The supervision diary is very important supervision data, and the project supervision team must record it carefully, in detail, truly and in time. Before recording, the construction situation and supervision work of the day should be summarized and sorted out, so that the handwriting is clear, the typesetting is neat and coherent. The following is a sample of the construction supervision log I collected, hoping to help everyone!

Construction supervision log

Completed by: xxx

Date: 20xx year

weather

Daytime temperature:

Maximum temperature: 20

Weather: sunny to cloudy

Night temperature:

Minimum temperature: 15

Weather: cloudy

Construction site, construction content and image

Unit project:

Division project:

Construction image: the construction progress is in line with the plan.

Construction quality inspection and safe operation

1. Inspection contents: unit 1-2-3, inspection quantity, specifications, dimensions, etc.

Inspection result: It meets the requirements of design drawings and construction specifications.

2. Unit 1-6- 1: Check compliance.

3. Unit 1-2-3. The test was conducted on 15: 15 in the afternoon. Participants:,,,.

Test results: 6 points for testing, 6 points for passing, 8 points for testing, 8 points for passing, and the pass rate is 100%.

4. Unit 1-9-2. Two groups of C25 concrete test blocks were sampled, and the sampler has been sent to the supervision department for maintenance.

Second, the safe operation:

Third, the problems existing in the construction work and their treatment.

During inspection, the supervision engineer found that the local honeycomb and pits on the right bank retaining wall of 1-2- 1 unit had been repaired with mortar, and the site supervision was not informed. Treatment method: verbally notify the on-site technical director of the construction unit, immediately stop similar illegal construction, and submit the rectification plan to the supervision department before tomorrow 18: 00.

The management personnel and main technical personnel of the contractor are in place.

Project manager; Technical director; First inspector; Re-examination; Security officer; Construction workers, at work.

The construction machinery is put into operation and the equipment is in good condition.

Two drum mixers, two 800 dosing machines and four electric welding machines have been put into operation and run well.

other

1. Supervisor's instruction: Unit 1-2-3. After testing, the formwork and reinforcement meet the requirements of design and construction specifications, and the next working procedure can be constructed. The supervision department will issue a written opinion before opening the warehouse tomorrow morning.

2. In the morning 10: 05, the director asked my supervision department to do a good job in the safety pre-control of the construction site and send it to the construction unit in the form of supervision notice.

3, issued a rectification notice, the main management personnel of the project department in place.

Materials: Advance and retreat of main materials on that day.

Machinery: refers to the quantity and operation of main machinery and equipment on the construction site, and the entry and exit of main machinery and equipment.

II. Supervisory activities

1, patrol: patrol time or frequency, and optionally record important information during patrol according to actual conditions;

2. Acceptance: the place, content, result and receiver of acceptance;

3. Witness: the content, time and witness of witness;

4. Standby station: content, location, number of people on standby and standby record;

5. Parallel inspection: location, content, inspector and parallel inspection record number;

6. Engineering measurement: complete the measurement of engineering quantity and change the measurement of contact content;

7. Examination and approval: examination and approval of relevant schemes, inspection lots, raw materials and progress plans.

Iii. Existing Problems and Solutions

Over the past day, through a series of supervision work, what problems have been found in the quality, progress and investment of the project, how the supervision team handled these problems, and what the results were, should be recorded in detail. Some major quality and safety accidents should be handled according to the prescribed procedures, and relevant information should be recorded, saved and sorted out according to regulations, and the records in the diary should be concise and to the point.

Fourth, its? it

1, regulatory directive;

2. Meetings and meeting minutes;

3. communication;

4. Safe working conditions;

5. Rationalization suggestions;

6. Inspection by the construction leading department or the construction administrative department;

Five, the duty record

Signature of the supervisor on duty that day.

60 supervision construction log model essay

Log, basically means work log. Logs are mainly published on the Internet, recording a process and an experience in detail. The following is the model essay of supervision safety construction log compiled by me. Welcome to share.

I. Construction situation

1. South sewer backfill.

2. Pay-off and dot at the position of Y 168—Y 170 rain well on the south side.

3.Y 102—Y 103 The rainwater well began to be filled with water, and the water was closed for the first time.

4, Y78-Y82 inspection well binding steel bar and template. Workers: 4 people.

5. y146-y151pipeline installation. Machinery: 1 excavator, 2 loaders. Workers: 6 people.

6. Trench excavation of 6.W22-W26. Machinery: 1 hook machine, 2 excavators and 3 trucks.

7. Trench excavation of W16-W22. Machinery: 1 excavator.

Second, measure the positioning situation.

Control the water injection height of Y 102—Y 103 rainwater well.

Thirdly, the security situation.

On-site education shall be given to the on-site mechanical operators, and attention shall be paid to safe operation during construction to avoid personal injury and self-injury.

Fourth, the quality situation.

In the process of backfilling the south sewage pipeline, the backfill elevation generally exceeds the design requirements, and the labor party is required to rectify immediately. And strictly control in the follow-up work.

Verb (short for verb) others

1. A fine of 22,000 yuan was imposed on the subcontracting of pipeline services.

Reason for punishment: breaking through the network node plan and failing to equip professional construction management personnel, full-time security officers, librarians and quality engineers as required by the company. Fine 10000 yuan.

K 1+650-K2+530 delayed the short-term progress plan from April 26th to May 3rd by one day and fined 2000 yuan.

The short-term progress of K2+530-K3+200 was delayed for five days today, and it was fined 10000 yuan.

Further reading

First, the understanding of the security log

Construction safety diary is a continuous and detailed record of important production and technical activities in the whole construction process from the beginning to the completion of the project. It is a true portrayal of the daily safety construction of the project, and it is also the basis for analyzing the causes of construction safety accidents. Construction safety diary occupies a very important position in the whole project file.

The original meaning of "zhi" refers to the recorded words. The construction safety log is a document recorded in written form every day from commencement to completion, which records the valuable events related to construction safety that occur every day during the construction process. Only when we have an accurate understanding of the construction safety log can we accurately grasp the idea of compiling the construction safety log.

The position of construction safety log in understanding should be:

The construction safety log is a kind of record.

It mainly records the illegal operation, illegal command, safety problems and hidden dangers in the construction site, and records the handling of problems found.

Construction safety log is a kind of evidence.

It is the proof of whether the equipment and facilities have been accepted at the site and whether the security personnel have checked the potential safety hazards at the site.

The construction safety log is the notebook of the project and the most detailed first-hand information reflecting the construction safety production process. It can accurately, truly and subtly reflect the construction safety situation.

Construction safety log can play the role of file interface, and can be used to trace something that is not in other files.

As the construction data kept by the construction enterprise, the construction safety log records the information that cannot be revealed in other engineering documents for various reasons, which may be the basis for judging the truth in the future.

Second, the log record content

The content of construction safety diary can be divided into three aspects: basic content, construction content and main points for attention.

The basic contents include date, week and weather.

The construction content includes the name of the construction project, interval position, operation team, number of workers and progress.

The main points for attention include:

(1) Check the situation;

(2) Records of facilities and supplies;

③ Acceptance of facilities;

(4) Equipment and facilities, construction electricity and "three treasures and four ports" protection;

(5) Illegal operation, accident causes, handling opinions and handling methods;

⑥ Other special circumstances.

Three, the main problems in the process of filling in.

Failing to fill in the information on time, making information for inspection: what happened that day was not recorded in the diary of that day, and was later supplemented. Recorders generally do not fill in safety logs in time. In order to meet the inspection of the company or other superior departments, they shut themselves in their offices and write "memoirs". In the past, it was not difficult for us to find the construction safety logs of some projects. Today is June, but often the construction safety log is still being filled in in mid-May, even in March and April.

Simple record: the weather conditions, the names of sub-projects and simple construction conditions of the day were not clearly written, and the operation team, the number of workers and the progress were not recorded in detail. Imagine how to do a good job in safety production management at the scene without even knowing the team and number of workers.

Incomplete and untrue content: according to other construction safety data, some facilities and materials entered the site on a certain day of a certain month, but no record was found in the log; Fabricating non-existent construction contents, because the construction log was not filled in in time, most of the contents were vacant, and the recorder recorded the contents inconsistent with the construction site out of thin air.

Alteration of contents: In general, the construction safety log is not allowed to be altered.

The main work contents should also be recorded as follows: ① power failure, water cut-off and shutdown; (2) Construction machinery failure and treatment, etc.

The construction safety log records of some projects should be filled in with blue ballpoint pen or even pencil. As one of the important materials of the construction project, the log should be filled in black ink with black pen and gel pen.

The column of "Site Hidden Dangers and Rectification Measures" records the hidden dangers of safety accidents, which should be rectified and eliminated in time and closed for filling.

Four, the construction safety diary to fill in the requirements and pay attention to the details.

What problems should be paid attention to in recording the construction safety log to meet the requirements? Mainly in the following aspects:

We should grasp the key meaning of the matter. For example: what happened; The seriousness of the matter; When did it happen? Who did it; Who led who did it; Who said that; What to say; Who decided; Decide what; Where it happened and what needs to be done; How much is needed; Time required for completion; Who is required to complete how to do it; How much has been done; Be qualified and unqualified. Only by describing these key meanings can we describe them clearly and have traceability.

The narrative should be detailed, concise and appropriate. Things to remember must not be omitted, and the main points of things must be made clear, and they cannot be written as "memorabilia".

What happened that day should be recorded in the diary of that day, and it is not allowed to supplement it later.

The recording time should be continuous, from commencement to completion acceptance, and the daily recording should not be interrupted. If there is any interruption in the process of engineering construction, it should be explained in the log, which can be described on the last day of shutdown or the first day of resumption of work.

When water and electricity are cut off, it is necessary to clearly record the starting and ending time, what work is being done when water and electricity are cut off, and whether it has caused economic losses. , what is the reason, so as to leave evidence for future construction disputes and change claims.

The record of the construction safety log should not be a running account, and the time, weather conditions, itemized records and other inspection records must be specific and detailed.

Verb (abbreviation of verb) abstract

Safety log is a record of safety management conducted by a safety officer in one day, a reference material for analyzing and studying construction safety management, one of the most reliable and authoritative original records that can be traced and checked after an accident in production safety, and one of the important documentary evidences for identifying responsibility. It is hoped that the safety log recorder of each project will pay attention to the filling of the construction safety log and make their own contribution to the safety production management of the enterprise.

30 diaries of project supervision

First of all, you can fill in some contents:

1, monitor the contents of the log.

2. The content must be recorded every day; Date, weather, construction site and operation content, number of construction personnel, main equipment and materials used, etc. , marking the completion of major subdivisional work.

3. Daily records of major events;

4, patrol inspection and supervision in the process of construction, witness sampling.

5, materials, equipment, components and main construction machinery and equipment approach and acceptance records.

6, construction survey, engineering inspection and acceptance results.

7, the construction unit data to submit for approval and review results.

8, construction drawing handover, engineering change related matters.

9, the main content of the supervision notice and the issuer.

10, related matters and handling opinions put forward by the construction unit.

1 1. Relevant matters and handling opinions put forward by the construction unit.

12, related matters agreed at the site meeting and related matters determined by coordination.

13, engineering quality accident and treatment scheme.

14, abnormal events and their influence on construction

15, matters related to designer's going to the construction site, handling and support.

16, the quality supervisor and relevant leaders came to the site for inspection, guidance and relevant instructions.

17, other important records.

Second, you can also search the engineering supervision practice log in Baidu Library to find the model essay for reference:

; lm=0od=0fr=top_home

Model essay on supervision diary

A busy and full day is over. All kinds of logs are familiar to everyone. A journal is a record that introduces a process and experience in detail. What kind of log should you have seen? The following is a sample of supervision work log I compiled for you, hoping to help you.

Supervision Work Log 1

The supervision work we are engaged in follows the principle of "abiding by the law, honesty, justice and science" and gradually moves towards standardization. We should also strive to grow into a member of an organic group that dares to struggle and unite as one.

We should be soberly aware of the harm of favoritism and abuse of power in our work to society, and hope that everyone will lead an honest and clean life.

In work and life, we should not only learn professional skills, but also learn the truth of being a man, and learn their attitude towards work and the truth of being a man from old engineers.

Is to pay attention to the unity of collective learning and autonomous learning. The professional quality of supervisors in our unit is uneven, and the level is far from meeting the market demand. Supervision mostly comes from pure technology or construction enterprises, with relatively simple knowledge structure, insufficient organization and coordination ability and lack of backbone talents in their prime of life. Therefore, we must pay attention to learning and go to the construction site without speaking layman's words, which can effectively solve the problems in the project and make suggestions for the construction unit. The supervisor who comes early should keep forging ahead and set an example first. Newcomers should study hard, pay attention to practice, do it little by little, pay attention to the accumulation of experience and catch up as soon as possible.

It is to pay attention to working methods and do a good job in relationship coordination. At present, the situation of supervision requires our supervisors to have a high professional level and rely on the project wholeheartedly. The second is to coordinate the relationship. Supervision is a kind of service behavior, and we are recognized and paid by the construction unit through our own professional labor. When we go to the construction site, we must straighten our position. We can't pretend to be experts and tell the construction unit what to do according to norms, regulations, laws and regulations, but we should be good at explaining the situation and let the construction unit understand the benefits of doing so. Don't pretend to be a manager for the construction unit, make it clear that the' problem' has been found out, and strengthen inspection and acceptance after making it clear. If it can't be solved, let the owner and the project director coordinate. Otherwise, the relationship will be stiff and the work will not be done well. For the construction unit, if it only charges and does not provide services, then the result can only be "selling our future for short-term interests."

Strict quality control, acceptance of materials, acceptance of batches, disciplines, disciplines must be personally checked, the conclusion must be consistent with the real thing. If everyone's acceptance of the project is specious, the inspection is not in place, and you go through the motions, of course, by signing with photos, then sooner or later there will be quality problems, and you will be legally responsible for the problems.

Finally, with the care and help of the company's leaders, we will make serious efforts to contribute to the company's bright future.

I hope the company will prosper and create greater glories.

Supervision work log 2

On March 12, I was hired to work in Changzhou Cheng Zhen Construction Engineering Supervision Company, and was assigned to three nearby construction sites to supervise civil engineering. I have been working for three months. With the help of company leaders and comrades, I successfully completed the corresponding supervision tasks in the past three months, which was recognized and praised by the owners and contractors. During my supervision work, I worked hard and conscientiously, and did not dare to be tired. I work hard and have a good professional ethics and a strong sense of responsibility. Now I will make the following report on my work and supervision experience in the past three months.

Just arrived at the construction site, in a different place, but faced with objective unfavorable factors such as large supervision tasks, wide supervision area and few supervision personnel. So I did encounter some difficulties in the actual supervision work. I didn't flinch in the face of difficulties, and I made progress despite all the difficulties. In practical work, I actively communicate with the owners and contractors to coordinate various relationships, so as to carry out supervision work as soon as possible, and take the time to familiarize myself with the construction drawings and related design instructions. In the shortest possible time,

In the actual supervision work, I require the construction unit to carry out total quality management, establish and improve the quality assurance system, and ensure that there are commencement reports, construction measures, technical disclosure, positioning review, materials and equipment tests, concealed engineering records, quality inspections, special inspections and completion data.

In the aspect of engineering quality control, the combination of active control and passive control is adopted, and supervision work is actively carried out, focusing on prevention. Review the contractor's qualification, focusing on the enterprise registration certificate and technical level, and submit relevant documents for review, so as to understand the general situation of technical force and main construction and installation experience, and check the supply of sand, stone, cement, steel bars and other materials and the mixture ratio of concrete and mortar.

According to the characteristics of the project and the key parts that affect the quality of the project, review the construction organization design submitted by the contractor, put forward improvement suggestions in view of its shortcomings, and check the original vouchers, test reports and other quality certification documents of the purchased materials.

Control in advance to ensure that engineering quality accidents do not occur or occur less. Such as winter construction, low temperature, concrete pouring, masonry, wall plastering and other quality problems. It is not easy to guarantee. Therefore, the construction unit is required to provide a winter construction plan to prevent in advance and avoid freezing injury.

For important engineering parts and subdivisional works prone to quality problems, quality pre-inspection measures shall be formulated. For example, in the concrete pouring project of civil engineering, the leveling of beam is a key part of the project, which involves many processes such as wall masonry, formwork, steel bar binding, concrete pouring and so on. Once negligence may cause engineering quality accidents, once quality problems occur, the consequences will be serious. Therefore, in this part of the construction, strengthen monitoring, take on-site supervision measures, and strictly supervise the construction of various parts, which will affect the construction quality.

Strengthen process control. During the construction supervision of Wujin Jian 'an Construction Team, it was found that there were quality problems in the building material fly ash bricks used by the team. Although the contractor has a laboratory quality inspection report, in the attitude of being responsible to the owner, the batch of bricks are sampled by parallel inspection in time, and the construction unit is allowed to use it only after all the strength indexes are determined to meet the design requirements. There are also quality problems in concrete pouring, masonry and wall plastering. In order to ensure the construction quality, I issued a supervision notice in time, requiring the construction unit to repair the defective parts to meet the quality standards required by the design and specifications.

In the supervision work, the construction unit is required to carry out the construction according to the design content, design requirements and construction acceptance specifications to ensure the construction quality.

In the construction of each working procedure, the construction unit is required to strictly implement the national and local construction and installation quality inspection system, check and confirm the relevant construction quality statements submitted by the construction unit in time, and review and sign the completed project quantities declared by the contractor according to the design documents and the provisions on the calculation of quantities in the contract.

Supervision record is an indispensable part of engineering supervision. I have a complete and sufficient supervision diary, which records the relevant situation of the construction site every day in detail, providing a reliable basis for solving the dispute between the owner and the contractor fairly.

During the supervision of the three construction sites, I actively coordinated the relationship between various units, making them cooperate with each other, support each other, and do a good job of cohesion to ensure the construction quality and progress.

Through the above work, I have completed the workshop office building project of Tian Li Turbocharger Equipment Co., Ltd., the workshop office building project of Changzhou Yamazaki Motorcycle Equipment Co., Ltd., and the civil engineering supervision work of Zhongdi Electric Co., Ltd., and gained a lot, but there are still some shortcomings. For example, I am an environmental engineering major, and I don't know much about the professional knowledge of civil engineering, and some process requirements are not very familiar. However, the supervision industry requires supervision engineers to have rich knowledge in many disciplines and industries, so I need to continue to study hard in various disciplines and constantly improve my professional ability and level.

100 supervision log is omnipotent.

Supervision work system

Construction drawing review and design disclosure system

The chief supervision engineer shall organize the owner, design unit and construction unit to conduct trial disclosure. First, the design unit introduces the design intention, structural characteristics, construction and technological requirements, technical measures, matters needing attention and key issues, and then the construction unit puts forward the problems, doubts and technical problems that need to be solved in the drawings. After three studies and discussions, the solution office was drawn up, and the supplementary modifications of the design drawings were recorded.

Audit system of construction organization design

The chief supervision engineer shall organize the examination and submit the written opinions to the construction unit for supplement, modification or appraisal.

Work report examination and approval system

The construction unit shall submit a written report to the supervision engineer for approval after the preparatory work is completed.

Measuring, Positioning and Line Inspection System

The supervision engineer of the construction unit submitting for approval shall organize the acceptance within the 18 inspection form, which shall be approved and implemented by the earthwork planning and management department.

Inspection and reinspection system for engineering materials and components.

Engineering materials, components, etc. Should be submitted to the construction unit for approval, supervision should immediately review the factory certificate and quality guarantee, and conduct on-site inspection. After the re-inspection is qualified, it shall be approved by the supervision engineer, and the supervision engineer shall reply.

Design change verification system

Any change in project construction must be confirmed by the owner in writing. For the design change of the owner's construction unit, the design unit must verify the shortcomings of both parties with the supervision engineer, otherwise the project will not be implemented.

Process quality inspection and acceptance system

The construction unit shall fill in the form on the basis of process quality self-inspection and submit it to the supervision engineer for inspection and acceptance. The supervision engineer should reply within 18 that the project quality inspection and evaluation are needed, and then the construction unit will inform the supervision, join the owner to participate in the process evaluation that failed the supervision acceptance, and hand it over to the survey construction unit for process construction.

Building case reporting system

The construction unit shall submit detailed written construction cases to the supervision engineer before the construction of key parts of the project and major projects of special construction projects, and report them to the supervision engineer for review. The supervision engineer shall give a reply within three days.

Concrete pouring application system

After the construction unit completes the preparation for pouring concrete, it shall fill in the form and report it to the supervision engineer for approval. Concrete pouring works with complicated procedures shall be submitted together with the pouring construction case and approved by the supervision engineer.

Unit project, foundation, room and completion declaration and acceptance system:

The supervision engineer shall conduct a comprehensive inspection of the project before the third-level acceptance, and notify the construction unit in writing of the rectification opinions. After the rectification, the construction unit shall report the rectification in writing, notify the supervision engineer to review the rectification, and then approve the report to the supervision station for acceptance, or refuse to participate in the acceptance.

Engineering quality accident handling system

Any construction project that needs to be reworked because the quality of the original construction project meets the design requirements or exceeds the deviation range specified in the inspection and evaluation is collectively referred to as the engineering quality accident.

1. Send quality accident supervision engineer to fill out a form to inform the construction unit to suspend the road and process construction of this part and its related parts, and do a good job in corresponding protection.

2. The construction unit should write the accident investigation report as soon as possible.

3. When the hidden dangers meet the requirements of building functions, the chief supervision engineer shall negotiate with the owner, quality supervision station, design and construction research to determine the accident treatment scheme according to the principle of economy and rationality.

4. The supervision engineer shall strictly supervise the implementation of accident handling and carefully check, and notify the quality supervision and design department to participate in appraisal and acceptance when necessary.

Construction progress monitoring and reporting system

The construction unit shall fill in a form to report the progress of the project, and the supervision engineer must complete the review within five days after receiving the report.

Investment supervision and approval system

The construction unit shall confirm the number of qualified projects according to the lecturer's declaration form, deduct the amount payable according to the contract, fill in the form and report it to the supervision engineer for approval, and the owner shall pay it.

Safety supervision system

1. Review the key contents of the construction organization design and the safety guarantee system of the construction unit.

2. The construction supervision engineer shall check the operation of the safety guarantee system of the construction unit.

3. Acceptance of process, foundation and interval. Even if the project quality is qualified and the safety is qualified, the supervision engineer will confirm to enter the process construction.

4. To assist the owner to formulate corresponding safety and health management penalties and implement them.

5. Prepare emergency communication contact map to prevent the occurrence, guarantee and treatment of special events.

Supervisory case system

1. Work coordination

The construction unit shall report the completion and implementation of the discussion arrangement;

The construction unit shall report the progress of the project, the original situation and remedial measures;

The construction unit shall report the quality, safety and hygiene of the project;

Problems that the construction unit needs to coordinate and solve;

Coordination of supervision engineer;

Instructions from the Owner and Chief Supervision Engineer

2. Security and civilization

The safety supervision engineer shall sort out the minutes according to the meeting and issue a written rectification notice.

Establish the idea of safety first, adhere to prevention first, firmly grasp this guiding ideology, and urge the construction unit to be safe and civilized.

Supervision work reporting system

The chief supervision engineer shall regularly report the project quality, progress, investment and supervision work to the owner according to the supervision contract.

The supervision engineer fills in the supervision record system.

The supervision engineer shall record the quality status and influencing factors of the project and report to the chief supervision engineer regularly.

Supervision engineer duty inspection system

On the basis of the rights, responsibilities and interests stipulated in the contract, the supervision engineer shall carry out his work in accordance with the principles of openness, independence and autonomy.

It is applicable to current building structure codes, current building design codes and current building construction codes.

Urgent need, thank you

My email address: ZZ88011497 @163.com.