape putty after changing the line.
3, woodworking work size
The third acceptance shall be carried out after the completion of woodworking foundation. At this point, the ceiling and plastering line in the room should also be completed, and the wall tiles in the kitchen and bathroom have also been pasted. At the same time, the walls that need to be painted should be scraped twice. The acceptance work at this stage is very important. Consumers should carefully check the drawings and confirm the dimensions of each part. If any discrepancy is found, the construction team shall be promptly reminded to modify it.
4. Quality of woodworking work
When all the veneers of fine wood products are pasted and the wood lines are glued, consumers can carry out the fourth stage of acceptance. This time is basically the middle stage of construction, and the inspection at this stage should focus on the color difference and texture of wood products, as well as the flatness and uniformity of a large area.
After the woodwork is finished, the oilman can start the priming treatment. At this stage, all the floor tiles should be pasted, which is the fifth stage of phased acceptance.
5. After completion
The final acceptance content is the most comprehensive and thorough. Consumers should check the installation of treadmills, sanitary wares and hardware, whether the veneer of wood products is in place, whether the coating on the wall and top surface is uniform, whether the panel and lamps installed by electricians are in the right position and whether the wiring is correct. In addition, consumers should ask the construction team to clean the room thoroughly before leaving.
People's Network-Seasonal Decoration in Long Summer? Don't make these mistakes in summer decoration.
People's Network-Winter? Can you still decorate the house?
Baidu encyclopedia-decoration
- Previous article:Classical lyric prose of famous artists
- Next article:The original text of Shi Tianzhang's drama Rain and Moon Tales ~ Chrysanthemum ~.
- Related articles
- What are the famous tourist attractions in Chaohu Lake?
- How to recuperate the hot weather with acne?
- I am from Yongkang. What is the fastest and cheapest bus route to Xiangshan?
- Can hydrangea bask in the sun in summer?
- Semporna weather forecast
- What are the legends of the twelve constellations?
- Are there many people going to Qinghai Lake on National Day?
- Should men wear vests under their shirts?
- How did the China Volunteers compete with the US military for the Western Hills of Matari?
- Zhuge Liang's clever plot to borrow Dongfeng shows his ingenuity.