Traditional Culture Encyclopedia - Weather forecast - Where is Fuyang Railway Station?

Where is Fuyang Railway Station?

Fuyang enjoys convenient transportation and extends in all directions. The Beijing-Kowloon Railway runs through the whole territory from north to south, and forms a "meter" frame with four railways in China: Fu Shang, Luofu, Qingfu and Fuhuai. It is the starting point of the second passage in East China, and is directly connected with railway trunk lines such as Longhai, Beijing-Guangzhou and Beijing-Shanghai, forming one of the six railway hubs where the eight lines are introduced and the five roads intersect.

Fuyang Railway Station is located within the jurisdiction of yingdong district, at the intersection of Beijing-Kowloon Line, Qingfu Line (Qinglong Mountain-Fuyang), Fuhuai Line (Fuyang-Huainan) and Luofu Line (Luohe-Fuyang), and its geographical position is very important.

Fuyang Station is an important railway hub of Beijing-Kowloon Railway and even the national railway network. Fuyang Station passes about 90 pairs of fixed trains every day, and nearly 150 pairs of passenger trains on the highest day, almost every 10 minute. In recent years, Spring Festival travel rush has sent more than 3 million passengers at peak hours, with an average of 103 trains per day, and a train passes in less than 15 minutes.

Fuyang Railway Station was built in 197 1 year, under the jurisdiction of Shanghai Railway Bureau, and is now a first-class station. Since August 2006, the Ministry of Railways and Shanghai Railway Bureau have invested a total of 654.38+0 billion yuan to renovate Fuyang Railway Station and expand the waiting room. On June 29, 2008, the reconstruction and expansion project of Fuyang Passenger Station was completed, forming a pattern of 5 sets and 9 lines, and the transportation capacity was expanded by 80%. The area of the reconstructed waiting room is nearly1.2000 square meters, which is 1.5 times more than the original waiting room, and the maximum waiting capacity reaches nearly 8000 people. Secondly, the new ticketing building has 40 ticketing windows, 26 more than the original ticketing windows. In addition, there are eight "landscape sheds" with tensioned membrane structure in the station square, which can accommodate 5000 passengers at the same time, making it possible to wait for the bus. Before Spring Festival travel rush in 2008, a brand-new station appeared in front of migrant workers, and a modern farmer station was built for 50 years, 100 years.

Source: yingdong district Government Network.