Traditional Culture Encyclopedia - Weather forecast - What is the road condition from Pingliang to Jingning?

What is the road condition from Pingliang to Jingning?

The road condition from Pingliang to Jingning is good, but there is a period of maintenance construction. Specifically, G22 Qinglan Expressway from Ningxia to Lanzhou, and K 165 1+500 to K 1652+300, about 7 kilometers east of Jingning Toll Station, are under maintenance construction, during which the road is half a one-lane traffic. Therefore, passing vehicles need to slow down and pay attention to driving safety.

In addition, a traffic accident occurred at K 1679 Wolong Tunnel, which is about 1 1 km from Pingliang of G22 Qinglan Expressway to Dingxi. Two-way vehicles need to enter and exit from Jingning toll station and Dashanchuan toll station temporarily, resulting in large traffic flow and slow traffic.

Therefore, the road conditions from Pingliang to Jingning are affected by maintenance construction and traffic accidents, and vehicles that need to pass should pay special attention to relevant early warning tips and road information.