Traditional Culture Encyclopedia - Weather forecast - 202 1 Model essay on self-evaluation of project management

202 1 Model essay on self-evaluation of project management

After working in the enterprise for so long, what do you know about your work? I must have some feelings for myself. Let's make a self-evaluation of your work. The following are five articles on self-evaluation of project management that I compiled for you, hoping to help you. Welcome to read the reference study!

Self-evaluation of project management 1

I have been working as a builder in the project department since I took part in the construction work. I have been able to complete the construction work independently and methodically for many years, so I get along well with the upper and lower management personnel of the project department and win trust. Recalling the busy work and harvest of the builders in recent years, I will make a brief evaluation of this year's work:

I. Project Quality Management

As a construction worker, not only need to use a lot of professional knowledge, but also need the necessary field experience and necessary business skills to lead and coordinate the team. I have benefited a lot from so many years of site quality management. Do a good job in pre-control to prevent and eliminate hidden dangers in construction. Before the project starts, be fully familiar with the construction drawings, participate in the activities of the blue prints.the design of the design institute, participate in the preparation of special construction plans and quality and technical disclosure cards in combination with the requirements of engineering practice and national quality acceptance specifications, and guide the shift workers seriously and responsibly.

Do a good job of supervision, find and correct the problems existing in the construction, conduct a comprehensive inspection of the project quality, and timely propose and correct the problems in the construction. Follow-up and check the construction process of special procedures to ensure that each procedure is qualified, cooperate with the civil technicians of the project department to patrol and solve various situations in the process of concrete pouring, and make timely rectification to ensure that the construction quality of each link reaches the standard. After my conscientious inspection and strict quality control, every construction link was praised by the company's leaders, and I also led the management staff of the brother project department to learn.

I identify and analyze the construction problems afterwards, so as to facilitate the continuous improvement of the work. Every day after the construction, find out the problems that are easy to appear in the future and the merits in the construction process, and write them into the construction diary; Participate in the weekly supervision meeting, project department meeting and monthly owner coordination meeting to determine how to carry out the work, ensure substantive results, and continuously improve personal business level; Submit weekly and monthly reports to the company on time, seriously reflect the quality problems existing in the site and the problems that need to be solved by the company, and organically link the company with the project department.

Second, the preparation of the project completion figure

Be familiar with the actual construction data on site, and help the industry group to organize the change data into as-built drawings. As-built drawings can specifically reflect the traceability of actual construction data and provide a basis for future settlement and completion supply data. With the passage of time and the continuous improvement of technology, I feel that the lack of knowledge will affect the future work effect. In my spare time, I read a lot of professional books to discuss and learn new technologies and inventions. At the same time, I drive other managers of this project department to learn professional knowledge together, starting from the basic knowledge, and let technicians learn new specifications, new standards and new technologies with me, so as to continuously improve their professional quality and let the construction force and technical force of this project department develop and grow together.

Third, deficiencies and improvements

In the future construction management. I also deeply understand the existence of successes and shortcomings. Therefore, in the future project management, I will continue to study seriously, learn modestly, improve my business and diplomatic skills, master deeper knowledge and technology, humanize the management of the project department, attach importance to the training of employees' skills, and have a good corporate atmosphere. I believe I will grow into a truly excellent builder in the development of this big family of project department!

Self-evaluation of project management II

The year of 20__ was a year when our company developed _ _ projects, and it was also a year when the company rose successfully, and it was also a glorious year for our engineering department. As a builder, under the leadership of the engineering department, I finished this year's work. The following is the work assessment this year.

A, engineering and technical management

Examining the construction drawing carefully is the first and key step of construction technology management. When carefully examining the architectural structure drawings, we found many omissions, mistakes and contradictions in the design. After finding technical problems, contact the leaders and designers of the engineering department in time, and put forward good suggestions and treatment schemes according to the requirements of the site and specifications, which finally solved the problems and ensured the accuracy and integrity of the construction drawings. Do a good job in technical disclosure, which is the central link of construction technology management. After consulting the construction organization design and special scheme design, the construction shall be carried out according to the characteristics of each working procedure and part. Conduct special oral and written disclosure, and make construction log records. Technical problems should be pre-controlled and disclosed first, which laid the foundation for the construction quality, safety and progress of the project.

Second, the project site management

According to the construction specifications and design requirements, check the elevation, axis, steel bar layout, template installation and removal, concrete maintenance and scaffolding scheme of each construction site. If quality and safety hazards are found during on-site inspection, timely understand the construction process, analyze the root causes of the hazards, and coordinate the construction personnel to deal with the problems. After the treatment is completed, the inspection and acceptance are carried out, and finally the hidden dangers of quality and safety are eliminated.

This is one of the key points controlled by our engineering department. Review the rationality and accuracy of the project schedule of the project department. And hold a special progress meeting, coordinate all aspects of the relationship, as far as possible to provide high-quality conditions for the project progress, and strengthen the supervision of the site progress. Under the command of the leader of our engineering department, the overall progress of the project has reached the expected control goal. In this construction site management, I always stood in the position of Party A, strictly demanding myself, supervising the work of supervisors, and trying to control the quality, safety and progress of the project. Deal with the problems found in time, and report the major problems to the leaders of the engineering department in time, so as to better deal with the problems in time and make the project go smoothly.

Third, the project cost control

I have repeatedly verified all the changes involving the increase of engineering quantity to determine the accuracy, necessity and practicability of the changes. All changes should be reported to the leaders, and data should be collected and settled. On the basis of the original design, under the premise of not affecting the engineering function and overall effect, the building materials are reasonably changed or reduced. Carefully check the contract, determine the position and information of the recipient, and confirm with the recipient in conjunction with the contract department and supervision project department of the company. Do a good job of collecting and sorting the data of the receiver, and report the results of the receiver to the leaders of the engineering department in time. So as to realize the authenticity and accuracy of the receiver.

Self-assessment of project management 3

After several months of personal construction practice, I have cultivated my independent working ability of analyzing and learning to solve problems, laying a foundation for further work in the future. Through work and labor, I learned the basic construction process of housing construction. Next, I will make a simple summary of the understanding of reinforcement, formwork and concrete:

1, steel engineering:

Strengthening is the first choice for the future development of modern architecture and architecture.

As one of the most important materials, reinforcement engineering, like the whole human skeleton, is one of the three major projects of concrete engineering.

The classification of steel bars can generally be classified according to different production processes, such as large diameter and small strength of steel bars. The production process can generally be divided into hot rolled steel bars, cold rolled steel bars, cold drawn steel bars and cold drawn steel bars.

The same diameter can be divided into: 8mm, 10mm, 12mm, 14mm, 16mm, 18mm, 20mm, 22mm, 25mm, 30mm, etc. In terms of strength, steel bars can be divided into HPB235 and HPB35.

2, template engineering:

The formwork project of concrete structure engineering is a strict concrete forming construction project. Template assembly must be reasonably equipped, and the square reinforcement of the dismantled template at the bottom must be arranged in a dispersed manner, so as to save time and materials for the next layer of construction. It is strictly forbidden to form joints, otherwise there will be slurry leakage, resulting in quality problems such as concrete honeycomb pits and rotten roots. The verticality and flatness of each wall column must be strictly controlled in formwork construction, otherwise there will be quality problems such as wall displacement and wall inequality, which will cause problems in the future.

2, concrete engineering:

Concrete engineering can be said to be an important part of the project, because the project

Quantity and quality are directly related to the construction technology of concrete engineering. The quality of steel bar binding is a concealed project, and concrete is the first impression, so the construction technology of concrete must be strictly controlled.

In the construction process of concrete preparation, transportation, pouring and maintenance, they are interrelated and interrelated. Problems in any link will affect the whole construction quality.

The preparation of concrete also includes the design of concrete and the construction mixture ratio of concrete, and the construction mixture ratio shall be subject to the laboratory. Concrete company test).

Close, must maintain 95% strength assurance rate, concrete mixing must be symmetrical material mixing evenly, at present, most of the concrete is commercial concrete or road mixing, which basically meets the requirements of mixing.

Concrete pouring is the most important thing in concrete engineering. Only qualified pouring can ensure the strength of concrete, the integrity and durability of the mechanism, the accuracy of dimensions according to the requirements of close fit design, and the smoothness of the surface of concrete after formwork removal.

After concrete pouring, the overall quality must be strictly controlled, so before pouring, the concealed works must be inspected and accepted, including the size and axis of the template and the bearing capacity and stability of its framework. The quality of pouring is also closely related to the technical level of pouring workers. If the vibration is not dense, the honeycomb pits will be easily separated, and the reinforcement will be leaked in severe cases. In the process of concrete construction, we must also refer to the outdoor temperature at that time, especially the raft foundation concrete is thick. Temperature measuring tubes must be set to observe the temperature of concrete. The materials of temperature measuring tubes must meet the requirements, and their positions must be representative, which can detect the temperature of concrete at different depths.

Before concrete pouring, the sundries must be cleaned up, and it is forbidden to have sundries such as beverage bottles, abandoned templates, square wood, fasteners, cigarette butts and cigarette cases, otherwise the formwork will be easy to be hollowed out after dismantling, which will pose a serious threat to the engineering quality.

1 Through observation and identification, it is found that the concrete cast-in-place slab is prone to cracks. Through direct analysis, there are the following reasons:

For commercial concrete, the slump is larger than that of pumping pipe pouring, and there are many fine particles in concrete. A large water-cement ratio is easy to cause shrinkage cracks.

2. Insufficient formwork support or premature formwork removal causes concrete to fall off, resulting in displacement of structural reinforcement and negative reinforcement.

3. The irregular use of reinforced cushion blocks leads to the insufficient thickness of cast-in-place reinforced concrete protective layer, which leads to its cracking.

4 after concrete pouring, the surface is not covered, and the maintenance is not in place, resulting in excessive water loss.

5 After concrete pouring, it must bear the load to arrive, and workers pile up steel pipes, squares, templates and other materials on the cast-in-place slab in advance, which leads to the situation that the construction load is greater than the use load.

In order to prevent the above problems, the following measures should be taken reasonably:

1 Focus on controlling the proportion of concrete.

2 strictly control the template position, it is forbidden to appear skewed.

3 concrete pouring vibration must be fine, put an end to vibration leakage phenomenon.

4. Increase concrete curing and add water on time as needed.

5. It is forbidden to feed people before the concrete surface reaches this necessary load.

6. The formwork removal shall be postponed until it reaches the necessary strength. In accordance with the provisions, when the concrete strength reaches more than 75% of the design, the formwork can be removed.

Experience in the practice of "three modernizations";

In the hot summer and scorching sun, I started my first job search on an old bicycle. I stepped into countless thresholds and was politely rejected countless times. When the wheel of physics stepped into the gate of the space-based downtown garden, my job-hunting life had a home, so a young man had a self-proclaimed learning garden.

With the construction of Building 5 in the Central Garden of Aerospace City, my five-month internship has turned a new page. Under the careful guidance of Yang Gong and Gong Yi, my practical skills have been further improved. When I came to this construction site, I was making a raft waterproof. In recent months, I have studied the construction technology of raft foundation post-pouring belt, including leveling, setting out, steel bar inspection, formwork inspection and post-pouring.

In this construction site, I not only learned more professional knowledge, but also learned how to have a good relationship with leaders and how to manage workers effectively and reasonably, which played an important role in the development of my life. I was moved by my colleagues there. They were very kind to me. When we had dinner after work, the aunt who cooked put the rice on the table for me to eat. In that hot weather, Zhao Gong of the supervision office often comes down from upstairs.

When I was sick, Liu Jie, the accountant, always put the medicine on my desk and kept it from me. There are so many things that touched me in this construction site that it is hard to describe it with my tortuous personality. In a word, I am full of infinite gratitude to them from the bottom of my heart. In just a few months, I can't describe in thousands of words the gratitude of many colleagues, such as Yang Gong and Gong Yi.

I learned a lot of professional knowledge from my work in Yang Gong, which made me have a deeper understanding of my future formal work. After several months of study, I remembered a sentence: "There are no mistakes in the project, only errors are allowed, but the errors must be within the norms", which made me understand that I must work hard in the project. This is also a small mistake and negligence, which is likely to bring immeasurable losses to Iraqi workers. Experience of "Four Practices"

After several months of internship, I understand that interpersonal relationship is extremely important in construction work. Only with good interpersonal relationship and strong working ability can we handle all kinds of problems in the construction process and unite workers. I used to think that trying to do a good job in interpersonal relationships was nothing more than flattery, treating guests and giving gifts. Now I understand the addition of that knowledge. The most important thing is that I must have an open personality, and I can really appreciate and respect others from the bottom of my heart. If you can objectively explore the advantages of others and sincerely respect and appreciate others, your interpersonal relationship will be like a duck to water. After months of communication with colleagues, I feel that a person who knows how to appreciate, respect and handle interpersonal relationships will be very happy, and others will appreciate and respect you happily.

Talking about the choice of construction team from interpersonal relationship and thinking from the perspective of a project manager, I feel that this problem is very critical. The technical level of the construction team will directly affect the quality of the construction project and the economic benefits of the project manager. I feel that a good construction team can coordinate each other's work, but a bad construction team can make a mess of a perfect project. According to my observation and thinking, and compared with other buildings, I have a preliminary understanding and understanding of the internship site. I feel that my internship site is very team spirit, the level of construction teams is very good, and the construction teams cooperate well. Under the management of Wang Gong, the construction team will complete the project more orderly.

The fifth theory is the key task of college life, and I feel that practice is also the second classroom of college life. The combination of theory and practice will make knowledge constantly updated and developed. Practice is the only criterion to test the truth, and it is also the aesthetic way for our college students to exercise and grow up. I feel that one's knowledge and skills can only play a role in practice, and the knowledge in textbooks can be enriched, improved and developed.

The practice of college students will lay a solid foundation for the next formal step into society. I think a qualified college student must learn to combine theory with practice, constantly learn, improve and innovate in practice, improve his self-knowledge and skills in practice, and lay a good foundation for the success of his career.

Finally, I would like to thank Zhumadian Tianji Real Estate Development Co., Ltd. for providing me with learning opportunities and teaching and living conditions for this trip to Vietnam. After this internship, I will benefit for life. I will continue to study hard, strive to become a qualified builder in the new era and realize my life plan as soon as possible.

Self-evaluation of project management

Looking back on the past year, I spent an unforgettable year in a tense, busy and hard working environment. It has ushered in a brilliant 20__ years, looking forward to the future and striving for the goal. In the new year, I will, as always, fully obey the company's leadership, strictly abide by the company's various management systems, and under the overall arrangement of the project department, seriously strengthen business skills learning, improve the management technology level, strive for progress, and cooperate with colleagues to do their jobs well.

People have dreams all their lives. If they have dreams, they have goals. If they have goals, they will struggle and realize their dreams. In the process of realizing their dreams, they will encounter different degrees of life training. With the tide of economic reform and opening up, the modern construction industry has gradually stepped into a higher and stricter scientific management level, which will make our generation of managers engaged in the construction industry face a starting point of life challenges, and they have to update their concepts and study hard.

First, strengthen study and update ideas.

I am a stubborn, competitive, unyielding and brave person. So in practical work, I often like to say one thing and stick to my will, which will inevitably make it difficult for some colleagues to understand my point of view in practical work. First of all, I want to make it clear that, despite this, I absolutely insist on my own views based on my work knowledge and opinions, rather than targeting one thing with personal selfish thoughts. Of course, nobody is perfect. In the future practical work, I will try to overcome the shortcomings in my work to adapt to the working environment of the whole team.

In order to meet the needs of the construction industry under the new situation, I must further strengthen the study of business technology and comprehensively improve my management skills. In practical work, we should be strict with ourselves, adhere to principles, seek truth from facts, do things honestly and practically, measure ourselves with a citizen's moral code, gradually update our concepts, and be a qualified construction industry manager.

Second, stick to your post and perform your duties.

As a construction professional and technical personnel, how to perform their duties in their posts is a standard to measure whether a professional and technical manager's professional level, ideological and moral quality and work style are simple and rude. To be a qualified professional management and technical personnel in the construction industry, we must first be enterprising, loyal to our duties, not afraid of hardship, work hard and be brave in struggle. And in practical work, give full play to their professional expertise, fulfill their duties, do a good job, deal with specific problems in the work with a pragmatic attitude and a solid work style, do not avoid things, do not kick the ball, ask for instructions from department leaders, report more, and do their duty, do their duty, do their best, and do their best for related businesses within the scope of work.

Third, strengthen business study and comprehensively improve management skills.

With the overall improvement of the technical specification requirements of modern construction industry, as technical managers in the construction industry, they must adapt to the new specification requirements of the construction industry, constantly update their business knowledge, improve their business management level and master their business skills in order to play a better role in practical work.

Only in the actual process, we should constantly identify and improve, learn with an open mind, strive for progress, be strict with ourselves, forge ahead, strive to do our job well, unite our colleagues, forge ahead in Qixin, and do our duty for the company to fully complete the set goals and tasks, build high-quality real estate and build brand image.

Here, I wish the company a prosperous career and all the best in the new year! I also wish all employees of the company a happy family and all the best in the new year!

Self-evaluation of project management

I graduated from _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Seriously study relevant experimental knowledge and constantly enrich and improve yourself. I will briefly describe my work this year as follows:

I. Politics and ideology

Wearing a strong sense of ownership, I have been paying attention to the development of electric power construction _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

I start from doing my job and daily work well, from me, from this moment, from the little things around me, and persevere. I will do my best and make unremitting efforts in my work. I will constantly improve my job skills, strive to master my job knowledge, be the backbone and expert of my job, and do my job in a down-to-earth manner.

Second, the work attitude

No matter at work or in life, I always believe that no pains are rewarded, so I have been working hard, studying hard and working hard. Love your job, be able to treat every job correctly and seriously, be dedicated to your job, get to and from work on time, make effective use of working hours and stick to your post. The construction period is tight, there are few people and many tasks. Can track the work, ensure that the inspection task is completed on time, and ensure the smooth inspection of the project. This shows that our testers have a strong sense of responsibility and carry forward the spirit of continuous work and hard work.

Third, job responsibilities

Conscientiously implement the national guidelines and policies on standardization, quality management system, product quality supervision and inspection and research and development; Really implement the relevant standards, testing methods and regulations of engineering products that this position is responsible for supervising and testing, and ensure that every test has laws to follow. Do a good job of understanding the entrustment list, project inspection, data and feedback, and do a good job of tracking the account for future reference. Due to many test items and different test time, the work should be done well in advance to avoid delaying the construction period and affecting the progress because the technical personnel of the construction unit do not understand the engineering test requirements and technical indicators. Our laboratory staff adhere to the four cardinal principles, carry out the quality policy, implement the quality objectives, abide by the rules and regulations, and serve the construction site wholeheartedly.

Fourth, specific work.

My job is mainly to test and inspect some civil engineering materials (cement, sand, stone, steel, brick, etc.). ) and finished products (steel weldments, concrete blocks, etc. ); Participate in concrete matching test; Supervise and control the mixing of concrete in the mixing station; Control site concrete and backfill soil, etc.

When I first joined the work, the first thing I came into contact with was the backfill inspection. Backfill soil is simple and boring, but most people think it's nothing but adding some soil. But after working for a period of time, it is not so simple: starting from the material requirements of the soil, compact the soil and set its control index; Which parts need to be backfilled and which parts need to be backfilled with sand or 3: 7 lime soil should be controlled by technical indicators; Selection of backfilling machines and tools; Are the conditions available before backfilling? Whether the strength of underground concrete foundation meets the specified requirements, whether the material selection, compactness requirements, virtual paving thickness and compaction coefficient of soil have been determined, whether the backfill compaction can not meet the requirements, whether it will cause landslides, subsidence or even bring greater harm. Therefore, it is not so easy to do anything in your mind until other materials that you gradually come into contact with are tested, and there is no room for ambiguity.

Contact more project tests in the laboratory one after another, define working procedures, form clear working ideas in specific work, and be able to carry out the work smoothly and complete the work skillfully and successfully.

1. control of raw materials: each batch of raw materials entering the site must have the manufacturer's quality guarantee and inspection certificate, and each batch of raw materials must be inspected according to the specified quantity. (1) For cement, it is forbidden to mix cement of different manufacturers, varieties and labels when using bulk cement warehouse. When using bagged cement, protective measures should be taken to prevent cement from caking due to moisture. When using cement stored for more than three months, contact the laboratory in advance to conduct a second review of the actual label of cement. (2) Sand and gravel shall not contain foreign bodies, coal dust, etc. Especially those that are not mixed with white ash. If the raw materials are found to be inconsistent or abnormal with the samples, they should contact the laboratory in time and handle them. In order not to affect the construction progress, all incoming raw materials must be entrusted in time. The cement test adopts 3d strength and 28d strength, and the test report of steel, sand and stone should be issued within 24 hours after the laboratory understands the entrustment. All materials to be tested must be certified by the laboratory before they can be used. The principle of inspection before use, otherwise it will be regarded as unqualified products and prohibited from being used in engineering.

2. Backfill control: Before backfill construction, the construction department shall truthfully fill in the backfill entrustment form and carry out the construction according to the requirements of design drawings. There is no requirement, according to national standards. The water content of soil material selected for backfill construction is the best. The paving thickness of each layer of backfill soil shall be compacted by layers according to the specifications, and shall not be rammed by leakage, and shall be accepted step by step. Only after passing the inspection can the next backfill be carried out, otherwise the construction unit will rework it.

3. Concrete engineering. For concrete and mass concrete with special requirements, it should be entrusted in advance, and can be opened for identification after can opening. (2) Every time concrete is mixed in the mixing station, the mixture ratio should be strictly implemented, slump and workability should be controlled, and the mixing and production control records should be made. If the water content changes greatly, the laboratory should be informed in time to make dynamic adjustment. When using fly ash, environmental pollution should be avoided or reduced. The concrete test block is left in the mixing station, and the laboratory will assess the concrete production of the mixing station according to the concrete grade, batch and time produced by the mixing station to control the concrete production level.

4. Welders who enter the construction site for civil work must submit a copy of the welder's technical grade certificate and a list to the laboratory before the project starts. Before the start of the project, the welder should be tested for welding. After the test report is issued, the welder can carry out formal operation.

As soon as I joined the work, I quickly integrated myself into the work, constantly demanding myself and constantly urging myself to improve. As a young worker, I dare not neglect my work. I ask myself to write down the gains and losses in my work and the problems that appear every time to learn from them. If you encounter problems or difficulties in your work, you will consult with the general manager and leaders, listen to his opinions and suggestions patiently, and improve your work. Because my department only works in a small circle most of the time, I can't just sit back and wait. Frequent and irregular contact with the construction site to understand the engineering procedures and steps, so as to better serve the work in the future.

Verb (abbreviation for verb) Work achievement

I learned a lot at work and exercised myself. Through unremitting efforts, the work level has been further improved, and in the first 120-day battle of the _ _ _ _ project, it was awarded the second class by the _ _ _ project department. In addition, with the mutual cooperation and collaborative efforts of other colleagues in the laboratory, the civil engineering laboratory of my _ _ _ _ project is ".

Looking back on the past year, I was busy and full. What I learned in school textbooks is all theoretical knowledge, and the practical experience accumulated bit by bit in my work at the moment is inexhaustible wealth in my life. This year, there were difficulties and gains. Because of my hard work, I have fulfilled my personal responsibilities, strengthened my skills and made greater contributions to the company.

202 1 model essay on project management self-evaluation;

★202 1 year model essay on engineer's work self-evaluation.

★ 202 1 year work self-evaluation 5 essays

★ 202 1 5 latest article on engineer's job self-evaluation.

★ 202 1 5 latest model essay on job self-evaluation.

★ 202 1 Five latest model essays on personal self-identity.

★ 202 1 year: five examples of work self-evaluation.

★20265438 The latest five personal self-evaluation essays +0.

★ 202 1 Five self-evaluation templates for personal annual work

★202 1 year construction self-evaluation is about 700 words.

★202 1 five latest work self-evaluation articles