Traditional Culture Encyclopedia - Weather forecast - 3 engineering meeting minutes template
3 engineering meeting minutes template
Sample minutes of engineering meeting 1:
On the afternoon of April 18, the first supervision meeting was held in the "_ _" conference hall, presided over by the project manager _ _.
Participating unit: _ _ Group Co., Ltd.
_ _ _ _ Engineering Consulting Co., Ltd.
_ _ _ _ Construction Group Co., Ltd.
(See attached list of participants)
The matters agreed at the meeting are summarized as follows:
Construction unit:
1, authorize and explain the supervision scope, responsibilities and authority of the supervision unit, and emphasize that the commencement order, shutdown order, resumption order, time limit for a project visa, economic visa and project payment must be approved and confirmed by the construction unit before they can take effect.
2. The supervision unit shall prepare a supervision diary every day and record the construction process of the supervision station according to the requirements of the specification.
3. After on-site inspection, it was found that the road silt was not cleaned, the car washing platform was not set, there was no steel bar processing shed, and there was no safety warning sign on site. The construction unit must rectify the above problems within ten days.
4. The construction unit shall complete the safe and civilized construction layout of the construction site within a time limit. If it is not completed within the following time, it shall pay the corresponding liquidated damages:
(1). On April 22nd, the site wall masonry was completed. Finish painting the wall on April 23, or you will be fined 2000 yuan; (2) On April 30th, set up a steel processing shed and warning signs; Complete the car wash; Complete the installation of the site gate; Complete the setting of seven cards and two diagrams; Complete the hardening of the construction road, otherwise a fine of 5000 yuan will be imposed.
5. The construction unit shall notify the supervision unit and the construction unit for acceptance only after each working procedure is completed.
6. During the construction of key parts and processes such as concrete pouring and steel structure hoisting, the supervision unit shall arrange supervisors to stand by on the spot.
7. The weekly supervision meeting will be arranged on Thursday morning, and the minutes of the weekly supervision meeting will be compiled before Saturday afternoon and sent to the construction unit and the construction unit.
8, the construction site peripheral health must be cleaned daily. If the roads in the factory are found to be polluted, 500 yuan will be fined every time.
Supervision unit:
1, during the construction process, the construction unit shall carry out the construction in strict accordance with the design drawings, and the construction unit shall submit the general construction progress plan and the layout of the construction site for approval before pouring the bearing platform.
2, the construction unit in the next working procedure before construction, must check the hidden data and material test report and inspection batch and other information.
3. The construction unit shall provide a set of site construction drawings to the supervision unit.
Construction unit:
It is planned to organize pile foundation acceptance and drawing consultation next Tuesday (April).
_ _ _ _ Engineering Consulting Co., Ltd.
20__ _ _ _ _ _ _ _
Sample minutes of engineering meeting Part 2:
Venue: Office of Project Department on site
Time: 20 _ _ _ _ _ _ _
Moderator: Deng Yonggang
Record: Yang Guangwu
Please refer to the attached attendee meeting sign-in form:
Meeting contents:
1) According to the company's plan, the construction of three links and one leveling must be completed before 6# 7# 8#, so about 80% of the three links and one leveling will be excavated and the basement of the comprehensive commercial building will be excavated.
2) According to the progress of the company's meeting spirit project, Linchuan No.1 Middle School completed the construction of all fences and septic tanks on 15 this month.
3) According to the company's regulations, the 5m gate next to the transformer must be completed before June+10/5, 65438. The material used is the sandwich panel of the prefabricated house wall, and the height is subject to the height of the flat fence. Completed by Linchuan with one click.
4) According to the project schedule, it is required that the leveling construction team must complete the excavation of the basement of all comprehensive commercial buildings before February 15.
5) As the Spring Festival is approaching, the construction unit is required to pay attention to the on-site construction safety and on-site duty arrangement during the festival.
6) According to the construction requirements, when building a septic tank roof in Linchuan No.1 building, the required reinforcement must be double-layer bidirectional reinforcement, and finally achieve the required strength.
De Fang Yi Kai Engineering Technology Department
20__ _ _ _ _ _ _ _
Model of engineering meeting minutes Part III:
Time: the afternoon of the 20th.
Venue: Project Department of Shiyuan New Village.
Participants: Ada Zhenzhang, Chudu Construction Company Zhang Changbin, shift supervisors, carpenters, steel bar workers, plumbers, bricklayers, supervisors of Guohan Supervision Company.
At the meeting, the construction unit first summarized the preliminary work and put forward requirements for the current construction progress, quality and safety. It is pointed out that since the construction started on June 26th,165438+,the construction progress has been unbalanced, and some teams and groups have a weak sense of quality, which is mainly manifested in uneven mortar joints, bricks not wetted in advance, and verticality exceeding the standard. The appearance quality of the formwork is poor, the additional reinforcement of the floor is not firmly bound, the protective layer pad is thin, and it must be within 1 m, and a horse stool is needed. The bricklayer should wet the brick half a day before bricklaying, and 300 yuan will be fined once he finds that he doesn't draw water. When pouring constructional column, it must be carried out in layers, and it is forbidden to vibrate after concrete is filled. When pouring other parts, be careful not to deviate. When carpenters set up templates on the panel, they must make good use of wooden boards. The first layer of support is trapped on the soil surface, and the bottom of the support must be padded with wooden boards. The constructional column template should be reinforced firmly. When pouring, carpenters should follow suit, and the template should not be dismantled prematurely. It can only be dismantled with the consent of the project department, and a safe passage should be reserved.
Reinforced workers should pay attention to the corner additional reinforcement can not be omitted, the pad should be well padded as required, the steel bar lap should meet the specification requirements, and the reinforced workers should follow the classes when pouring concrete, and correct the problems in time when found.
The plumber should follow the class when pouring water.
Safety: Pick-up boards and scaffolding must meet the safety requirements, and it is forbidden for each team to connect wires privately. When wiring is needed, notify the project department to send someone to do it. Gantry crane must be equipped with a limiter, and someone must be responsible for operating the gantry crane. Construction personnel are strictly forbidden to go up and down with the gantry crane, and the receiving platform must be erected with steel pipes and separated from the floor and gantry crane. For the problem that the construction workers don't wear safety helmets at work, a fine of 5 yuan was found.
Time limit for a project: it will be completed and put into use on April 25th, and each team will count down to assign homework. If it is overdue, it will bear economic compensation, because it has signed a contract with the relocated households and delivered the house on May 1 day.
The project department put forward two guarantees to the construction team, three of which are in place: raw materials are guaranteed to be supplied and funds are guaranteed to be cashed; Understanding in place mainly refers to quality, safety and progress. This phase of the project is the key project in the county. Each team must fully improve their understanding of the above three items to ensure that they are implemented in accordance with the construction period, quality requirements and safety requirements. Teams must be put in place on the basis of raising awareness, and work overtime in fine weather. If rework is caused by quality accidents, the economic losses shall be borne by the team, and the fines shall be borne by and deducted from the team.
The supervisor believes that the requirements of the construction unit for the preliminary work and current construction are comprehensive, especially in raising awareness. Personnel involved in the construction must have quality awareness, safety awareness and progress awareness. In addition to agreeing to the relevant requirements put forward by the project department, the following requirements need to be added: 1. At the current temperature, the time for dismantling the floor formwork shall be no less than 15 days, and support shall be provided after dismantling. Second, there is no embedded pipe with additional reinforcement. If there are more than two pipes, a layer of Ф 6 steel mesh of 1㎡ must be added to prevent floor cracks. Three, the floor is not qualified fragile protective layer pad shall not be used.
The construction party requires that the current construction period is tight, so you must raise awareness from the aspects of quality, safety and progress, take action and complete the current project as required.
Anhui guohan supervisory company
20__ _ _ _ _ _ _ _
3 Related articles in the minutes of engineering meeting:
★ 3 samples of engineering meeting minutes.
★ Model paper of project meeting minutes
★ There are 3 model essays on minutes of engineering meetings.
★ 3 sample factory meeting minutes
★ There are 3 model essays on minutes of architectural engineering meetings.
★ There are 6 model essays on minutes of engineering meetings.
★ There are 3 model essays on the minutes of the site meeting.
★ There are 7 kinds of model articles and formats of engineering meeting minutes.
★ There are 3 sample essays on minutes of meetings of the Project Department.
★ 3 sample meeting minutes
- Previous article:What to wear to Thailand in August? What to wear to Thailand in August?
- Next article:What are the disasters in China from 2000 to 2020?
- Related articles
- What does smog mean?
- How to go fishing in hot and cold weather in spring?
- Detective Conan's dramas are all independently completed by detective teams. Well said.
- How can pig fat get better quickly?
- Choose a day to remember animation Choose a day to remember animation Baidu Encyclopedia
- What are the weather characteristics of Hainan Island in winter?
- 2065438+0065438+1Weather forecast of Xiantao on October 24th.
- What's the difference between a computer and a tablet?
- Ancient poems on rainy days
- Where is the best place to live in Guangxi?