Traditional Culture Encyclopedia - Weather forecast - Summer precautions for special hanging baskets and material machine equipment
Summer precautions for special hanging baskets and material machine equipment
Hello, here are the answers for you: Safety precautions for hanging basket operations (key selections) (1) The construction unit of the hanging basket scaffolding project must prepare a special safety construction plan before construction. (2) The hanging basket for high-altitude operations should be equipped with safety ropes and safety locks dedicated to hanging safety belts for workers. The safety rope should be fixed at a reliable location in the building and must not be connected to any part of the hanging basket. The specifications of the safety rope and the safety lock should be consistent. The safety rope should not be loose, broken, or knotted. The accessories of the safety lock It should be intact and complete, and the specifications and direction markings should be clear and legible. (3) The limit device and safety lock of the hanging basket must be sensitive and reliable. (4) There should be no more than 2 workers in the hanging basket. (5) When the hanging basket is working normally, personnel should enter the hanging basket from the ground and are not allowed to enter or exit the hanging basket from the top of the building, windows, etc. or other holes. (6) Workers in the hanging basket should wear safety helmets and seat belts, and the safety locks should be correctly hung on independently set safety ropes. (7) The load balance in the hanging basket platform should be maintained and overloading is not allowed. (8) When hanging basket equipment failures and safety hazards are discovered during construction, they should be eliminated in time. If personal safety may be endangered, the operation should be stopped and repairs should be carried out by professionals. The hanging basket after repair should be re-inspected and accepted before it can be used. (9) Do not leave the hanging basket in mid-air after get off work. The hanging basket should be placed on the ground. The main power supply should be cut off when personnel leave the hanging basket, perform maintenance on the hanging basket, or finish work every day, and all switches in the electrical cabinet should be placed in the off position and locked. (10) When the hanging basket construction encounters severe weather such as rain, snow, heavy fog, wind and sand, and strong winds above level 5, the operation should be stopped, the hanging basket platform should be parked on the ground, and the wire ropes and cables should be tied and fixed.
Hope this helps and wish you a happy life!
- Previous article:Cixi weather forecast
- Next article:Conan diversity
- Related articles
- The weather is getting colder, so we should prevent bitter cold and spicy foods, such as crabs and persimmons, and eat more warm and nourishing foods?
- The color of the character _ 600 words of composition describing the character
- What are the customs for Wenzhou people to celebrate the Mid-Autumn Festival?
- Yinchuan tourist attractions must go for two days.
- What's the climate like in Singapore?
- Fireworks show time in Shanghai Disneyland
- Ask a friend who uses ink weather, what is the weather quality index inside? For example, pm2.5 is 142, which is a quantitative understanding?
- What should I do if the weather forecast on my mobile phone remains unchanged?
- The meaning of the twenty-four solar terms!
- On the sad connotation of the graduation season in June, there is no need to skip classes because there is no class.