Emergency Plan for Waterlogging on Rainstorm Roads

Emergency Plan for Rainstorm Road Waterlogging 1 In order to prevent and deal with sudden disasters in flood season and minimize possible harm and impact, the Economic Development Zone has formulated this plan according to the spirit of document [202 1]4.

I. Guiding ideology

In accordance with the principle of "careful deployment, ensuring safety, focusing on key points, and responsibility to people", do a good job in emergency drainage of waterlogged sections and waterlogged points in summer within the jurisdiction of Economic Development Zone, and create a good environment for enterprise development.

Second, the working principle

(1) give priority to prevention. Intensify investigation, carefully investigate possible safety hazards, and take effective prevention and control measures to reduce the occurrence of emergencies.

(2) Management according to law. According to the division of labor requirements of water accumulation investigation, all relevant departments should strictly implement, carry out their duties, strictly manage, and manage according to the requirements of emergency plan.

(3) rapid response. According to the requirements of the division of responsibilities between waterlogging spots and waterlogging-prone spots, all relevant offices should establish an early warning and rapid response mechanism, immediately enter the flood season response state, start a special emergency plan, and take decisive measures under the unified command of the leaders of the Economic Development Zone to control the situation in the shortest time and minimize the harm and loss.

Third, the emergency organization system and responsibilities

The establishment of road and water emergency rescue headquarters.

(1) emergency headquarters

Commander in chief:

Deputy command group leader:

Deputy commander:

There is an office under the headquarters, which is located in the enterprise service center of the Economic Development Zone. Wei Liang is the director of the office, and the telephone number of the office is XXX. Members of emergency headquarters are responsible for the units with waterlogging spots and easy waterlogging spots, and shall bear their respective responsibilities according to the responsibilities of the units.

(2) emergency headquarters's main responsibilities

1, relying on Bozhou flood control working group, quickly convey the work instructions of the city leaders, and all offices carry out the rescue task of road water accumulation according to the subcontracted sections and water accumulation points.

2, strengthen contact with the city, district government and relevant departments, timely report and inform the relevant information.

3. During the flood season, each member shall ensure smooth communication for 24 hours, notify the emergency team in time according to the instructions of the superior, and start the emergency plan.

4, emergency team unified arrangement scheduling.

(3) personnel, materials and vehicles during the flood

During the flood season, three emergency construction units for road water accumulation were signed, equipped with 15 emergency fixed personnel, 2 pipeline dredging vehicles, 5 sewage suction vehicles, pumps and generators over 6 inches, and fixed power supply was installed at drainage points.

Fourth, the division of responsibilities

1, according to the point length system, divide the water accumulation points investigated in 202 1:

At eleven o'clock, Zhu Jiong, three law enforcement team members of Qiaocheng Economic Development Zone are on duty, one pump truck and five sewage suction vehicles (Qiaocheng Law Enforcement Bureau arranges vehicles to be on duty); Emergency construction unit Anhui Xinheng Construction Co., Ltd. 5 workers.

Jin Feng, the person in charge of Wendi West Road, three law enforcement team members of Qiaocheng Economic Development Zone, and five workers (mobile) of Anhui Xinheng Construction Co., Ltd., the emergency construction unit, are on duty 1 sewage suction vehicle.

The person in charge of Lu Yang is on duty with three law enforcement team members from Qiaocheng Economic Development Zone, five workers from Anhui Xinheng Construction Co., Ltd. and Jianzong Real Estate Co., Ltd., 1 sewage suction truck and two 6-inch pumps.

In addition, it is equipped with five emergency personnel, two pipeline dredging vehicles, three sewage suction vehicles and four pumps and generators over 6 inches as motor vehicles.

2. Emergency rescue team: Team leader Li Feng is responsible for organizing construction personnel to clean up dead branches and rotten leaves in the collecting well and dredge the blocked rainwater pipe network.

3. Organize emergency rescue team: Captain Wei Liang is responsible for the unified coordination and dispatch of construction team personnel, machinery (generators and other equipment) and pipeline dredging vehicles to ensure that personnel, materials, machinery and vehicles are in place at the first time in flood season.

4. Emergency planning team: Team leader, Niu Xiaoyan is responsible for the temporary laying of drainage pipes in unfinished road sections. According to the general situation of water accumulation points, opinions and suggestions are put forward for the planning of rainwater and sewage pipe network in economic development zone.

5. Emergency Coordination Team: Team leader, Tao Jun is responsible for contacting relevant enterprises to upload and publish the policy of road water accumulation in rainy season, and asking enterprises to actively cooperate with pipeline dredging, and do well in matters such as water drainage and self-help.

6. Emergency rescue support team: Team leader, Ding Chao is responsible for ensuring the driving order of road vehicles and guiding the safe driving routes of passing vehicles in the shortest time; Patrol the water accumulation points and report to the headquarters in time, and arrange sanitation workers to clean the road in time after the rain.

7. Emergency information submission team: Team leader Lu Ruofei is responsible for conveying the spirit of the instructions of the municipal leaders on emergency rescue and disaster relief, emergency information submission and emergency duty, ensuring the smooth implementation of government decrees, and doing a good job in propaganda and guidance of enterprises and dispatching flood control materials.

Verb (abbreviation for verb) implementation plan

1, carry out dredging maintenance for rainwater grates and pipe networks at water accumulation points in Economic Development Zone; The pumping stations of Wendi Road, Huatuo Avenue, Huoxiang Road and Wang Yao Avenue shall be staffed by special personnel, and the water pump shall be turned on at any time when there is water on the road surface; Special personnel shall be assigned to dock with the District Water Conservancy Bureau and the District Housing Construction Committee to ensure that the National Highway 3 1 1 temporary pumping station is unblocked.

2. Within 20 minutes after emergency headquarters issued the emergency alert, all rescue teams, including materials, tools, vehicles and generators, arrived at the designated place.

3. For roads with a large amount of water, implement temporary pumping operation, carry out drainage work, and take the initiative to contact the municipal drainage company and the power supply department to fully guarantee normal power supply and ensure smooth drainage.

4. Due to the phenomenon that rainwater enters the sewage in enterprises, it is suggested that the Municipal Urban Management Bureau coordinate with the Du Yao Avenue Pumping Station to pump water in order to prevent the sewage backbone network from overflowing.

5. Arrange emergency rescue team personnel to manually clear and dredge the blockage of the collecting well within the scope of easy water accumulation to ensure smooth drainage. When opening the shaft grate, set up traffic warning signs (reflective signs at night) to ensure the safety of vehicles.

6. In the process of emergency rescue, all members of the emergency team should attach great importance to safety work, be vigilant and be equipped with safety protection tools.

Sixth, the emergency drainage of stagnant water is terminated.

Recovery and rehabilitation

After the road water is controlled, immediately organize relevant working groups to carry out the aftermath.

1. ponding disposal team: feed back the occurrence of ponding, study and formulate preventive measures, and evaluate losses. Responsible for the missing statistics and damaged recovery of road rainwater and sewage manhole covers.

2. Emergency rescue team for water accumulation: mainly investigate the causes of water accumulation, study and formulate drainage schemes, and improve emergency drainage measures.

3. Emergency planning team: mainly responsible for studying the process of water accumulation and drainage, including adjusting the planned distribution of rainwater and sewage.

(2) The drainage work is terminated.

Notify all relevant units, surrounding communities and enterprises to remove the danger of water accumulation.

Emergency Plan for Waterlogging on Rainstorm Roads 2 I. Purpose:

Before the natural disaster of typhoon and rainstorm comes, we should make all kinds of emergency preparations in advance, control the situation quickly and effectively, and handle it properly to minimize the possible losses caused by typhoon and rainstorm.

Second, the beginning of the plan:

After receiving the typhoon rainstorm warning signal issued by Zhuhai Meteorological Observatory, this plan was officially launched.

Third, the organization:

(a) leading group for typhoon and rainstorm prevention:

Team leader: Su Ying

Deputy Team Leaders: Li Jian and Wu Jinhui.

Members: Long Qinglan, Ding, Hu Zhiguo, Peng, Lu Shan.

(The members of the above leading group are composed of all the staff in the general manager's office and the heads of various departments. If there is any post adjustment, it is not necessary to change this file separately to prevent the person in charge of the post from automatically filling the position when the typhoon and rainstorm plan is started. )

(2) Typhoon and rainstorm prevention working group:

1, Engineering Group:

Team leader: lu shan

Team members: all employees of the engineering department.

2. Equipment group:

Team leader: Ding

Team members: all staff of the equipment department.

3, security mobile group:

Team leader: Hu Zhiguo

Team member: All security guards.

4, administrative logistics group:

Team leader: Long Qinglan

Members:, Peng,,, Cai Li.

Fourth, responsibilities:

(a) the responsibilities of the leading group for typhoon and rainstorm prevention:

1, responsible for the organization, coordination, supervision and inspection of typhoon and rainstorm prevention.

2. Commander-in-Chief Su Ying is responsible for the overall work; Li Jian, deputy commander-in-chief, is in charge of the guard mobile group and the administrative logistics group; Wu Jinhui, deputy commander-in-chief, is in charge of the engineering group and equipment group.

(two) the duties of the typhoon and rainstorm prevention working group:

1, Engineering Group:

Responsible for the overall arrangement, inspection and coordination of typhoon prevention and rainstorm prevention in supervision and construction units within their jurisdiction.

Responsible for the reinforcement, protection, drainage and flood control of buildings, equipment and facilities on the construction site.

Responsible for the organization, inspection and implementation of personnel evacuation on the construction site.

Responsible for organizing an emergency rescue mobile team composed of construction units to stand by at any time, as a reserve team to deal with emergencies, directly sent by the leading group.

2. Equipment group:

Responsible for the overall arrangement, inspection and coordination of typhoon prevention and rainstorm prevention in supervision and construction units within their jurisdiction.

Clarify the key work contents of typhoon and rainstorm prevention and report to the leading group.

Be responsible for the reinforcement, protection, drainage and flood control of buildings, equipment and facilities on the construction site under the jurisdiction of the Equipment Department.

Responsible for organizing, inspecting and implementing the evacuation of personnel from the construction site under the jurisdiction of various equipment departments.

3, security mobile group:

Responsible for public security work within the jurisdiction, and do a good job in emergency adjustment of fixed posts and patrol posts.

Responsible for the preparation of materials needed for emergency rescue.

Responsible for the acceptance and inspection of typhoon prevention, rainstorm prevention, reinforcement and evacuation within the jurisdiction.

Responsible for coordinating relevant working groups to deal with detected security risks.

Responsible for rescue personnel in emergency rescue work.

4, administrative logistics group:

Responsible for collecting the latest typhoon and rainstorm warning information in time, and announcing the beginning and end of this plan.

Summarize the key parts of typhoon and rainstorm prevention reported by each working group and report them to the work leading group.

Responsible for the organization, coordination, inspection and supervision of administrative logistics.

Be responsible for arranging accommodation for evacuees and staff.

Be responsible for the vehicle dispatch of the administrative motorcade and arrange the first aid ambulance.

Contact medical rescue organizations and coordinate the arrangement of medical personnel.

Responsible for the coordination of various working groups.

Responsible for counting people, money and things after typhoon and rainstorm.

Responsible for insurance claims.

Five, typhoon prevention and rainstorm prevention work communication contact list:

Security, administrative personnel, engineering, equipment, catering, general affairs, art troupe, market.

Date of establishment: xx, xx, xx.

24-hour typhoon prevention team telephone:

Su Ying:

Li Jian:

Wu Jinhui:

Long Qinglan:

Tang Zhiqiang:

Hu Zhiguo:

Liu Haifeng:

Typhoon and rainstorm prevention working group: all staff of Mystic Island.

6. Evacuation location: Paradise Administration Building and Staff Dormitory.

Job responsibilities:

1, Office of the Safety Committee: responsible for organizing the work of prevention and rescue.

2. Administration and Personnel Department: responsible for collecting the latest typhoon and rainstorm news in time, announcing the start and recovery of this plan, and coordinating the wind emergency and post-event handling.

3. Security Brigade of General Affairs Department: responsible for emergency rescue, guidance and on-site protection, and assisting relevant departments in handling typhoon disasters and accidents.

4. General Affairs and Market Service Room: responsible for rescuing people injured in typhoon and rainstorm disasters and arranging emergency rescue vehicles.

5. Equipment Department: responsible for the inspection and maintenance of equipment safety in the park, and eliminating hidden dangers of equipment.

6. Engineering Department: responsible for water and electricity treatment in emergency; Protect scenic spots and facilities and repair damaged parts; Treatment of trees and flowers.

7. Finance Department: responsible for handling insurance claims.

8. Other departments: Take emergency measures to prevent typhoons and rainstorms according to the responsibilities of the department. In principle, the heads of all departments shall arrange personnel to assist in handling natural disasters and accidents.

Seven. working procedure

1. After receiving the notice of typhoon and rainstorm from superiors or relevant units, the Administration and Human Resources Department and the Safety Committee Office immediately reported it to relevant leaders and forwarded it to various departments.

2. The Administration and Personnel Department, Security Brigade, Engineering Department, General Affairs Department, Tourism Department, Catering Department, Finance Department, Equipment Department, Art Troupe and relevant departments set up typhoon and rainstorm prevention working groups, with the leaders on duty in the General Manager's office as the chief commander. Managers of all departments organize the establishment of emergency teams to lead their departments to implement emergency measures against typhoons and rainstorms.

3. All employees can recognize the signals and meanings of typhoons and rainstorms. After receiving the notice, all departments should immediately organize their employees to do a good job in wind and flood prevention.

4. Each department and office shall organize employees to inspect the facilities in the scenic spot, reinforce and fasten the assault boat, and park the coaches and cruise ships in a safe place.

5. The administrative motorcade of the General Affairs Department arranges ambulances or emergency vehicles, and the infirmary is responsible for rescuing the injured.

6. If there is a strong wind enhancement signal, a red typhoon signal or a red rainstorm forecast signal in the typhoon rainstorm signal, the security brigade should organize a volunteer rescue team with more than 15 people to stand by at the watch post as a mobile force to prevent typhoon rainstorm.

7. In case of typhoon and rainstorm when opening the park, the tourism department will inform tourists to pay attention to safety through broadcasting after receiving the notice from the administrative personnel department. Security guards of the public security brigade and personnel of all posts in the park should pay close attention to the safety of tourists, buildings and facilities in the scenic spot and report the situation immediately.

8. The leaders of the general manager's office decide whether to close the park in advance according to the size of typhoon and rainstorm. If the park is closed ahead of schedule, the general manager on duty should inform the Tourist Department to broadcast that the park is closed ahead of schedule due to typhoon and rainstorm, and the staff of General Affairs Department, Tourist Department, Equipment Department, Engineering Department, Catering Department and Art Troupe will guide the tourists to leave the park in the scenic spot.

9. After the typhoon and rainstorm, the Administration and Personnel Department will coordinate, and the General Affairs Department and the Finance Department will take photos to collect evidence, count the lost materials and be responsible for handling insurance claims.

10, Engineering Department and Equipment Department organize personnel to repair damaged building facilities, flowers and trees blown down by typhoon and rainstorm, and are responsible for cleaning up the site.

1 1. Departments and personnel who have made outstanding achievements in typhoon prevention and rainstorm prevention shall be commended and rewarded in accordance with the Staff Rewards and Punishment Regulations. Serious dereliction of duty, causing heavy losses and serious consequences, shall be investigated for responsibility according to the relevant provisions.

Emergency Plan for Waterlogging on Rainstorm Roads 3 According to the spirit of the higher-level meeting, combined with the actual situation of the geographical environment where our county is located, we adhere to the policy of "safety first, constant vigilance, prevention first, and all-out rescue", firmly establish the ideological preparation for flood control and drought relief, overcome lax thinking and fluky psychology, earnestly do a good job in flood control and drought relief, protect national property and people's lives, and ensure economic development and social harmony and stability. The Emergency Plan for Flood Control and Drought Relief is hereby formulated as follows:

First, establish organizations and strengthen leadership.

Flood control and drought relief work is related to the overall situation. All units in this system should establish flood control and drought relief organizations with the chief executive taking overall responsibility, the leaders in charge being specifically responsible, all departments participating together, and the specific responsible persons being specifically responsible, and implementing the responsibilities at different levels, so as to achieve the first-level responsibility and the first-level responsibility. The County Transportation Bureau established the "xx County Transportation Bureau 20xx Leading Group for Flood Control and Drought Relief", with Yao Min as the team leader and Zheng Lanbin, Huang as the deputy team leader; Members:, Niu Haifeng, Feng,,, Liu Conghai, Chang Ying, Chen, Zhu Bo,, Wang Xu, Jiang Chuanjun,, Niu Xuejun, Tang Xinchu. The office of the leading group is located in the office of the Transportation Bureau, with Comrade Huang as the director of the office and Zhu Bo and Jiang Chuanjun as the deputy directors of the office.

Second, the measures are in place and the guarantee is strong.

1. Strengthen inspection of flood control infrastructure to ensure safe and smooth road and waterway traffic during flood season. All units of this system should conduct a comprehensive inspection of transport vehicles, ships, highways, bridges and culverts, ferries, ferries and ports. And effectively ensure that the technology is in good condition and can be won or won. And concentrate manpower, material resources and financial resources to repair and strengthen some infrastructure (roads, bridges and culverts, docks, etc.). ) with unsafe factors. For the problems found in the inspection, effective measures should be taken immediately, rectification should be carried out in accordance with the principle of "handling special matters", risks should be eliminated in time, necessary preventive measures should be taken, eye-catching warning signs should be set up, and on-site monitoring should be strengthened, so as to create favorable conditions for winning the victory of flood control and drought relief work.

2. The emergency transportation of flood control and drought relief materials, equipment and equipment shall be given "three priorities", that is, planning priority, loading and unloading priority and transportation priority. Nanzhao Huaihe Road and Bridge Management Office and xx Toll Station of s 102 line set up green passages for flood control and drought relief transport vehicles to ensure priority release. With the flood control and drought relief headquarters issued by the "flood control and drought relief transport vehicle pass", free of tolls.

3, equipped with emergency evacuation and transportation of emergency victims and emergency transportation of road materials, and establish a rapid response mechanism for disasters in flood season. In order to ensure the evacuation of the affected people and timely dispatch of flood control and disaster relief materials, according to the requirements of provincial and municipal transportation departments and the emergency transportation capacity of the county party committee and county government, 12 buses with 30 seats each were determined from xx Branch of Fuyang Automobile Transportation Group Company for emergency evacuation of the affected people; Eight buses of xx Transport Co., Ltd., a provincial passenger transport company, are used as reserve teams, ready to use cars at any time; From xx Hongshun Highway Transportation Co., Ltd., HSBC Automobile Transportation Co., Ltd. and Luqiao Engineering Co., Ltd., it is determined that 10 truck is an emergency vehicle for transporting emergency relief materials; Two convoys were identified as emergency convoys from Hongyun Shipping Co., Ltd. to transport the affected people and rescue and relief materials;

Determine a port supervision ship from the local maritime department at the county level to supervise and inspect the safety production of ferries and transport ships along the Huaihe River and Heying River during the flood season; Road and Bridge Engineering Bureau Co., Ltd. organized 50 engineers and road workers to participate in the flood season highway rescue commando. When roads and bridges are damaged and traffic is interrupted, emergency repairs should be organized immediately. In accordance with the principle of "rush through first, then rush to repair", we should concentrate our efforts to rush through or formulate a feasible bypass plan as soon as possible, ensure the passage of vehicles evacuating victims and transporting relief materials, ensure the orderly development of emergency rescue and relief work, and try our best to keep roads open under any circumstances. Xx Highway Sub-bureau and County and Township Highway Management Office each determine a vehicle to patrol all roads in the county, and organize emergency repairs in time when dangerous sections and bridges are found, so as to ensure smooth roads in flood season.

Third, highlight key points and strengthen inspection.

The county marine department and the county transportation management office should conscientiously perform their duties and earnestly do a good job in the safety management of the ferry during the flood season. Carry out the "National Safe Production Month" and create "Safe Traffic" activities, focusing on the safety inspection of all ferries and ferries within the jurisdiction. Resolutely ban unseaworthy ferries, give full play to the role of township managers, and require them to regularly go deep into ferries for safety inspections, and report unsafe factors to local governments and maritime departments in time. It is necessary to urge enterprises and owners to conscientiously implement various safety production rules and regulations to prevent all kinds of accidents.

Four, adhere to the duty system, to ensure the smooth implementation of government decrees.

In the flood season, all units of this system should establish a 24-hour duty system and a flood disaster duty reporting system. Arrange the duty watch, make a good record of duty, release the upper situation in time, report the lower situation in time, and ensure the smooth implementation of government orders. Pay close attention to weather situation changes, meteorological and disaster warning information. Cell phones of team members of all units are not allowed to be turned off, so that they can be on call. Adhere to the leave system and do not leave your post without approval. Do a good job in publicity and reporting in flood season, timely publicize and report advanced typical figures and deeds emerging in flood control and drought relief, and promote the smooth development of flood control and drought relief work. County Bureau on duty telephone: (daytime), (24 hours). Each unit of this system will report the flood control and drought relief telephone and duty telephone to the office of the leading group for flood control and drought relief of the county bureau before June 1 20xx.

Emergency Plan for Waterlogging on Rainstorm Roads 4 I. Purpose of formulating this plan:

In order to prevent the occurrence of flood disasters in schools, implement the policy of "safety first, constant vigilance, prevention first and all-out rescue", ensure that when flood disasters occur, emergency situations can be properly handled, ensure the life safety of teachers and students in schools, maintain normal teaching order and ensure the smooth development of all work in schools, this emergency plan is formulated according to the relevant requirements of superiors and the actual situation of our school.

Second, the scope of application of this emergency plan

This plan is applicable to school flood disasters.

Three, emergency command leading group and division of responsibilities

(1) Leading Group

Team leader: Teacher Zheng

Deputy team leaders: Miss Wu, Miss Li and Miss Wu.

Members: all teachers

Rescue team: all teachers

Submitted by: Teacher Wang

(2) Responsibility

Responsibilities of the leading group: responsible for flood control in schools; Responsible for coordinating the overall work; Responsible for the resumption of school classes after the disaster. The leading group for flood control is led by and responsible for the leading group for flood control of Banzhu Township Central Primary School.

Responsibilities of the team leader: Organize, guide and coordinate the flood prevention and rescue work of our school, and be responsible for arranging and implementing the flood prevention and rescue work of the members of the flood prevention leading group.

Responsibilities of the deputy team leader: assist the team leader to do a good job in flood control and emergency rescue in the school; Responsible for other flood control work arranged by the team leader, and be responsible to the team leader for flood control work; When the team leader is absent for some reason, the acting team leader shall exercise his duties.

Responsibilities of other personnel: obey the command of the leading group and leaders, stick to the post of flood control and emergency rescue, actively prepare emergency materials and equipment, actively participate in emergency rescue, conscientiously complete various tasks of flood control and emergency rescue, and do a good job in information submission, student evacuation and parents' comfort.

Responsibilities of rescuers: obey orders, obey orders, be brave and tenacious, and not afraid of sacrifice. Rescuers must arrive at the designated place quickly and accurately after receiving work instructions, and carry out rescue work quickly according to the commander's instructions.

Four, flood control monitoring and flood control on duty

(1) flood control monitoring

Mainly for the safety monitoring of important facilities in our school, the safety of school facilities and equipment, the maintenance of doors, windows and roofs, the problems found in the monitoring process will be reported to the flood control leading group office of the central primary school in time.

(2) Flood control responsibility

This plan determines April 1 to 1 October1every year as the flood season. The school will set up a flood control duty room and a telephone on duty to keep abreast of the situation. Adhere to the 24-hour uninterrupted duty system in flood season and make a good record of duty. In case of emergency flood, the disaster should be reported to the office of the flood control leading group of the central primary school immediately.

Telephone number of flood control duty room: xxxxxxxxxxx

V. Start-up Plan and Work Procedures

According to the requirements, it is divided into four grades:

(1) Four-level warning signal for flood control:

1. The school is on duty normally.

2. Rescue team members conduct inspections on important campus facilities, and report the inspection results to the central primary school flood control leading group.

Information reporters insist on reporting the flood situation and disposal to the school every day.

(2) Three-level warning signal for flood control:

1, school duty warning.

2. The members of the rescue team check the important facilities on campus.

3. Check the storage points of important facilities and equipment of the school, check the doors, windows and roofs of the school buildings, and the information reporter will report the inspection results to the flood control leading group of the central primary school.

(three) flood control secondary warning signal:

1, the school is on alert.

2. The leading group for flood control is on standby at any time.

3. The members of the rescue team are on standby at any time.

4. Inspect the important facilities on campus.

5. Check the storage points of important facilities and equipment of the school, check the doors, windows and roofs of the school buildings, and the information reporter will report the inspection results to the flood control leading group of the central primary school.

(4) First-class warning signal for flood control: (in case of disaster or danger)

1, the school is in a state of emergency.

2, the flood control team leader to organize and direct the rescue work; Report the danger to the central primary school flood control leading group in time.

3, deputy team leader to assist the team leader to do a good job of emergency rescue, and do a good job of logistics, the teacher on duty is responsible for the evacuation of students.

4. Rescuers are responsible for rescuing materials and eliminating hidden dangers as much as possible; Assist the class teacher in evacuation.

5, involving personal safety, emergency rescue of important facilities, by the flood control team leader immediately report to the central primary school flood control leading group office, obey the unified scheduling and command of superiors.

Post-disaster disposal procedure of intransitive verbs

1. After the school receives the news of "the flood is over", Yan Wen, a flood prevention team member, is responsible for disaster statistics, and writes written materials and reports them to the office of the flood prevention leading group of the central primary school;

2, timely contact with the health and epidemic prevention departments, health inspection and disinfection;

3. If water, electricity and traffic are affected by disasters, contact relevant departments in time.

4. Organize school staff to clean up the school and prepare for normal education after the disaster.

5, actively assist the relevant departments to rescue, cooperate with the investigation and evidence collection, do a good job of condolences to the injured, and get in touch with the families of the injured in time, do a good job of appeasing the families, and strive to maintain the stability of the school and society. (The class teacher is responsible)

Seven. Training and exercises

Schools should practice emergency plans for flood disasters, so that teachers and students can skillfully understand and master relevant processes to prevent and put an end to safety accidents.

Eight, the implementation of responsibility

The accountability system is implemented in the school emergency response work, and the principal is the first responsible person, and all members perform their duties and responsibilities.

Emergency plan for road waterlogging in rainstorm 5 In order to do a good job in flood control this year, to ensure that all teachers and students in our school can spend the flood season safely and that school property will not be lost, this flood control plan is formulated according to the spirit of county documents and the actual situation of our school:

First, a leading group for flood control was established.

Team leader: Li Jian

Deputy Team Leaders: Liao Xiaodong, Gao

Members: Ran Xiaohong, Gao Tongbi, Wu,,, and Li Dengkui, class teachers of each class.

Responsibilities of the leading group: Responsible for school flood control, do a good job in school building safety inspection and surrounding geological landslide survey, actively contact and coordinate with surrounding units, and arrange school flood control and emergency rescue work. Through various forms of publicity and education for teachers and students to do a good job in flood control and flood fighting, adhere to the principle of "safety first, always be vigilant, and make every effort to rescue", take Scientific Outlook on Development as the guide, do a good job in flood control and flood fighting, and ensure that school property is not damaged and teachers and students are not killed or injured.

Second, establish a flood fighting and rescue team.

Team leader: Liao Xiaodong

Captain: Gao.

Third, the alarm procedure.

School duty room → school principal → school flood control leading group → report.

Four, flood control work arrangements and measures

1. Set up a leading group for flood control and an emergency rescue team in our school to be responsible for flood control in our school and ensure the safety of teachers and students and the loss of school property.

2. Do a good job in flood prevention propaganda, improve the flood prevention awareness of all teachers and students, and ensure that there are no casualties among teachers and students and no school buildings collapse.

3. Stick to 24-hour duty during flood control. The leading members shall be on duty, and the personnel on duty shall stick to their posts, and shall not leave their posts, take off their posts or take over. In case of rainstorm, the main leaders, team members and related teachers must arrive at their posts.

4. The security office should carry out strict and meticulous inspection on all houses, leaving no dead ends, and contact the school in time when problems are found. Each class should do a good job of investigation, and the class teacher should keep abreast of the living conditions of students' families, especially those living in remote areas, keep in touch with parents and raise awareness of disaster prevention.

5. The flood fighting and rescue team members should keep their mobile phones on, ensure the smooth communication tools and contact them in time. Whenever there is a rainstorm, they should pay attention to the rise of water level in and around the campus.

6. Do a good job in hedge nursing, especially for students who are far away. During the flood season, students in distress may leave school early as appropriate. Students in distress can't leave school alone without parents' transportation and teacher's care, and report to relevant departments in time to ensure no casualties.

Always grasp the danger. Once the school is flooded, all rescue team members should arrive at the school in time and transport the school property to a safe place.

Verb (abbreviation of verb) matters needing attention

1, the primary task of flood control is to protect the lives of teachers and students, and disaster relief should be carried out on the premise of ensuring that personnel are not harmed.

2, generally do not organize students to participate in disaster relief.

Flood control duty telephone: xxx