Traditional Culture Encyclopedia - Weather inquiry - What should I do if I stick a veneer on the concrete?
What should I do if I stick a veneer on the concrete?
The formwork of the building was dismantled too early, and the concrete has not completely solidified; Or dismantle the formwork too late, resulting in the concrete sticking to the stubble or damage on the formwork.
Treatment method of sticking wood veneer on concrete;
(1) Control the form removal time after concrete pouring. Generally, it is not a large-volume or long-span beam structure. In the current weather, the form removal will be carried out after 24 hours, and the mass concrete will be 72 hours.
(2) It is forbidden to use old templates and replace new templates. It is recommended to use 8mm- 15mm bamboo veneer. If you use an old template, you can repair the damaged part of the template.
(3) Before the next use, clean the concrete residue on the used template, and brush a layer of release agent before each use of the template.
- Previous article:How to treat toothache? _ toothache
- Next article:What weather do different sunsets represent?
- Related articles
- What are the specialties in Hanshou County?
- Mount Tai is the best place to watch the sunrise.
- Carp like to fish in low light weather and strong light in summer. When is the best time to go out?
- Xiamen tourist routes
- Words to recite after graduating from the sixth grade of primary school
- When is it easy to get a driver's license?
- Baby just full moon soon, the home is too hot, what should I do if I have a heat rash?
- Will plum blossoms freeze to death outdoors in winter?
- What should I pay attention to when I go to South Africa in April? What should I prepare?
- Weather phenomenon intelligent observer =7 Error in uploading ftp.