Traditional Culture Encyclopedia - Weather forecast - Attention, owners! These sections of Dongguan will be closed for construction!
Attention, owners! These sections of Dongguan will be closed for construction!
1. Vehicles leading to Guantai Road from here need to bypass.
Notice on Traffic Diversion of Dalong Road in Cheng Nan Street (Guantai Road to Dalong Second Street Section)
According to the construction scheme design of Dalong Road in Cheng Nan Street (from Guantai Road to Dalong Second Street), it is necessary to divert traffic from Dalong Road in Cheng Nan Street (from Guantai Road to Dalong Second Street).
Cheng Nan Street Dalong Road (Guantai Road to Dalong Second Street) is temporarily closed in four sections. The specific phased closure is as follows:
In the first section, the four lanes from Dalong Second Street to Huajian Aluminum Gate are completely closed. The closing time is from April 2020 13 to May 2020 12.
In the second section, all four lanes from the gate of Huajian Aluminum to the gate of the garage are closed. The closing time is from May 2020 13 to June 2020 12.
In the third paragraph, the four lanes from the garage door to the Coca-Cola door are completely closed. The closing time is from June 3, 2020 to July 2, 2020.
In the fourth section, the four lanes from the entrance of Coca-Cola to Guantai intersection are completely closed. The closing time is from July 3, 2020 to September 2, 2020.
In order to ensure safety, during the construction period, the road of Dalong Road (Guantai Road to Dalong Second Street) in Cheng Nan Street will be fully closed for traffic control. Please bypass Binhe Road southbound. Vehicles going to Guantai Road from Shigu Garden Road need to bypass Binhe Road and turn north to golden road. Vehicles from Guantai Road to Shigu Garden Road and south of Binhe Road need to bypass golden road and turn to Binhe Road, and obey the command of traffic police and coordinators. The running time mentioned in the embodiment is the implementation time under normal circumstances. In case of severe weather such as typhoon and rainstorm, it will be temporarily adjusted (postponed), and then it will be notified separately by notice.
Please understand the inconvenience caused by the project construction to residents and passing vehicles along the line.
Dongguan Cheng Nan major project construction office
April 5(th), 2020
2. Vehicles going to Shuilian Road and Huanwan Expressway from here need to bypass.
Notice on traffic diversion of Chengnan Wangge Road (intersection of traffic lights from Shuilian Road to Gedi Road).
According to the construction scheme design of Cheng Nan Street Shuilianshan Road (Dongguan Avenue to Chiling Industrial Road, Wang Ge Road and Shuilian Road), the traffic of Wang Ge Road (Shuilian Road to Gedi Road at the traffic light intersection) will be diverted.
Phase 1: The intersection of traffic lights at Claudian Road (turn right at Dongguan Avenue to Kelaiwang Road) and the half lane of Kelaiwang Road (from Claudian to Shuilian Road) are temporarily closed. Closed from April 7, 2020 to April 4, 2020/kloc-0.
Bypass scheme: vehicles from Dongguan Avenue to Kelaiwang Road, Shuilian Road, Huanwan Expressway, Houjie and other sections. Please drive 50 meters into Claudia Road, immediately turn right into Claudia Community Park, turn left along the internal road of the park and detour to Kelewang Road, and follow the instructions of the on-site traffic police and coordinator. As the right-turn lane at the traffic lights ahead is closed, if the driver misses the intersection of Woody Park, please go straight at the traffic lights, turn around ahead and turn left back to Wang Hu Road. Vehicles from Wang Ge Road to Shuilian Road can use the opposite lane. Vehicles heading for Shuilian Road are not allowed to pass. Don't go backwards in the shops along the line and the vehicles in Tsinghua Jubei Gate. You can bypass Gedi Community Park at the left 100 meter intersection.
Phase II: Temporary closure of half lane of Wang Ge Road (Shuilian Road to Gefang). The closing time is from April 2020 15 to May 2020 15.
Bypass scheme: vehicles from Clang road to Shuilian road pass normally, while vehicles from Shuilian road to Clang road do not pass. Don't go backwards in the shops along the line and the vehicles in Tsinghua Jubei Gate. You can bypass Clang community park at the left 100 meter intersection.
The running time mentioned in the embodiment is the implementation time under normal circumstances. In case of severe weather such as typhoon and rainstorm, it will be temporarily adjusted (postponed), and then it will be notified separately by notice. Please understand the inconvenience caused by the project construction to residents and passing vehicles along the line.
Dongguan Cheng Nan major project construction office
April 7(th), 2020
For more information about local new cars, prices, car selection and travel information in Dongguan, please pay attention to "Dongguan Auto Market".
This article comes from car home, the author of the car manufacturer, and does not represent car home's position.
- Previous article:When is the car film better?
- Next article:Is the sudden auto-ignition on the streets of Hangzhou a device problem or a weather factor?
- Related articles
- Zhengzhou weather Xinxiang weather
- Weather on Duku Highway in August 12
- Gregorian calendar year 2023
- It is said that the shadow of the maid-in-waiting will appear on the wall of the Forbidden City when it thunders. Is it true?/You don't say.
- Wet weather, moldy clothes and bugs.
- What should I do if I don't adapt to the hot and humid weather in the south and grow acne on my face?
- Heroic deeds of ethnic minorities
- Why is slight cold a cold?
- Words describing particularly cold weather
- Weather, diet, living expenses and clothes in Shenyang