Summary of monthly work of safety production in construction engineering

A period of work ended before you knew it. After this period of hard work, we have made greater progress in our continuous growth. Let's sum up our past achievements into a work summary. Are you still worried about writing a work summary? The following is my summary of the work of construction safety production month. Welcome to reading. I hope you will like it.

Monthly Work Summary of Safety Production in Construction Engineering 1 Since I participated in the study of blasting practice, I have basically mastered the technical essentials of blasting through two years of on-site practice and theoretical study. The follow are my views on that work in this industry:

A, roadway excavation

1, the blasting effect directly affects the progress of excavation, rock loading, support and other work, so the blasting technology is continuously improved to improve the driving speed and operation safety.

① The excavation section conforms to the actual requirements, and the surrounding walls are smooth, so as to minimize the damage to the original rock.

(2) The blast hole utilization rate is high, which increases the footage of each driving cycle and reduces the labor intensity.

(3) The size of blasting stones is uniform, and the blasting piles are concentrated, thus improving the rock loading efficiency.

④ Less consumption of raw materials and low cost.

2. According to the rock properties and geological structure of roadway section, there are many kinds of cut holes. To sum up, it can be divided into two categories: oblique cutting and vertical cutting, and there are also mixed cutting combining the two. ? Oblique cutting: it is characterized by the oblique intersection of the cut hole and the free surface. When the explosive in the cut hole is detonated, the rock from the bottom of the hole to the free surface is broken and thrown.

Vertical eye cutting:

All cut holes are parallel to each other and perpendicular to the working face. Cut hole is divided into empty hole and charging hole, and empty hole provides free surface and compensation space for charging hole. This cutting method is easy to drill, and the depth of the cutting hole is not limited by the cross section of the roadway, which is convenient for deep hole blasting.

Second, the safety requirements of blasting operation in roadway excavation

1, two lanes are driven relatively. When the working faces are 15m apart, the geological surveyors should give a notice first, and then only one working face is allowed to move forward, and a warning will be given to the safe place where the working faces on both sides are facing. The operators of both sides can not detonate until they evacuate to a safe place.

2, parallel roadway excavation, one of the working face blasting, and its adjacent working face 20m apart should stop working, all personnel should be evacuated from a safe place.

3, single-headed roadway drivage face blasting, must keep the smooth between working face and fresh air roadway. After blasting, personnel must spray water on the blasting pile and fully ventilate it before entering the work.

4, in the coal dust and gas environment tunneling, charging blasting money and after blasting must check the gas concentration within 20m from the blasting site, when the gas concentration reaches or exceeds 65438 plus or minus 0%, charging blasting is prohibited.

5, coal mine explosion-proof detonator must be used in underground blasting.

6. For underground blasting in coal mines, the charging and filling quality of the blasthole must meet the following requirements: the depth of the blasthole should not be less than 0.65m; when blasting in rock stratum, the charging length should not exceed half of the depth; when the depth of the blasthole is more than 0.9m, the charging length should not exceed two thirds of the length of the blasthole, and the rest should be filled with filler; When blasting in coal seam, the filling length should be at least half of the hole depth.

Three. Warehouse management of initiating explosive device

1, mixing of incompatible substances is prohibited. When storing more than two kinds of blasting equipment in the warehouse, it must comply with the regulations. Sundries unrelated to blasting equipment shall not be piled together.

2, keep the warehouse temperature shall not exceed normal temperature explosives warehouse should be kept dry and well ventilated, should be equipped with a thermometer. The warehouse should be ventilated frequently, especially when the temperature inside the warehouse is higher than that outside the warehouse. When the temperature outside the warehouse is higher than that inside the warehouse, ventilation can only be carried out when the relative humidity outside the warehouse is lower than the moisture absorption point of ammonium nitrate. It is very important to keep the warehouse dry and the temperature below 35 degrees.

3. The lighting, communication and lightning protection devices in the warehouse can't be equipped with telephones, only the direct dial telephones of the unit security department and the fire department are provided, and the connection between warehouses is lighting and sound.

4. There must be enough fire fighting equipment and water in the reservoir area.

Fourth, the responsibilities of the blaster

1. The blasting equipment received by the blaster shall not be lost or given to others, and shall not be destroyed or used for other purposes without authorization.

2. Carry out blasting operation according to the blasting instruction sheet and the blasting design regulations.

3, strictly abide by the blasting safety regulations and safety operation procedures.

4. After the blasting, all the remaining blasting equipment shall be delivered to the warehouse in time and registered for the record.

5. Participate in the destruction of expired and deteriorated blasting equipment. The above are the insights and understandings I have learned in the past two years. The knowledge learned in a short time is limited. I look forward to improving my blasting skills in this blasting training and effectively applying the learned blasting knowledge to practical work.

Monthly work summary of construction project safety production 2 1, safety management objectives

Over the past six months, our company has undertaken the waterway construction of Wujiang (Wujiangdu-Gongtan) shipping construction project. There is no personal death, fire, mechanical equipment damage, traffic accident and environmental pollution accident in the construction stage. The annual industrial injury rate is 0, the serious injury rate is 0, and the civilized construction rate is qualified.

2, the implementation of the safety responsibility system

Since the start of construction, the project management department has organized the site leaders, safety officers and team leaders of various projects to arrange and arrange the requirements for strengthening the management, maintenance and operation of construction machinery:

(1) Maintain the construction machinery in strict accordance with the equipment regular maintenance schedule, fill in the mechanical lubrication schedule carefully, and record the oiler and time in detail.

(2) Strictly implement the "mechanical management system". The driver must operate in accordance with the operating rules and performance table, play an important role in whistling command, and make clear and accurate gestures.

(3) The driver must fill in the work record and operation record every month.

(4) The site must be inspected every month, and the monthly checklist and feedback sheet should be filled in.

(5) The maintenance personnel must handle the operation ticket when carrying out maintenance, and all participants can only carry out maintenance after signing.

(6) The disassembly and assembly of large machinery must have work instructions, which can be implemented only after being approved by the project department. In the process of construction, the construction should be carried out in strict accordance with the relevant provisions of the work instruction.

3. Safety training and education

From the first day the construction workers entered the site, we studied and tested the safety laws and regulations and the safety production law for all the workers. Carry out three-level safety education for new employees, and they can only take up their posts after passing the examination. In this bid section, all the projects are in a wrong way, such as Jiangkou Beach, Fish Front Plate Beach and Pig pen Beach. The cumulative number of trainees is about 100.

4. Inspection of large machinery

Mechanical inspection shall be conducted at each construction site by the project department manager and safety director, * * * 12 times, 3 times at each project site. Find out and rectify 20 hidden dangers.

5. Development of safety activities

In the "Safety Month" activities, the flag-raising ceremony and large-scale employee signature activities with the theme of "Safety responsibility is more important than Mount Tai" were organized. Organize special safety education for construction personnel on the site of each project. In the 100-day safety and accident-free activities, the leading group of 100-day safety and accident-free activities with the project manager as the team leader was first established. A 100-day accident-free safety activity plan was formulated and a 100-day accident-free safety activity mobilization meeting was held. The person in charge of each construction site leads all construction personnel to seriously study relevant safety documents, and organizes safety knowledge lectures attended by the person in charge of each construction site, team leader and construction personnel. Training on the legal knowledge of safety production for the construction personnel on the site of each project requires the trainees to seriously study the laws of safety production, know how to use legal rights to safeguard their own interests, enhance the legal awareness of safety production, and turn legal requirements into our conscious actions.

Each project site should establish and improve the safety account. Safety account is the window of safe and civilized construction and a comprehensive system of civilized construction. By recording the account, you can check and record the safety and civilized work.

6, civilized construction situation

Since the start of construction, the project department has taken safe and civilized construction as the basis of all work, adhered to the safety production policy of "safety first, prevention first", always focused on safety management, ensured the smooth progress of construction production, made efforts to eliminate habitual illegal behaviors and uncivilized construction behaviors, and pushed the safety management work from the traditional extensive safety management behavior to scientific and standardized. Conduct safety knowledge education for new construction personnel entering the construction site, and conduct safety examinations. Only after passing the examinations can they enter the construction site. Handle the operation ticket for each overhaul to ensure that the work is finished, the materials are used up and the site is cleaned up. By using the safety study time every Saturday, we systematically learn the relevant knowledge of national security and civilized construction, so that the safety awareness of construction workers has been improved to varying degrees, and the awareness of "I want to be safe" to "I will be safe" has been highly sublimated.

We adhere to the people-oriented principle, take active preventive measures to ensure that the safety awareness of all employees is gradually improved, and use various media to cultivate employees, so that every employee will not forget safety and cherish life. Through the above work, all the machinery on the construction site is effectively controlled to ensure the safe and efficient operation of mechanical equipment and meet the construction needs.

7. The project is in the completion stage.

Mechanical equipment, construction personnel exit, the construction site to keep all safety signs, safety warning signs in good condition without damage. After the project intends to handover and acceptance, the project intends to exit.

Work plan for construction safety of other projects in the second half of the year:

1. Our company will continue to maintain and improve the status quo of safe and civilized construction in various construction sites, adhere to the guiding ideology of "people-oriented, safety first", give full play to the subjective initiative of employees, change ideas and improve the management level of safe and civilized construction.

Second, new employees entering the construction site should learn safety rules and regulations, safety production law and three-level safety education. Every employee who enters the construction site should establish the belief of winning glory for the company, and firmly believe that I am with the enterprise and the enterprise develops with me.

Third, further improve the level of safe and civilized construction.

1, increase the inspection and use of personal protective equipment.

2. Inspect all the equipment, and the unqualified ones are forbidden to enter the construction site.

3, further implement the national "production safety law", strengthen safety training, improve the safety awareness and skills of personnel; Strengthen the inspection and implementation of on-site safety measures, especially the safety management in the process of mechanical disassembly and assembly, and increase the punishment for habitual violations. Put the prevention of personal accidents in the first place, and there can be no mistakes.

4. Intensify the publicity and implementation of "Three Standards in One", comprehensively carry out the certification of "Safety Production and Health Environment Management System", and comprehensively improve the safety management level of the company through safety standardization management.

5. Further strengthen safety management to ensure the safe and continuous operation of machinery. The company should always organize personnel to carry out mechanical safety inspection to eliminate mechanical hidden dangers in the bud.

6, strengthen the safety and civilized construction, each project must have measures and disclosure before construction. According to the operating rules, ticket repair, material use-up and site cleaning must be completed. In the previous safety and civilized construction inspections organized by the project department, the operation records, maintenance records, work records and monthly inspection records of large machinery are complete, and the machinery at each project site can run continuously, without affecting the progress of the project due to machinery, and without a mechanical and personnel casualty accident.

This achievement was achieved with the strong support of company leaders and the efforts of all employees. At the same time, we are also clearly aware that there is still a certain gap with the requirements of superior leaders. We will continue to adhere to the "people-oriented, safety first" safety management concept, expand our thinking, and strive to improve the company's skills in the management and operation of large machinery.

Summary of monthly work of safety production in construction engineering III. 1. Achieve the goal of safe production management:

1, "Safe Site" passed the examination.

2. The annual serious injury rate is controlled at 0‰, and the annual mortality rate is controlled at 0‰.

Second, pay attention to practical results and strengthen safety education:

People are the first factor, so it is necessary to further strengthen safety education, regard safety education as a persistent event, cultivate employees' awareness of law-abiding, self-protection and overall situation, and further improve employees' safety technical level and management level. Carry out various, colorful and wide-ranging safety publicity and education activities, so as to achieve practical results, do not go through the motions, make safety work deeply rooted in the hearts of the people, and lay the foundation for the smooth implementation of the project from the quality of personnel.

Third, strengthen the identification of major hazard sources and the management of machine control:

According to the characteristics of this project, geological features, local climate, surrounding environment and other specific conditions, as well as the scope and progress of construction undertaken, the project department will list blasting engineering, high slope engineering, foundation excavation engineering, bridge engineering (especially Gao Qiao, long-span, deep-water and complex bridge engineering), scaffolding engineering, hoisting engineering and crossing engineering with railways and highways as major hazards for the construction safety of this project. The project department shall publicize the major construction safety hazards of this project in a prominent position on the construction site, and the publicity content shall include the list of major construction safety hazards, possible accident categories, matters needing attention and safeguard measures. Hang warning signs in the eye-catching position of each major hazard source for construction safety.

Four, strict assessment of production safety responsibility system at all levels

Implement the Law of People's Republic of China (PRC) on Safety in Production, improve the formulation of the responsibility system for safety in production, fully implement the responsibility system for safety in production, and sign the responsibility book for safety in production at different levels. At the same time, combined with the actual situation, formulate targeted implementation rules, refine and quantify the safety objectives and responsibilities layer by layer, and implement them to various functional departments, project departments, teams and groups, important positions and individuals with special positions. Adhere to the principle of "safety must be managed in production", hold regular safety meetings, organize safety inspections, listen to safety production reports, ensure the investment of special funds for safety, and achieve "five simultaneities" between safety work and production tasks.

Verb (abbreviation of verb) has passed the evaluation of "safe construction site" and improved the safety management system under the guidance of experts;

1. Earnestly implement the new national safety regulations and policies, improve and standardize various safety rules and regulations under the guidance of experts of the "safety site" assessment team, make the safety work legal and well-founded, adjust the safety management focus according to the construction progress, set up a safety leading group with the project manager as the team leader and the heads of various departments as members, actively meet the safety inspection work of superiors, sum up the shortcomings in various safety work, and actively improve.

2, according to the contract documents to improve the security personnel, strengthen professional learning and training, and gradually improve the professional ability of security personnel, improve the quality of security personnel.

3, resolutely implement the leadership shift system for accident hidden danger rectification. Management shall be carried out step by step, and the leaders in charge shall be responsible for the hidden dangers of accidents on the construction site, and the rectification shall be implemented within a time limit.

6. Hold a safety production meeting on time.

Hold regular safety production meetings at least once a month, conduct safety inspections at least once a quarter, conduct comprehensive safety appraisal, clarify rewards and punishments, and pay attention to practical results to promote safety work. Punish the managers and constructors who have weak safety awareness and do not pay attention to safety work, so as to ensure the normal operation of the safety management system.

Seven, increase safety education and training and safety publicity offensive:

1, pay attention to safety training and education, organize safety training and education activities, organize managers and construction personnel to conduct written study, project safety study, safety knowledge contest and other activities to enrich safety work and better achieve the effect of safety publicity.

2. Strengthen the inspection and management of the training, evidence collection and review of special operations personnel, and organize special operations personnel to be trained with certificates in batches at regular intervals. It is strictly forbidden to work without a license.

3. During the contract period, billboards, slogans and other forms of safety education are widely used, and various publicity and education are carried out in depth. All kinds of workers are regularly organized for safety knowledge training, and the publicity and training records are archived in the form of pictures or written materials.

4. Conduct "three-level" safety education for new construction personnel. Educational forms should be diverse and practical, and educational records should be kept well. Those who pass the examination are allowed to take up their posts, and the academic qualification rate should reach 100%.

5. Organize full-time safety management personnel and construction team safety officers to learn "People's Republic of China (PRC) Safety Production Law" and "Regulations on Safety Production Management of Construction Projects" to enhance the legal concept of safety management and improve safety professional knowledge.

6. Organize full-time safety management personnel and construction safety officers to visit good safety management experience, and standardize on-site safety protection based on safety standardization.

Eight, strengthen safety inspection, strict rewards and punishment:

Strictly implement the "safety inspection" system. Take a combination of regular inspection and spot check to implement dynamic management. Strengthen hidden dangers rectification and follow-up feedback, and rectify the hidden dangers found according to the principle of "three determinations". Those who fail to pass the re-inspection or two inspections will be punished according to relevant documents, and the relevant personnel will be investigated for responsibility, and forced to stop work and rectify until they are qualified. In the safety inspection of the superior department, the rectification instruction was issued, and the relevant construction teams and departments were fined 3000-5000 yuan if the rectification was not carried out on schedule or the inspection was unqualified; Those who are ordered to stop work for rectification shall be fined more than 10000 yuan to the relevant construction teams and departments, and shall be ordered to punish the relevant personnel according to regulations after rectification as scheduled; The penalty will be doubled for the items notified by the superior.

Nine, safety protection supplies and facilities management:

1, implement the access system for safety protection articles and facilities. All safety protection articles and facilities entering the construction site of our contract section, including safety nets, safety belts, helmets, cables, iron case switch boxes, leakage protectors, etc., must be qualified products that meet relevant national norms and standards.

2. Do a good job in equipment management, acceptance, regular inspection and maintenance. Large and small mechanical equipment entering the construction site shall be subject to the acceptance system. Prohibit unqualified machinery, form the habit of regularly checking construction equipment, do a good job in maintenance and repair of machinery and equipment, and prevent mechanical injuries and casualties.

X. Improve the emergency rescue plan:

1. According to the Law of People's Republic of China (PRC) on Safety in Production, the production and business activities of the construction unit are highly dangerous, and emergency rescue organizations must be established. The emergency rescue organization is an organization specialized in emergency rescue work within the contract period. Once a production safety accident occurs, emergency rescue organizations can quickly and effectively put into rescue work to prevent the accident from further expanding and minimize casualties and property losses.

2. Set up a leading group for emergency treatment of major safety accidents, which is responsible for coordinating and organizing personnel to enter the site in time to deal with accidents, control the development of the situation, and minimize personal injury and property losses. The contract section will further improve various emergency rescue plans.

3 timely improve the emergency plan and emergency rescue plan, organize publicity and emergency drills, and reserve emergency relief materials.

4. The Bao Tong team of the Project Department continues to be responsible for the maintenance of the construction access road, leveling the sections with large slope of the construction access road, replacing the flaky on the weak sections, and reinforcing the collapsed sections to ensure smooth material supply and traffic safety.

Eleven, production safety management fees should be earmarked:

Conscientiously implement the provisions of the state on safety production management fees and the provisions and requirements in the headquarters documents, strictly review the scope of use of safety production management fees, rationally use safety production management fees, and effectively use special funds for special purposes, improve the working environment of operators, and avoid safety accidents.

Summary of monthly work on safety in production of construction projects 4. In the flood season this year, the total rainfall in our region was 484 mm, which withstood the severe tests of 7 rainstorms with rainfall exceeding 30 mm in 12 hours, yellow rainstorm warning in 19 times, 25 severe convective weather warning and typhoon edge effect. Under the correct leadership of the district committee and the district government, under the unified deployment of the municipal flood control headquarters, and with the joint efforts of all flood control member units and all flood control cadres in the whole region, our region has safely passed this year's flood season, successfully completed the task of fighting various natural disasters caused by meteorological reasons, and better defended the achievements of economic construction in our region and the safety of people's lives and property. The following is a brief summary of flood control work in our region this year.

First, the main characteristics of flood season in our region this year

Compared with previous years, there have been many new situations and problems in flood control in this year's flood season: First, last year and the year before last, our region was not affected by major meteorological disasters for two consecutive years, and the people's awareness of prevention was relatively lax, and various safety hazards in flood control and typhoon prevention were not easily exposed; Second, this year, large-scale municipal engineering construction projects in our district started relatively intensively, involving a wide range, such as Zhonghuan Road, Changning Road-Beizhai Road, the west extension of Metro Line 2, and the Northern Airport Economic Park. Especially in the northern airport economic park, the municipal road works within 1.7 square kilometers have been fully rolled out, which has caused great pressure on flood control work in this area; Third, there are many short-term rainstorms caused by strong convective weather this year, and the impact of sudden disastrous weather on our region is more obvious. This year, our region suffered a tornado attack on July 12 and continuous thunderstorm weather on August 23 and September 1 2, which affected the normal life and production order of people in some areas of our region to some extent. It also makes the flood control and typhoon prevention work in our region face a severe test.

Second, the main work done this year.

(a), fully prepared, well prepared, and actively grasp the initiative of flood control work.

Under the leadership of the district party committee, the district government and the municipal flood control headquarters, the flood control headquarters of our district adheres to the idea of "safety first, being always ready", bases itself on preventing major flood disasters, and actively grasps the initiative of flood control and typhoon prevention by grasping the implementation of various flood control measures.

1, be fully prepared. As soon as the flood season ended last year, the district flood control headquarters began to carefully plan and deploy this year's flood control work. First of all, the flood control work last year was carefully summarized, especially the outstanding problems and weak links exposed in flood control and emergency rescue last year were studied, and the corresponding improvement measures and countermeasures were formulated. In order to adapt to the new situation that may occur after the implementation of the Flood Control Regulations and improve the level of flood control work in our region according to law, the flood control headquarters of our region held a special training course on learning the Shanghai Flood Control Regulations in June 2008+last year 10, and leaders and cadres of flood control member units in the whole region participated in the training. At the beginning of the year, the district flood control headquarters issued a special notice, requiring all units to seriously formulate this year's flood control work plan, implement the flood control and typhoon prevention plan, and then arrange pre-flood safety inspections to investigate hidden dangers and weak links. On the eve of the flood season, a mobilization meeting for flood control and typhoon prevention in the whole region was held. During the flood season, we will continue to carry out safety inspections for flood control and typhoon prevention, organize "pump-pipe" linkage exchange activities in cities and districts, visit the downtown meteorological observatory, and hold flood control science knowledge training. This series of work makes the leaders of flood control member units and flood control cadres in our district always in a tense mental state. Make the flood control work in our region always be mentally prepared.

2. Be fully prepared for measures and actions.

First, earnestly implement the flood control responsibility system. This year, we further clarified that the chief executives of flood control member units in the whole region are the first responsible persons for flood control, and announced the list of the first responsible persons and the contact numbers of the units to the whole region through the news media;

Second, according to the new situation and new problems, seriously revise the flood control and typhoon prevention plans of district and district flood control member units to make the plans more reasonable, operable and more in line with actual combat requirements;

The third is to implement all kinds of emergency materials for flood control and typhoon prevention, and conduct repeated inspections and key inspections on emergency material reserves to ensure that the material reserves are sufficient, complete and in place;

The fourth is to further strengthen and standardize the flood control duty system at all levels. The duty plan has been formulated in the headquarters of the District Flood Control Office, and all flood control member units are not less than 2 people on duty normally, and the total number of intensive classes is not less than 4 people. It is also stipulated that all flood control member units must be on duty when the weather forecast has rainstorm or strong convection warning.

Fifth, check all flood control facilities regularly to ensure that they are in good condition, especially some small closed facilities used in areas prone to water accumulation, which have played a more effective role in this year's flood season because of better management;

Sixth, special equipment and equipment for flood control and emergency rescue have been updated and increased. This year, our district newly purchased chainsaws, transport vehicles and overhauled truck cranes for the greening emergency department, which effectively enhanced the greening emergency rescue capability;

Seventh, repeatedly check and dredge urban drainage pipelines. From the flood season last year to March this year, the drainage pipe dredging rate of small and medium-sized cities in our region reached more than 120%, effectively ensuring that the urban drainage pipe network in our region was in a good and smooth state;

Eighth, regularly clear and dredge the entrance and exit of river sluice. Before the end of April this year, the inlet and outlet of the 15 drainage pumping station in our district will be dredged to ensure the flood discharge capacity of the river;

Nine is to strengthen all kinds of dangerous houses and focus on monitoring;

Tenth, thinning, binding and strengthening street trees and trees in residential areas. In addition, our region has also taken key preventive measures for key flood control areas and weak links in the region. For example, the District Flood Control Office took the lead in conducting a special investigation on flood control safety measures in the Airport Economic Park, and adopted flood control measures such as building new temporary drainage pumping stations, adjusting the water system of the park and building some backbone drainage pipes before the flood season.

(two), to rescue, to ensure that the impact of the disaster is reduced to a minimum.

This year, due to strong convective weather and sudden meteorological disasters, our region has also been hit by tornadoes and many sudden concentrated heavy rainfall. In the face of sudden disasters, our district started the plan in time, and the whole region went all out to effectively resist and reduce the losses caused by disasters.

On July 12, a rare tornado hit Xinjing Town and Beixinjing area in our district, causing hundreds of square meters of simple sheds to collapse, thousands of square meters of roofs of various houses and factories to be overturned, and more than a dozen telephone poles to be scraped off, resulting in one death and one serious injury, and a large-scale power outage in the area. After the disaster occurred, leaders at all levels, such as district party secretary, district head and district flood control headquarters, quickly rushed to the scene, launched emergency plans, set up temporary emergency rescue and relief headquarters, and carried out emergency rescue and relief in an orderly manner. First of all, the affected people were transferred in the shortest time, so that the disaster situation was quickly controlled, the mood of the people was stabilized, and the power supply was quickly restored. Due to quick action, effective measures and proper deployment, the losses caused by the disaster were effectively reduced and the disaster situation was quickly restored.

August 23rd and September 1 are two severe thunderstorms with the largest and most concentrated rainfall in flood season this year in our region. Because the urban drainage system of Hongsong South Block and Beihong South Block in our district has not been established, two heavy rains have far exceeded the existing drainage capacity of these two areas, resulting in large-scale paralysis of residential areas and roads. The district flood control headquarters, the streets, towns and property management departments under their jurisdiction quickly mobilized all forces to take various measures, and Qi Xin made concerted efforts to grab and drain stagnant water. Cadres and workers of flood control management departments at all levels think what the masses think and are anxious about what the masses are anxious about. They always adhere to the front-line command, so that the water does not retreat and people do not withdraw, sum up experience in time, constantly improve measures, improve drainage efficiency, effectively shorten the time of water withdrawal, and fully reflect the sense of responsibility to the party and the people.

The lodging of trees this year has also had a great impact on flood control work in our region. What is more prominent is that in August, affected by typhoons Dandelion and Yunna, continuous rainfall and strong winds caused street trees and big trees in residential areas in many areas of our district to fall down, some of which broke wires and some crushed houses, which may endanger road traffic safety and people's lives and property safety at any time. Hearing the alarm, the green rescue department tried every means to overcome the difficulties brought by centralized rescue, such as shortage of manpower, tight time and lagging equipment. Under the reasonable dispatch of the district flood control headquarters, we persist in carrying forward the spirit of continuous fighting, not afraid of fatigue and danger, and eliminate dangers for the citizens day and night, effectively ensuring the safety of the city. In addition, in order to meet the typhoon "Yunna" No.1 14 this year, two deputy heads of our district led a team to take command of the front line, and more than 700 flood control cadres and rescue personnel in the whole district were ready. There are many similar examples.

Third, there are problems.

1. At present, there are still urban drainage system providers in Hongsong South Block, Beihong South Block and Kong Lin Park within the outer ring of our district, and the urban drainage system is still not perfect. Especially in the southern part of Hong Song, many municipal facilities have not been handed over to the municipal administration department, resulting in a disconnect in management.

2. The flood control cadres of a few units have not paid enough attention to it ideologically. In practical work, there is an idea that prevention is neglected in actual combat, and the usual prevention work is not deep enough and tight enough.

3 individual units of flood control personnel on duty are still free to leave.

Fourth, the work plan after the flood season

The flood control headquarters of our region will take advantage of the post-flood season to actively carry out investigation and research, actively implement the idea that the flood control work put forward by the municipal flood control headquarters should strive to realize three changes, and actively explore new ideas, new methods and new measures for flood control work, so as to make the flood control work in our region play a more effective role in the new historical period and better serve the sustained and healthy economic and social development of our region.

The end of the flood season this year means the beginning of the flood control work in the new year. We should conscientiously sum up the experience of this year's flood control work, actively think about and plan next year's flood control work on the basis of earnestly summing up the experience and lessons of this year's work, and also grasp the flood control work early, realistically and well next year.