Traditional Culture Encyclopedia - Weather forecast - What technical measures should be taken in mass concrete construction in hot weather?
What technical measures should be taken in mass concrete construction in hot weather?
General building construction is mainly to find ways to reduce the hydration heat:
1, making a fuss about mixing ratio, using low hydration heat cement or reducing cement dosage: adding fly ash; Reduce the amount of cement; Add additives, etc.
2. Reduce the temperature of concrete, water and coarse and fine aggregate.
3, avoid high temperature section construction.
4. Inject cold water into the buried pipeline to cool down.
- Related articles
- Read the map, temperature curve and precipitation histogram in Beijing, and answer the following questions: The climate characteristics of Beijing are _ _ _ _ _ _ in winter and _ _ _ _ _ _ in summer.
- Where is the best place to travel in March?
- How can I run in this sultry weather?
- How to judge whether there is moisture in your body?
- How to download the weather that comes with glory
- What food does Wuxi eat on the solstice in winter?
- In which months are the roads icy in Seda?
- How to dress for a trip to Europe in early September?
- Qiqihar University Winter Vacation Time 2023
- Introduction Manuscript of Foshan Tourist Attractions Foshan Beauty Manuscript