Traditional Culture Encyclopedia - Weather forecast - Minutes of supervision safety regular meeting
Minutes of supervision safety regular meeting
In real life or work and study, meeting minutes are more and more widely used in life. The minutes of the meeting truthfully reflect the contents of the meeting. Without the actual meeting, it can't be recreated, otherwise it will lose its objective authenticity. So do you really know how to make meeting minutes? The following is the summary of the supervision safety meeting I compiled for you. Welcome to read the collection.
Minutes of Supervision Safety Regular Meeting 1 Time: 20xx65438+February 1.
Venue: Party A's conference room
Moderator:
Participating units and personnel:
Construction unit:
Supervision unit:
Construction unit:
Meeting contents:
First, the specific problems found in this week's security risks investigation:
On-site:
1. There is no obvious eye-catching sign on the fence near the garage.
A construction worker in the garage didn't wear a helmet.
Second, the implementation of safety inspection last week:
1. Last week, the project department punished the responsible teams that closed the entrance security doors of each building number after use, and formulated corresponding rules and regulations to be effectively implemented in each team.
2. According to the situation of the construction site, the project department conducts a unified investigation on the fire-fighting equipment on the construction site, replaces the unusable fire extinguishers, and strengthens the fire safety awareness of the construction personnel.
3. The project department investigated the mechanical equipment and electricity consumption at the steel bar processing site, grounded it to zero as required, implemented "one machine, one brake and one protection", and ordered the construction personnel to keep the brake box clean and tidy.
Three. Specific requirements put forward by the supervision unit for the safety work on the construction site:
1. The construction of the main garage has started, and the project department is required to hang safety signs in the eye-catching position of the enclosure around the foundation trench.
2. Garage construction personnel have entered the site, and the project department is required to conduct three-level safety education for new construction personnel to increase their safety awareness.
3. When the weather is dry in winter, there is no open flame on the construction site. When welding and cutting, it is necessary to obtain a hot certificate, strictly abide by the operating specifications, and clean up the combustible materials on site. Before welding, the site should be cleaned up in advance, and there should be no snow and ice, and a special person should be appointed for fire monitoring to prevent fire and ensure construction safety.
4. The project department should regularly check the fire-fighting equipment on the construction site, and replace it in time if it cannot be used.
5. Strengthen the safety awareness of construction workers and elevator drivers, handle problems in time when found, never work in spite of illness, and regularly train drivers on safety knowledge.
6. It snowed last week, and the weather suddenly turned cold. At this stage, the project department is required to investigate the electricity consumption of the construction workers' dormitory, and the dormitory area should also take fire prevention measures. It is forbidden to connect wires privately, and it is forbidden to use electric blankets, electric stoves and other heating facilities in the dormitory to prevent fire. Managers should inspect workers' dormitories from time to time and formulate corresponding safety measures.
7. In case of bad weather such as rain and snow, the project department should arrange personnel to clear the snow in time and remove the accumulated water at the scene.
8. Winter construction will be carried out at this stage to strengthen labor protection. Construction personnel will wear gloves, rubber-soled shoes and anti-skid measures.
9. At this stage, the installation units such as doors, windows and fire doors will start construction, and the project department is required to formulate finished product protection measures to strengthen the awareness of finished product protection of construction personnel.
10. Before the Spring Festival, there is a high incidence of theft, so the project department is required to strengthen security work, take anti-theft measures and strengthen night patrol.
1 1. Strengthen the self-safety awareness of new construction personnel and issue safety helmets. Anyone entering the construction site must wear safety helmet correctly.
12. The project department shall timely implement the issues raised at the meeting.
Four, the construction unit requirements:
1, clear the water and ice on the construction site and transportation roads in time after rain and snow to eliminate potential safety hazards; And before construction, the scaffolding and the ice and snow on the scaffolding must be removed.
2. The project department should check the electrical lines in time after the snowstorm to prevent electric shock accidents caused by line disconnection and damage.
3, the project department according to the current construction situation, formulate finished product protection system, increase the consciousness of finished product protection of construction personnel.
4. Strengthen the security work of the construction site and prohibit irrelevant personnel from entering the construction site. Anyone entering the construction site must wear personal labor protection articles correctly.
Countersign:
Construction unit:
Supervision unit:
Construction unit:
Minutes of Supervision Safety Meeting 2 Project Name: Fifth Bid Section of South Extension Line of Qinshi Avenue
Name of the meeting: Work Conference on Construction Safety Supervision
Moderator: Wang Dongfeng (Qinzhou Branch of Tianjin Binhai Development and Investment Holding Co., Ltd.)
Meeting place: Meeting room of Project Department of Bid Section 5.
Meeting date: 20xx April 20th.
Participating units and personnel: safety supervision engineer of each bid section of Yang Fan Avenue (see the meeting sign-in form for details).
Meeting contents:
According to the current progress of the project and the safety problems existing in the construction site, a meeting on strengthening the construction safety supervision was held, which was attended by the safety supervisors of each bid section, to specifically arrange and clarify the tasks and requirements of the next stage of safety supervision. It is hoped that all project supervision departments will abide by it, earnestly perform their duties of safety supervision in the process of supervision, and provide due supervision and guarantee for safe construction. Specific tasks and requirements mainly include the following aspects:
1. Require the project supervision department to conduct a comprehensive safety inspection on the construction site jointly with the project department of the construction unit on 20th of each month, and report the inspection and rectification results to the owner in writing before 25th of that month. Attached is a unified safety checklist.
2. Pay special attention to hidden dangers in construction subdivisional work (such as bridges and culverts) with more hazards, so as to find problems in time and rectify them in time.
3. Supervise the construction unit to organize the rainy season construction in strict accordance with the approved rainy season construction safety measures and schemes.
4. Deep foundation pit and foundation trench should urge the construction unit to do a good job in limb protection facilities and arrange corresponding warning signs.
5. Supervise the construction unit to arrange temporary power lines according to relevant specifications, and do a good job in the safety protection of the power lines that have not been dismantled in the working face to ensure a safe distance.
6. Urge the construction unit to strengthen the safety education for the drivers of construction transport vehicles to prevent casualties and ultimately affect the construction period.
7. Supervise the construction personnel on the construction site to wear safety helmets, and ask the supervisors to take the lead.
8. Each project supervision department is required to be equipped with a full-time safety supervisor, and the owner will check the site safety together with the full-time safety supervisor irregularly.
9. Other contents that should be paid attention to in strengthening supervision:
(1) Earthwork excavated in the drainage ditch shall be piled up beside the ditch according to the requirements of construction specifications.
(2) Make temporary drainage around the subgrade to prevent the formed subgrade from being soaked by water.
(3) If you need to use the formed subgrade for paving, you can only pass in a fixed area, and you are not allowed to occupy other areas without authorization, so as not to damage the subgrade.
Organizer: Guangxi Hualan Engineering Consulting Management Co., Ltd.
Yang Fan Avenue No.5 Bid Engineering Supervision Department
20xx April 22nd
Minute of Supervision Safety Regular Meeting 3 Meeting Time: 20xx February 10 pm 15: 00.
Meeting place: live meeting room of xxxxxxxxx, Shandong.
Participants:
Supervision unit: xxx
Construction unit: xxx
Meeting host:
Agenda of the meeting: problems found in on-site safety inspection
Prepared by:
Reviewed by:
Main delivery: Shandong xxx engineering department
Cc: xxx Company of Shandong Province
Meeting contents:
First, the problems found in the on-site inspection:
The supervisor led the organization to inspect the construction safety and electricity consumption of the construction site, and found the following problems during the inspection:
Hot work procedures should be handled before welding machine operation.
Second, the supervision unit of the construction unit's questions and requirements:
(1) The electricity consumption in the dormitory area must be strictly managed, and electric blankets, patch panels and wires with potential safety hazards are strictly prohibited.
(2) The heating electricity in the dormitory area requires a separate switch, and the power supply is turned off during working hours.
(3) Check the safe use of electricity in workers' dormitories after the meeting.
(4) The problems found in the inspection should be seriously rectified, and the immediate actions proposed by the supervision unit should be put in place.
Third, the construction unit-safety management:
(1) Safety first, strengthen safety management, and no construction is allowed without safety guarantee in any process.
(2) The welding lines in the steel bar welding area are piled up in disorder, and there are many construction workers, so the pile foundation team is required to rectify immediately to ensure the safety of electricity consumption in the construction site.
(3) Strengthen site safety management to ensure safety during construction, and the supervision department shall be supervised by the safety director. If safety factors are found, they should be rectified immediately.
(4) When hoisting steel bars, construction personnel are prohibited from entering the hoisting scope, and all personnel must wear safety helmets as required before entering the construction site.
Minutes of Supervision Safety Regular Meeting 4 Meeting Place: Meeting Room of Project Department of Biao (Engineering Co., Ltd.)
Meeting time: 3 p.m. on March 7th, 20xx.
Moderator: Minister of Safety and Environmental Protection:
Participants: safety experts from the Quality Supervision Department of Hongyang Company, safety supervision engineers of various resident offices, safety managers of various construction units and safety ministers of the Ministry of Security. (* * people)
Development of safety work in January and February
In February, with the normalization of various projects after the holiday, on-site safety management was gradually carried out in depth. The safety supervision work carried out this month is as follows:
1, and signed 20xx annual safety production and safety management target responsibility letter with various resident offices and construction units.
2. From February 17 to February 24, according to the requirements of the documents, the security department of the Second Director's Office conducted a special inspection on each bid section.
3. In order to do a good job in maintaining the stability of letters and visits during the two sessions of the National People's Congress, our unit set up a leading group according to the requirements of the documents and implemented a daily reporting system. Found signs of letters and visits, deal with them as soon as possible, and resolutely prevent the occurrence of letters and visits.
4, continue to strengthen the management of safety production cost measurement and safety production cost use. TJ- 10~TJ- 17 Project Department is required to declare the measurement data as soon as possible according to the document requirements.
Second, the problems existing in the safety work
TJ 10—TJ 17 has a good safe working environment. However, there are also many problems in safety management:
65438+
2. Try your luck in safety work: some employees of the construction unit think that it is very important to be too demanding on safety, which affects the construction progress and turns a blind eye to potential safety hazards.
3. Poor implementation of safety work: the established safety management organization is a mere formality, some systems are not implemented, or the enforcement is not enough;
4. The professional level of personnel engaged in safety work is low: full-time safety personnel are not in place, unstable, irresponsible and inaction; Safety management personnel are not in place (low certificate-holding rate): poor working ability and business level, the monthly report is not hierarchical, the content is untrue, and the monthly report is submitted late.
5. The safety system is not perfect: the system formulated by the construction unit is formal (for inspection), and the emergency plan for safety production is not targeted and no drills are conducted.
6. Safety training and education is not timely: the quality of the labor force is not high, the safety awareness is not strong, the basic ability to identify and identify hazards is lacking, the labor force is highly mobile, the safety management is more difficult, the safety measures are not implemented in place, and the unsafe factors are increasing;
7. lax management of safety funds: the accounts of safety funds in individual units are chaotic, and the management of expenditure, payment, investment and use is not perfect.
8. The hidden dangers in the construction site are prominent: 1) There are too few safety warning signs, which are not eye-catching; The brand is broken, dirty and crooked, and it has not been repaired, updated and righted in time; 2,), temporary electricity consumption is not standardized (mainly power box); 3.) The hole protection of pile foundation is not in place; 4. Poor civilized construction (untidy stacking of materials); 5) Improper use of personal safety protection articles on the construction site; 6), blasting management tends to be lax, etc.
Three, 20xx annual safety work requirements
1. Face up to the importance and arduousness of safety work this year.
This year's safety work is arduous, with great responsibilities and heavy burdens. 1), the project will set off a climax. The construction area is large, there are many construction sites, and major hazards are increasing. 2) The reconstruction and expansion project adopts the way of "opening to traffic and construction at the same time", and the guiding ideology of safety work is "construction obeys guarantee, and guarantee serves construction", so it is necessary to be safe during construction and the expressway is safe and smooth; 3) This year, dikes will be widened, high slopes will be demolished, and the sky will be demolished. Therefore, we must correctly understand this year's safety work and try our best to do it well.
2. This year's safety work focuses on the construction site, and the information in the industry is updated in time according to the progress of the project.
All construction units should fully understand the importance and necessity of doing a good job in construction safety and quality from the perspective of politics, overall situation and discipline, enhance their sense of responsibility and urgency, always put construction quality and safety first, and strengthen work measures according to the division of responsibilities to prevent safety and quality accidents. Earnestly implement the responsibility system for production safety, establish the project manager as the first responsible person, and always be responsible for construction safety. Establish and improve the quality and safety system through the establishment of rules and regulations, establish a horizontal to vertical responsibility system for civilized construction and safety construction, and put the responsibility on people and do all the work in depth and detail.
3, complete full-time security officer.
Each bid section must be equipped with full-time safety officers in accordance with the requirements of the safety production organization and staffing of the construction unit stipulated in the Measures for the Supervision and Administration of Safety Production in Highway and Waterway Engineering. Namely; The construction unit shall set up a safety production management organization, equipped with full-time safety production management personnel. The construction site shall be equipped with full-time safety management personnel according to the proportion of 1 full-time safety management personnel for every 50 million yuan of construction contract amount, and at least 1 person for those less than 50 million yuan.
4. Continue to implement the attendance records of full-time safety officers and safety officers, monthly safety production report and "weekly safety site report" system.
1) The attendance record shall be truthfully attended by the safety supervisor of the resident office, and shall be reported to the Safety and Environmental Protection Department of the Director's Office at the end of each month.
The monthly report is required to be submitted once a month, the electronic version must be submitted on the 22nd of each month, and the cardboard must be delivered before the 25th.
2. The monthly report of the resident office should be standardized, and the content should be specific and detailed (the monthly report of supervision should include the image progress of this month, safety supervision, issuance of rectification notice, overall feedback from the construction unit, supervision and rectification, use of safety expenses, report and implementation of major issues, and summary of this month, etc.). ).
3) The monthly report of the construction unit includes the safety work carried out this month, what work was done during the safety work, what problems still exist, and the safety work arrangement for next month. )
5 to strengthen the investigation of hidden dangers, and all units should establish a dynamic management inspection system for safety production.
The resident office regularly organizes self-examination and self-correction activities for safety production according to the prescribed frequency; The self-examination and self-correction activities carried out by the construction unit should be "fixed by personnel, time, measures and funds" to rectify and eliminate potential safety hazards. The inspection and rectification shall be recorded, and the personnel involved in the inspection and the rectification personnel must sign the records for confirmation. The rectification should be accompanied by pictures or videos.
6, increase the fines for "three violations"
According to the "safety production punishment standard (Trial)".
7. Continue to strengthen safety education and training.
All construction units should take various forms to educate and train employees in production safety. Employees who have not passed the safety education and training are not allowed to take up their posts. Special operations personnel must hold relevant certificates, and employees waiting for posts, transferring posts and changing posts must receive safety training and education before taking up their posts.
8, improve the level of safety management
Personnel engaged in safety work should strengthen the study of safety professional knowledge, learn from each other, clarify their responsibilities, perform their duties, avoid complaining and complacency, and seek initiative in their work.
Four, the leadership put forward the following requirements for the next step of safety work.
The director, experts and director of the quality supervision department of the company respectively put forward suggestions and requirements for future safety work:
1, do a good job in safety management, safety work to a higher level.
2.20xx years, the key points of safety work are mainly bridges, aerial work, high pier construction, high slope construction, road widening on both sides, interchange guarantee, overpass demolition, beam yard construction and large-scale equipment first-class bridge erection.
3, each bid should attach great importance to the construction site temporary electricity and the use of special equipment.
4, each block should be equipped with a sufficient number of qualified full-time security officer. For full-time security officers, it is necessary to divide responsibilities, clarify responsibilities, and divide responsibility plates; Safety officer armband must be worn on the construction site; At the construction site, especially in high-risk operation areas such as high slope excavation, high pier construction, overpass demolition construction, tunnel construction, deep foundation pit construction and erection construction, at least one full-time safety officer must be equipped.
5. Respond to the notice of rectification of potential safety hazards, issue the notice of rectification of potential safety hazards to the problems found in the daily inspection of each bid section, make a rectification reply in time, and resolutely put an end to all kinds of safety accidents.
;
- Previous article:Where is Tianxing Pool?
- Next article:Does Typhoon Mawa have an impact on Sanya?
- Related articles
- Travel to Beijing this weekend and ask about the weather.
- Where is the lion's mouth in Baimaoling?
- Japanese fruits that will make you doubt your life
- What's the weather like in Maldives during May Day?
- Three-zone weather
- By mid-June 1 1, where is more fun to travel to Guizhou?
- What happens when a balloon flies into the sky?
- What are the eight battles of the Long March?
- Huidong xunliao bay Huidong xunliao bay Mozishi Park
- Greetings from January to December