Traditional Culture Encyclopedia - Weather inquiry - Operation Arrangement of Rong Da Bus in Xindu District of Xingtai during Epidemic Prevention and Control

Operation Arrangement of Rong Da Bus in Xindu District of Xingtai during Epidemic Prevention and Control

65438+February 3 1 Notice on the resumption of operation of Rong Da bus branch line

According to the improvement of road conditions in western mountainous areas, the bus traffic conditions have been met, and the Rongda bus branch line will resume operation from today, as follows:

60 1 branch line:

Houaoyu-qu center hospital

Shishan district central hospital

Dazhaimen-passenger traffic management center

603 branch line:

Xihouyu-passenger traffic management center

604 branch line:

Zhongzhuang-passenger traffic management center

606 branch line:

Cuijiazhuang-passenger traffic management center

Dongzhaozhuang-passenger traffic management center

Announce the resumption of business

After the company's field road survey, some sections have met the traffic conditions, and the company decided to gradually restore the main line and continue to stop driving the branch line. The latest running route and time are as follows:

Highway 600:

The uplink time is 12:30, 14:00, 16:00.

The downlink time is 13:30, 14:30, 15:30.

60 1 road:

Uplink time 12:00- 16:00

Downlink time 12:00- 16:00

Road 602:

The uplink time is 12:30, 13:30, 14:30, 15:30, 16:00.

The downlink time is 12:30, 13:30, 14:30, 15:30, 16:00.

Road 603:

The uplink time is 12:00, 13:00, 14:00, 15:00, 15:30, 16:00.

The downlink time is 12:00, 13:00, 14:00, 15:00, 15:30, 16:00.

Road 604:

The uplink time is 12:30, 13:30, 14:30, 15:00, 15:30, 16:00.

The downlink time is 12:30, 13:30, 14:30, 15:00, 15:30, 16:00.

Road 605:

The uplink time is 12:00, 13:00, 14:00, 15:00, 15:30, 16:00.

The downlink time is 12:00, 13:00, 14:00, 15:00, 15:30, 16:00.

Road 606:

The uplink time is 12:30, 13:30, 14:30.

The downlink time is 14:00, 15:00, 16:00.

With the gradual improvement of road conditions, Rongda bus will resume normal operation after 8:30 tomorrow.

All-line power outage notice

Snow fell in the whole city, and snow and ice appeared in the western mountainous area of Xindu District due to snowfall. Due to road traffic conditions, in order to ensure the safety of passengers' lives and property, all bus lines in Rong Da were suspended today. After the weather improves and the road conditions reach the traffic conditions, the operation will be gradually resumed.

The latest changes of bus lines in Rong Da

1.322 The section from Xinghe Expressway to Xihuangcun Expressway of provincial highway has been released from traffic control and has traffic conditions. Let the bus leave tomorrow:

1, 603, 604 and 605 lines are restored to the original lines.

The fare is subject to the original standard.

2, 606 line to restore the original line, the end point back to the original end point.

Second, because 20 meters west of Dongjingzhuang Village broke off diplomatic relations with the Chuankou Reservoir section, there is no traffic condition; Let the bus leave tomorrow:

1, Hou 'aoyu-Yurang Bridge, Xiang Xing Guzhen-Yurang Bridge, 60 1 Two branch lines bypass Maha and Xihuangcun to Yurang Bridge.

Line 2.602 continues to bypass Hongxing Road, Constellation Road and Pang Hui Bridge to Kangda Road.

Notice on Adding Air Conditioning Fee to Passenger Cars in Rong Da in Winter

According to the relevant regulations of the Price Bureau, air conditioning is started from the 7 main lines of 12, 60 1, 602, 603, 604, 605, 606 * * and other branch lines of Rongda Bus in Xindu District, and the opening time of air conditioning for Rongda Bus in winter is 6544. When passengers take the bus, the fare increases by one yuan.

Note: passengers must wear masks all the time and do personal protection. Passengers need to scan the "boarding code" before boarding, and then scan the "boarding code" or register personal information after boarding.

165438+1notification on October 7th.

Today, it snowed all over the city. Snowfall in the western mountainous area of Xindu District leads to snow and ice in relevant sections. Due to the road traffic conditions, in order to ensure the safety of passengers' lives and property, the entire bus line in Rong Da was temporarily suspended. After the weather improves and the road conditions reach the traffic conditions, the operation will be gradually resumed.

10 year1notice on October 28th.

Rong bus will resume its departure time in winter tomorrow, and its operation time is as follows:

60 1 Road Xingtai-Baian runs every hour.

Uplink: first shift: 6:20, last shift: 17:30.

Downward: the first shift: 6:00, and the last shift: 17:00.

No.602 Xingtai-Jiulong Gorge runs every hour.

Up and down: the first shift: 6:20, the last shift: 17:00.

Train 603, Xingtai-Jiang Shui, runs every hour.

Up and down: the first shift: 6: 15 and the last shift: 17: 15.

No.604 Xingtai-Jijiacun runs every hour.

Up and down: the first shift: 6:30, the last shift: 17:00.

Xingtai-Mingshui No.606

Up and down: the first shift: 6:30, the last shift: 17:00.

At the same time, branches such as Dazhaimen, Dongzhaozhuang, Gangdi and Geliao were opened.

During the epidemic prevention and control, passengers must wear masks all the time. Before getting on the bus, please actively cooperate with the driver to measure his body temperature, scan the code to register his identity information, and issue the health code and boarding code.

65438+ Notice100 on October 24th.

At present, the epidemic prevention and control situation is grim. In order to reduce personnel flow and close contact, reduce the risk of epidemic spread, and ensure the safety of people's travel, the operating frequency of Rong Da bus was reduced from 202 1 to 10.

The specific operating hours are as follows:

Image source WeChat official account: Rong Da Bus in Xindu District

Note: The departure time will be adjusted at any time according to different passenger flows.

During the epidemic prevention and control, passengers must wear masks all the time. Before getting on the bus, please actively cooperate with the driver to measure his body temperature, scan the code to register his identity information, and issue the health code and boarding code.

Tel: 298111298115.