Emergency plan for thunderstorm weather in paper mill
In life, work and study, some unexpected things will inevitably happen. In order to control the development of accidents, emergency plans are often made in advance according to specific conditions. So what problems should we pay attention to when preparing the emergency plan? The following is my emergency plan for thunderstorm weather in paper mill, I hope it will help you.
Emergency Plan for Thunderstorm Weather in Paper Mill 1 1. Preparation and Safety Measures
1, close the doors and windows of high and low voltage power distribution room, power distribution room and control room in time.
2. Check whether the emergency power supply is normal and sufficient.
3, check whether the lightning arrester is running normally.
4. Check whether the flood control equipment can be used normally, whether the water pump wiring is damaged, whether the grounding wire is reliable and other security risks, and whether the standby flood control equipment can be put into operation in time.
5. It is forbidden to maintain and test outdoor high-voltage equipment and indoor lead-in lines.
6, it is strictly prohibited to pour brake operation in lightning weather.
7. In case of serious personal safety hazards, you can disconnect the power supply without waiting for instructions, but you should immediately report to the dispatcher and relevant leaders afterwards and make records.
8. In case of severe weather such as gale and thunderstorm above level 6, outdoor operation should be stopped.
9. When the uplink and downlink lines are blacked out due to lightning strike, it shall be handled according to the Emergency Plan for Emergency Blackout.
10, when lightning strikes, try to reduce the patrol of high and low voltage electrical equipment alone. When it is necessary to patrol high-voltage equipment, no other maintenance work is allowed, and no moving or crossing obstacles is allowed.
1 1. When lightning strikes, don't hide under steel structures and tall trees, and don't get close to lightning arresters and lightning rods.
12, when it thunders and lightning, it is not allowed to make phone calls and receive communication equipment outdoors.
13. When high-voltage equipment is grounded, indoor personnel should be 4m away from the fault point and outdoor personnel should be 8m away from the fault point. Personnel entering the above range should wear insulating boots and gloves when contacting the equipment shell and frame.
14. In case of thunderstorm, computer users should immediately cut off the computer power and unplug the power plug and the network cable plug connected to the network equipment. And unplug the connecting cable of the external equipment.
15. Pay close attention to the operation of computer and network system after thunderstorm weather. In case of power outage accidents that affect the normal operation of network equipment and information systems, you should contact relevant departments as soon as possible to repair power and network equipment and make every effort to ensure the safe and smooth network and communication.
Second, the emergency plan for abnormal thunderstorm weather
1, the concept of abnormal thunderstorm: refers to sudden fog and rainstorm in some or most areas, which seriously endangers the safe operation of production and may cause serious personal injury and equipment damage accidents.
2. Risk degree analysis of the factory area: Abnormal fog, rainstorm and lightning weather caused some lines to trip, and high and low pressure water intakes, cooling shed and finished product warehouse water intakes caused combustion and explosion accidents.
2. 1 cooling shed: during the rainstorm, the water level suddenly rises, the drainage is not smooth, and the water flows into the cooling shed, causing fire and explosion.
2.2 Finished product warehouse: strictly prevent water from flowing into the finished product warehouse during rainstorm, causing equipment damage and fire and explosion.
2.3 Cable trench: Water may enter during the rainstorm, resulting in cable short circuit and equipment tripping.
2.4 outdoor junction box and control box: it is easy to cause misoperation, refusing action or short circuit.
2.5 Gas holder: During rainstorm, it may cause misoperation of protection and gas leakage.
2.6 communication system interruption.
3. Basic principles of emergency response
3. 1 This plan is specially formulated for timely, effective and rapid handling of accidents such as waterlogging and external waterlogging caused by rainstorm, loss of major equipment accidents, reduction of major economic losses and impacts, establishment of rapid rescue and emergency handling mechanism when accidents occur, protection of life and property safety of employees, and maintenance of normal production and work order.
3.2 This plan is based on the principle of "people-oriented, safety first and prevention first".
3.3 Organization and responsibilities
3.3. 1 Emergency Leading Group
Team leader: Peng
Members: Wang Li Guoqing Zhou Yusong He Xiu Zhang Jian Wang Yanqin Li Zhongyu Han Zhongsheng Wang Wei Teng Yongyue Huang Xiaoyan Yang Jianping Chai Fu Yang Deyong Zhang Yaoxin Li Lei Wang Feng Huang Kui Meng Li Zheng Ruihua Wang Yucheng Xue Pengtao Chang Xinrong Han Xiangjun Ren Jinhe Block Jilong Wang Jianxin Ma Wenlong Yin Pengpeng Jiao Bin
3.3.2 The main responsibilities of the company's severe weather emergency leading group are:
(1) Carry out the laws and regulations of the superior on emergency rescue and treatment of accidents;
(2) Accept the leadership of the provincial company's emergency leading group and request the local government to provide emergency assistance for the company's emergency handling work;
(3) Unified leadership of the company's emergency rescue and emergency treatment;
(4) Study on major emergency decision-making and deployment;
(5) Announcing the company's entry and lifting the early warning;
(6) Declare the Company to enter and lift the state of emergency;
(seven) to decide on the implementation and termination of the emergency plan;
(8) Release relevant information.
3.4 Emergency Office
3.4. 1 the emergency leading group has an office, which belongs to the safety management department and is responsible for daily work.
3.4.2 Main responsibilities of the office:
(1) Implement various tasks assigned by the emergency leading group;
(2) Supervise the implementation of emergency instructions issued by the emergency leading group;
(3) Organize to formulate emergency plans and supervise their implementation;
(4) Grasp the emergency handling situation and report the major problems in the emergency process to the emergency leading group in time.
3.5 Emergency Professional Working Group
3.5. 1 The emergency office consists of warning evacuation guidance group, technical consultation group, on-site rescue group, logistics support group and disaster investigation and after-treatment group. Responsible for implementing the instructions of the emergency leading group and coordinating the command discipline.
3.5.2 The responsibilities of each team are as follows:
3.5.2. 1 warning evacuation guidance group: responsible for on-site public security, traffic command, setting up a cordon to prevent irrelevant personnel from entering the warning area, guiding personnel to evacuate, and ensuring materials.
3.5.2.2 Technical Advisory Group: responsible for studying and determining on-site rescue and emergency rescue plans, proposing emergency safety technical measures and providing technical support for on-site command.
3.5.2.3 on-site rescue team: responsible for on-site rescue, emergency rescue, timely control of dangerous sources, and actively take safety measures to prevent accidents from expanding.
3.5.2.4 logistics support team: responsible for transportation, ensuring vehicles needed for transporting rescue personnel, materials and equipment, and ensuring smooth rescue roads; Responsible for providing emergency rescue equipment and materials; Provide relevant protective articles needed for emergency; Responsible for living security, providing rest places, food and other necessities.
3.5.2.5 Disaster Investigation Aftercare Team: Participate in the disaster investigation aftercare team composed of the unit, its superior competent department and local government departments, and be responsible for providing relevant original materials and handling related matters.
4 Prevention and early warning
4. 1 Hazard monitoring
4. 1. 1 Establish and improve the safety management rules and regulations for enterprises to prevent abnormal thunderstorm weather disasters, formulate emergency plans, improve the responsibility system for production safety at all levels, and strengthen the accountability system.
4. 1.2 Formulate a feasible safety education and training plan, educate employees to continuously improve their safety awareness, carry out safety education and safety production skills training, and effectively improve employees' ability to protect themselves and avoid accident risks.
4. 1.3 hold emergency drills for abnormal thunderstorm disasters on a regular basis every year, so that employees can be familiar with the emergency work flow and master the essentials of emergency work, find out the problems existing in emergency preparation through drills, and make timely rectification.
4. 1.4 Organize special inspection on prevention of abnormal weather disasters, focusing on inspection of preparation for prevention of abnormal weather disasters, implementation of emergency plan and responsibility system for prevention of abnormal weather disasters, key monitoring parts for prevention of abnormal weather disasters, and reserve of materials for prevention of abnormal weather disasters.
4. 1.5 Strengthen the inspection of safety facilities at the production site, and further improve the safety facilities and signs at the site. Improve the working environment so that the production site has strong ability to resist abnormal weather disasters.
4. 1.6 Prepare special operation modes and anti-accident plans for preventing abnormal weather disasters, and organize learning and drills.
4. 1.7 is responsible for comprehensive maintenance of emergency mechanical equipment and electrical equipment such as flood control and drainage equipment, submersible pump and emergency lighting facilities before the arrival of abnormal weather disaster season.
4. 1.8 Before the occurrence of lightning disaster weather and climate, the grounding and lightning protection safety measures of electrical and control equipment must be checked.
4.2 Early warning actions
4.2. 1 The company shall, according to the local stage and seasonal characteristics, combine the forecast information of environment, abnormal fog, rain and snow weather disasters, and carry out the analysis and assessment of risks related to abnormal weather disasters in accordance with the principles of early prediction, early notification and early arrangement. Start the warning after receiving the following extreme weather warning.
4.2. 1. 1 rainstorm orange warning signal: within three hours, the rainfall will reach more than 50 mm, or it has reached more than 50 mm and the rainfall may continue.
4.2. 1.2 foggy orange warning signal: fog with visibility less than 200m may appear within 6 hours, or fog with visibility less than 200m and more than 50m has appeared and may continue.
4.2. 1.3 yellow warning signal of thunderstorm and gale: it may be affected by thunderstorm and gale within 6 hours, and the average wind force can reach above 8, or the gust is above 9 accompanied by strong lightning; Or have been affected by thunderstorms and strong winds, with an average wind force of 8-9, or a gust of 9- 10 accompanied by strong lightning, and may continue.
4.2.2 Early warning instructions shall be issued by the Safety Supervision Department and issued to subordinate departments by the first person responsible for production safety.
4.2.3 After entering the early warning state, relevant units in the early warning area should take the following measures:
4.2.3. 1 according to the requirements of the emergency plan, check and confirm that all kinds of protective equipment, medical equipment, vehicles, communication equipment, fire fighting equipment, standby power supply equipment for production and lighting, testing equipment and equipment, and all kinds of emergency materials and equipment used for emergency must be fully equipped.
4.2.3.2 inspected and confirmed the alarm methods, contact methods and signal usage regulations of various communication tools, and confirmed that all rescue teams were familiar with the corresponding methods and steps to be taken after the incident.
4.2.3.3 inspected and confirmed that the evacuation passage and assembly place were safe and reliable, and transferred, evacuated or evacuated people from areas that might be endangered, and made proper arrangements. Close, isolate or restrict the use of relevant places, and suspend operations or activities that may lead to the expansion of hazards.
The emergency leading group of 4.2.3.4 started to work, and called the emergency working group and emergency rescue team to enter the site.
4.2.3.5 should cooperate with power grid dispatching.
5 information reporting procedures
5. 1 instant report
5. 1. 1 After the occurrence of abnormal weather disasters, the emergency team shall immediately report to the principal responsible person of the unit. The contents of the report include: the time of the disaster, the type of the disaster, the brief course, the number of casualties, the loss of equipment and property, the professionals and emergency equipment needed for on-site rescue, etc.
5. 1.2 The procedures for instant telephone reporting are as follows:
(1) The person in charge of the site reports to the leader of the emergency team.
(2) The safety department of the company reports to the safety production department of the group company.
5.2 Abnormal Thunderstorm Disaster Event Express
After the occurrence of abnormal meteorological disasters, the affected units shall report the meteorological disasters in writing to the Group Company by telephone or WeChat within 30 minutes after completing the quick report. Express delivery shall include the following contents:
(1) Time and place of abnormal weather disasters.
(two) the brief course of abnormal weather disasters, the number of casualties and the preliminary estimate of direct economic losses; Preliminary statistics of equipment damage; Whether it has an impact on society, etc.
(3) Preliminary judgment on the causes of accidents caused by abnormal weather disasters.
(4) Emergency response, measures taken and accident control after meteorological disasters.
6. Emergency treatment
6. 1 response classification
According to the accident level, our factory's response to accidents caused by abnormal weather disasters can be divided into: Class III response: ordinary personal accidents and ordinary equipment accidents caused by abnormal weather disasters are enterprise-level emergencies, and our factory organizes accident emergency work.
6.2 Response procedure
After receiving the abnormal weather disaster forecast from the meteorological department, the safety department of the company immediately notified relevant departments and emergency teams to take preventive measures and issued an early warning. After receiving the immediate report of the accident, according to the instructions of the leader of the emergency team, immediately start this plan and notify relevant personnel to rush to the scene to carry out rescue.
Emergency work for abnormal weather disasters Under the leadership of the company's emergency leading group for abnormal weather disasters, the on-site commander-in-chief comprehensively organizes and directs the emergency work for accidents, and timely informs all professional groups to carry out rescue according to the rescue needs.
6.3 Disposal measures
When an abnormal thunderstorm weather disaster occurs, the leader of the emergency team should immediately start this plan and organize various professional teams to carry out emergency rescue and disaster relief.
6.3. 1 Safety of cooling shed and finished product warehouse:
(1) Empty the calcium carbide in the finished product warehouse before it rains. When it starts to rain, all the calcium carbide crushing equipment will be shut down and cut off. Check that the ventilator on the fourth floor of the finished product warehouse is normally open and the windows on the fourth floor of the finished product warehouse are closed.
(2) Before it rains, sandbags (height above 50cm) shall be piled at the entrance of cooling shed and finished product warehouse to prevent rainwater from entering the cooling shed and finished product warehouse.
(3) Pull down the rain curtain at the entrance of the broken line before it rains, and pile sandbags (height 50cm and above) below.
(4) When it rains, the personnel on duty of cooling shed and finished product warehouse will patrol the site continuously, and special personnel must be arranged to guard the entrance of cooling shed and finished product warehouse in low places; Leak points shall be connected to barrels, contained and covered in time, and reported and recorded; Check the drainage facilities, keep them unblocked, and report any abnormality in time.
(5) If rainwater enters the cooling shed and the finished product warehouse, the personnel found immediately start the special emergency plan for the fire accident in the calcium carbide warehouse. First of all, immediately report to the workshop leader, cut off the water source material, and use the nearby dry powder fire extinguishing equipment to put out the initial fire of the calcium carbide warehouse; Secondly, use a lot of dry sand and soil to bury the calcium carbide in the fire to control the spread of the fire; When the source of acetylene gas cannot be eliminated, the fire should not be put out, and only the harm of the fire to the surrounding facilities and equipment can be controlled. When the calcium carbide warehouse is on fire, evacuate the people around it, especially the workers working in the downdraft of the calcium carbide warehouse;
6.3.2 Safety of main parts such as high and low voltage room and UPS cabinet room: During the rainstorm, the accumulated water in the factory area cannot be drained in a short time, and the emergency team should immediately take measures to prevent rainwater from flowing backwards around the high and low voltage room, main factory building, pump room and air compressor room (sandbagging to dredge drainage). If the roof of electrical facilities leaks, it should be covered with plastic sheets. When it is serious, cut off the power supply in time.
When water enters the cable trench, it shall not be treated at will, and personnel are prohibited from entering the cable trench. Should be handled according to the following requirements:
(1) Check the water seepage point and block it with sandbags or soil to prevent a large amount of water from entering the cable trench;
(2) When there is a small amount of water seepage (the water level is below 15cm), professional electricians should wear insulating boots and gloves to check on the cable ditch cover plate. When measuring the water level, insulating materials must be used, and the water level in the cable trench should be closely observed. When a large amount of water enters (the water level is above 15cm), the submersible pump should be used to drain the water in the cable trench in time. Before using submersible pump to drain water, the electrician must check and confirm that there is no leakage in the cable trench.
(3) When a large amount of water can't be controlled, the power supply should be cut off before the drainage treatment, and the power must be carefully checked before sending, and the power can be sent only if it meets the requirements of sending.
Outdoor equipment (junction box, control box) enters water, which will cause misoperation and refusal of protection and automatic devices, and even cause shutdown and tripping in serious cases. Electrical professionals should strengthen the inspection of outdoor equipment, take safety measures to prevent electric shock, check the outdoor junction box and cabinet door of control box, check whether it leaks rain and take rain-proof measures. When the outdoor terminal box and control box are flooded, the post personnel should report to the workshop duty leader in time and contact the electrician to cut off the power supply. After the power is cut off, the electrician will check and dry it.
Whenever employees in the factory find abnormal phenomena such as lighting and arcing, they must report to the factory for handling.
6.3.3 Safety of calcium carbide furnace purification system and furnace gas conveying system: When thunderstorm weather causes emergency braking and interlock failure of calcium carbide furnace purification system and furnace gas conveying system, emergency stop should be made; In case of carbon monoxide leakage, immediately start the emergency plan for carbon monoxide leakage.
6.3.4 If the thunderstorm weather causes water and power failure in the whole plant, the emergency plan for water and power failure in the whole plant should be started immediately.
6.3.5 Relevant personnel of the carbon material and lime yard in the raw material workshop shall ensure that the drainage facilities are in good condition to prevent the open-air carbon material from being washed away by rain, resulting in coke loss or large-scale collapse; Be careful of being burnt by soaked lime.
6.3.6 During the rainstorm, all workshops and departments should immediately organize personnel to enter the production site and organize emergency rescue to ensure normal operation. All outdoor operations except first aid should be prohibited, outdoor equipment should be checked in time, water leakage of building facilities should be checked, and treatment should be arranged in time.
6.3.7 After the rainstorm, electrical professionals should check the operation of all electrical equipment, high and low voltage rooms and power distribution rooms.
6.3.8 In thunderstorm weather, it is forbidden to wear wet clothes, shoes and gloves for electrical operation. When the post personnel wash their eyes, they must ensure that the long leather gloves and labor protection shoes are dry to prevent electric shock accidents.
6.3.9 Communication system interruption: When employees find that the communication system (telephone, network) in the factory area is interrupted, they should use mobile phones and walkie-talkies to report this abnormal situation step by step, and contact the relevant posts at the upper and lower levels to prevent accidents due to communication interruption and untimely communication.
When the surveillance video is interrupted, the personnel in the central control room will report it immediately and contact the team leader to check the situation on the spot. The workshop will contact the personnel of the intelligent department for handling, and arrange special personnel to increase the number of post inspections.
7. Emergency materials and equipment support: The workshops and departments are responsible for the reserve of emergency resources. Reserve the following materials: woven bags, submersible pumps, water pipes, cables, rain boots, raincoats, plastic sheets, shovels, medicines, medical devices, etc. And prepare emergency vehicles and emergency communication equipment.
Emergency Plan for Thunderstorm Weather in Paper Mill 2 Purpose: Before typhoon, thunderstorm and other natural disasters come, make all emergency preparations in advance, control the situation quickly and effectively, handle it properly, and minimize the possible losses caused by typhoon and thunderstorm.
Initiation of this plan: After receiving the typhoon and thunderstorm warning signal issued by Shenzhen Meteorological Observatory, this plan was officially launched.
Responsibilities of each department of the management office: order maintenance group: check whether there are sundries on the floor and inform the cleaning class to clean them immediately, and check whether the doors and windows on each floor are closed or hung; Whether the basement drain is blocked, close the windows of the fire stairwell on the east and west floors.
Cleaning class: clean up the sundries in the sky to ensure that there are no omissions; Cooperate with the engineering department to check whether the sewer pipe and basement drain pipe are unobstructed.
Engineering Department: Check whether the basement equipment grounding is normal, whether the components of the ceiling cooling tower are loose, whether the lightning protection grounding network is disconnected, and whether the drainage pipe is unblocked, so as to ensure that the basement water pump keeps working normally.
Customer service center: print typhoon and thunderstorm notices and post them in the notice column. The assistant reminded the business owners in the responsible area to close the doors and windows after work and turn off the main power supply of the office.
Working procedure: After receiving the notice of typhoon and thunderstorm issued by the superior or meteorological station, the management office immediately reports to the relevant leaders and forwards it to all post departments. All the staff in the management office can recognize the signals and meanings of typhoons and rainstorms. After receiving the notice, all departments should immediately organize their own personnel to do a good job in wind and lightning protection according to the responsibilities of the above departments, and fill in the checklist.
Paper mill thunderstorm emergency plan 3 1.0 purpose
Standardize the preparation, handling procedures and methods of the company's organs and management offices to prevent typhoon and rainstorm.
2.0 scope
It is suitable for emergency treatment of severe weather such as typhoon, rainstorm and strong tropical storm in company offices and communities.
3.0 responsibility
3. 1 general manager: responsible for the overall coordination of typhoon and rainstorm prevention in the whole company.
3.2 Quality Management Department: responsible for collecting typhoon and rainstorm information and reporting it in time; Responsible for checking the implementation of typhoon and rainstorm prevention preparations in various communities.
3.3 Engineering Management Department: responsible for organizing the inspection and prevention of mechanical and electrical equipment, ensuring the normal operation of mechanical and electrical equipment and reducing the loss of force majeure.
3.4 Office: responsible for dispatching vehicles and human resources, supporting emergency rescue work in key communities in time, checking the situation of community duty and sticking to their posts, and providing logistics services for on-site emergency rescue personnel.
3.5 Management Department: responsible for organizing reserve management personnel to support emergency rescue work and assisting the director of key residential area management department to direct emergency rescue.
3.6 Maintenance Center: responsible for inspecting the mechanical and electrical equipment within the scope of duties, and assisting and guiding the management office to carry out maintenance.
3.7 Director of Management Office: responsible for the overall on-site command of typhoon and rainstorm prevention in this community, checking and storing emergency materials and equipment, arranging 24-hour duty to accept residents' application for repair in time and report the loss in time.
3.8 All employees: During the typhoon and rainstorm, all employees of the company must stick to their posts.
Or wait in the residence, keep the communication open, go out without asking for leave, and wait for orders at any time. For typhoon signals above blue and rainstorm signals above red, the responsible personnel must be on duty and stick to their posts; For typhoon signals above orange and red rainstorm signals, managers of all functional departments of the company must go to the hanging point community to guide the defense work.
4.0 content
4. 1 The company's organs are on duty during the typhoon and rainstorm.
4. 1. 1 The general manager is the person in charge of the company's organs on duty and is responsible for overall coordination.
4. 1.2 The manager of the quality management department is responsible for checking the implementation of the preparation for typhoon and rainstorm prevention in the community; Track typhoon information and inform superior leaders in time.
4. 1.3 The manager of the engineering management department is responsible for checking the implementation of the preventive measures and emergency measures for the mechanical and electrical equipment in the community.
4. 1.4 the director of the office is responsible for checking and implementing the situation that all employees stick to their residences and stand by, checking the situation of being on duty and sticking to their posts in the community, checking whether employees' communication is smooth, dispatching vehicles and human resources, organizing and supporting emergency rescue work in key communities in time, and providing logistics services for on-site emergency rescue personnel.
4. 1.5 the manager of the nursing department is responsible for organizing the backup nurses to support the emergency rescue work according to the instructions, and assisting the director of the key community management office to direct the emergency rescue.
4.2 Management Office's preparation for typhoon and rainstorm.
4.2. 1 Preventive measures organized and implemented by the customer service supervisor.
A, track the typhoon and rainstorm progress information broadcast by the meteorological station, report the latest typhoon and rainstorm signals to the superior at any time and announce the residents, and adjust the preparation work in time.
B, in the community issued a notice to prevent typhoons and rainstorms, to remind residents of the following matters:
1) Try to stay at home, close the doors and windows, and tie up articles that are easily blown down by the wind.
2) Don't stay near the glass doors and windows for a long time to prevent the glass from breaking and hurting people. 3) Remove items placed on windowsills and balconies, such as flower pots, to prevent people from falling.
4) Avoid staying in an open place and walking away from tall trees to prevent injury.
5) Check the floor drain and drain pipes of balconies and private gardens to prevent blockage.
C, contact the greening company to reinforce the greening plants; Move potted plants to low-lying places or hidden corners.
D, supervise the cleaners to remove the sundries and floor drain deposits on the roof of the house;
4.2.2 The maintenance monitor shall organize the implementation of preventive preparations.
A, check and ensure that all sewage pumps can work normally; Check drainage facilities such as drainage pipe network, ditches, sewage wells and floor drains to ensure smooth drainage.
B, check the standby generator in the community, reserve enough diesel to ensure the normal operation of the generator.
C, check the elevator shaft, elevator room, equipment room and other doors and windows to prevent rain soaking measures.
4.2.3 Preventive preparations organized and implemented by the head of the pipeline protection team.
A, responsible for checking vacant houses and closing doors and windows, and checking and closing doors and windows of public corridors.
B. Check the room number of the household whose doors and windows are not closed, and contact the household to close the doors and windows in time.
C, stop outdoor construction work, urge the construction unit to do a good job of safety reinforcement of construction facilities such as sheds and scaffolding, and set warning signs in temporary ditches and pits to prevent accidents.
D, check the billboards inside and outside the community, and dismantle the billboards and neon lights that can't withstand typhoon and rainstorm in advance.
E, strengthen community inspection, avoid underground garage, elevator shaft and other stagnant water parts.
F, check the emergency tools and equipment performance is good.
G, check to ensure that the first aid kit basic drugs are available.
H, reserve enough sandbags for flood control. Without affecting the service, build a water retaining wall with sandbags in advance in places that were easily flooded before.
4.3 Duty work of management office during typhoon and rainstorm.
4.3. 1 The director of management office is the person in charge of duty in this community. He should always check, be good at finding problems, supervise on-site work in time and deal with emergencies decisively.
4.3.2 The customer service center must stick to the post on duty 24 hours a day, accept the application of residents for repair in time, and inspect the damage on site.
4.3.3 The guard must increase the patrol frequency, and the guards should wear raincoats, rain boots and flashlights to patrol.
4.3.4 Other employees must stick to their residences, wait for orders or work, and shall not take leave to go out, waiting for orders and orders at any time.
4.3.5 The staff must keep the communication unblocked and pay attention to their own safety. If they perform emergency tasks alone, they must take appropriate safety measures and inform other employees.
4.3.6 If there are casualties during the typhoon and rainstorm, you should call the "120" emergency number immediately.
4.3.7 When the human resources of the management office are insufficient, it shall report to the office in time for support.
4.4 Management Office's later work after typhoon and rainstorm.
4.4. 1 Check and report the house leakage and the damage and loss caused by typhoon and rainstorm in time, and fill in the case (incident) registration form.
4.4.2 Contact the insurance company in time to handle the insurance compensation caused by typhoon and rainstorm.
4.4.3 Organize cleaning personnel to quickly clean the passage blocked by garbage, and keep the environment clean and hygienic.
4.4.4 Organize greening companies to prune, replant and reinforce greening plants.
4.4.5 Organize maintenance personnel to check the recycling equipment and maintain public facilities.
4.4.6 Organize and track the leakage maintenance of houses, and carry out home visits and maintenance return visits.
5.0 accessories
5. 1 typhoon warning signal
5.2 rainstorm warning signal
;
- Related articles
- How is the effect of Tianxi Pill?
- How many kilometers from Ankang to Jianmenguan road trip?
- Summer fresh sentences
- Which province and city does Ping Zi Village belong to?
- How to prevent ear frostbite in winter?
- Weather forecast host Hui Feng
- How to arrange a photo trip to Suzhou?
- Weather in Sanya, Hainan 2012 65438+124 October
- What are the methods of skin care in summer?
- Sanda or fighting is suitable for girls without foundation?