Traditional Culture Encyclopedia - Weather forecast - How long is the heating time in Siping in winter?

How long is the heating time in Siping in winter?

Starting and ending time of winter heating in Siping City, Jilin Province; June 00:00+0 1-00:00 April next year 10. Before heating, carry out cold water pressure test 2-3 times, and the cold water pressure test time is about 60 minutes. The purpose is to know whether the underground heating network pipeline is unobstructed and whether the ground pipeline leaks when residents are heating. The pressure test time is 2-3 times from September to June, 5438+ 10 month. If there is water leakage, you need to contact the relevant departments under the heating unit for maintenance. After everything is normal, 1 1 open the bolt to keep warm in the early morning.

The temperature in the three northeastern provinces is low in winter, so residents need heating in winter. Because the winter in Jilin Province is slightly longer than that in Liaoning Province and about five days lower than that in Heilongjiang Province, the heating cycle is about ten days longer than that of the governor of Liaoning Province, and the heating time in Liaoning Province is April of the following year 1 1- 1.

After the heating period, it will be closed, or the heating period will be delayed or the bolt will be opened in advance due to the sudden drop of temperature. The indoor standard temperature during heating period is about 18.5-26℃, and the temperature should not be lower than 18.5℃.