Traditional Culture Encyclopedia - Weather inquiry - Dust control work plan

Dust control work plan

Work Plan for Dust Control 1 I. Work Objectives

By carrying out special treatment, we will seriously investigate and deal with illegal activities that pollute the environment, effectively solve the outstanding problem of dust in housing municipal engineering construction, and improve the standardization level of building construction; Establish a long-term mechanism to control construction dust, improve the ability and level of urban management, and effectively curb the impact of construction dust on urban air quality.

Second, the organization guarantee

In order to effectively strengthen the leadership of the special treatment of building dust, the District Urban and Rural Construction Committee set up a leading group for the special treatment of building dust. The leader in charge of the Committee is the leader of the leading group, and the relevant responsible persons of the construction management department and the district safety supervision station are members of the leading group. The office of the leading group is located in the district safety supervision station, which is specifically responsible for the special control of construction dust.

Third, the timing.

(1) Deployment stage (before April 20th).

According to the actual work, the District Safety Supervision Station and the relevant units will arrange and deploy the construction dust control work in the whole region, draw up the municipal housing projects in the whole region, and establish the project list (see Annex 2) and account (see Annex 3) to ensure full coverage and no omissions.

(2) Implementation stage (April 2 1 to June165438+1October 30).

Safety supervision stations in all districts shall, in accordance with the requirements of this plan, comprehensively carry out dust control in construction, establish and improve the information reporting system, and submit the work progress to the Municipal Urban and Rural Construction Committee before the end of each month (see Annex 1).

(3) Summary stage (65438+February 1 to 65438+February 3 1).

The district safety supervision station shall summarize and analyze the development of special dust control work in construction, conscientiously sum up the experience and effect of dust control in construction, study and put forward effective dust control measures and suggestions, and timely submit them to the Municipal Urban and Rural Construction Committee as required.

Fourth, the main measures

District safety supervision stations and relevant units shall, in accordance with the principle of "prevention first and comprehensive treatment", take practical and effective measures according to the division of responsibilities and the actual work, improve the supervision and management mechanism, and do a good job in the control of construction dust.

(a) to supervise the implementation of the main responsibilities of all parties in the project construction.

1, the main responsibility of the construction unit. The construction unit shall take the overall responsibility for dust control in construction, incorporate the dust control cost into the project cost, specify the relevant contents in the project contract, and pay it in full and on time.

2, the main responsibility of the construction unit. The construction unit shall establish a responsibility system for construction dust control, prepare a special plan for dust control, and strictly implement it. The construction unit shall publicize the information of dust control measures, responsible persons and competent departments at the construction site, and submit the implementation of construction dust control measures to the district safety supervision station in a timely manner.

3, the main responsibility of the muck transport unit. The muck transport unit shall establish a management system and relevant measures for the prevention and control of dust pollution caused by the transportation of engineering muck (construction waste), use vehicles that meet the requirements, and strengthen the management of vehicles and personnel.

(two) to supervise the implementation of dust control measures on the construction site

According to the Measures for the Prevention and Control of Dust Pollution in the Main Urban Area of Chongqing (Decree No.272 of the Municipal Government), the Implementation Opinions on the Prevention and Control of Dust and Noise Pollution in the Construction of Housing Construction and Municipal Infrastructure Projects in Chongqing (Yu Jianfa [2014] No.64) and the relevant standards, specifications and documents for the prevention and control of dust pollution in construction, ten mandatory provisions for the prevention and control of dust pollution are fully implemented, such as "totally enclosed construction, ground hardening and vehicle washing"

1. After the district government releases the air pollution warning information, the district safety supervision station, relevant units and projects under construction should respond quickly and take immediate measures to strengthen dust control and dust reduction.

2. During the early warning of air pollution, it is suggested that the projects under construction that lead to dust pollution should be stopped actively; For key projects that cannot be stopped temporarily due to technical continuity or other special reasons, the "Ten Mandatory Measures" for the prevention and control of construction dust pollution should be strictly implemented.

3. The earthwork on the construction site should be piled up in a centralized way, and the bare site and earthwork should be piled up in a centralized way. The materials scattered in Jerry Liau, such as river sand, stone powder, cement, mortar and gypsum, etc. , stacked in the open air, covered with green dust-proof net, leaving no dead ends.

4, the construction site roads, mortar mixing places and earthwork excavation, blasting, demolition, cutting and other operations or processes that are easy to produce dust, water spraying measures must be taken or spray facilities set up.

5. Before leaving the site, the construction waste transport vehicles must be washed as required, especially the body, fender, chassis and other parts, and may not leave the site with mud.

6, the new project site roadway, high-rise building level protective shed set spray device; Set up a safe and beautiful dust-proof room in fixed workplaces such as mortar mixing station; Earthwork excavation and foundation pit engineering must be equipped with fog gun dust suppression equipment.

Verb (abbreviation for verb) job requirements

(1) attach great importance to it and make careful arrangements.

The safety supervision stations in all districts and relevant units should stand at the height of promoting the construction of ecological civilization, fully understand the importance and urgency of dust control in construction, make overall arrangements and implement the work.

(2) Widely publicize and raise awareness.

District safety supervision stations and relevant units should extensively carry out publicity and education activities on construction dust control in the construction industry, especially educate and train relevant personnel of construction, construction and supervision units, so that all parties in the project construction can fully understand the importance of prevention and control of construction dust pollution, effectively enhance self-discipline awareness and take the initiative to do a good job in dust prevention and control.

(3) Strengthen supervision and strictly enforce the law.

Safety supervision stations in all districts should comprehensively use daily inspections, random checks and other means to strengthen supervision and strictly enforce the law. If necessary, according to the Law on the Prevention and Control of Air Pollution, the penalty may be imposed continuously on a daily basis according to the original penalty amount from the day after being ordered to make corrections. At the same time, the construction site that produces dust pollution should be severely dealt with in combination with the enterprise's safety production license, integrity evaluation and evaluation.

(4) Improve the long-term mechanism.

Safety supervision stations in all districts should gradually establish a law enforcement linkage mechanism to ensure the normalization of dust control and supervision, take construction dust control as their daily work, and persist in it to further consolidate the control results.

(5) Strengthen information submission.

The district safety supervision station shall do a good job in submitting information, and submit the Statistical Table on the Progress of Special Dust Control on Construction Sites (Annex 1) to the Office of the Leading Group for Special Dust Control of Urban and Rural Construction Committee.

The second part of the dust control work plan implements the relevant deployment requirements of the state and the province on the prevention and control of air pollution, and further promotes the dust control work of housing construction and municipal engineering construction in our province. The following plans are specially formulated.

I. Guiding ideology

Focusing on the decision-making arrangements of the provincial party committee and the provincial government and the Ministry of Housing and Urban-Rural Development, in order to create a good living environment for the people, we will strengthen organizational leadership, enhance the sense of responsibility, strengthen management measures, and strive to solve the dust problem in construction projects.

Second, the focus of work

(a) to carry out the main responsibility of construction dust prevention and control.

1. According to the relevant regulations, the construction unit must fully calculate the safety and civilized construction measures (including dust control during construction) to ensure the implementation of dust control and safety and civilized construction measures by the construction unit.

2. The construction unit shall prepare a special plan for dust prevention and control on the construction site, submit it to the chief supervision engineer for review and signature, and implement dust prevention and control measures on the construction site according to the contracted scope. If the project is implemented by the general contractor, the general contractor shall implement the dust prevention measures at the construction site.

3. The supervision unit shall make good preparations for the construction site, urge the construction unit to strictly implement various dust prevention and emergency measures, and report relevant illegal acts to the housing construction department or the safety supervision institution in a timely manner.

(two) the implementation of construction dust control measures.

1. Measures such as dustproof facilities and devices shall be strictly implemented in the construction site. The housing construction site must be closed with the enclosure of the construction site, and the height of the main sections of the urban area is not less than 2.5 meters; The height of the site for general road sections shall not be less than1.8m. The fence shall be firm, stable, neat and beautiful. Car washing platform, sedimentation tank and vehicle cleaning facilities should be set up at the entrance of the enclosure, and transport vehicles must be desliming and cleaned before they can appear. Vehicles transporting earthwork and muck on the construction site must be closed or covered tightly. It is strictly forbidden to use transport vehicles such as muck that have not gone through the relevant formalities according to regulations, and it is strictly forbidden to throw or dump along the road at will. Encourage the construction site to install dustfall devices such as spraying or spraying on roads, fences and scaffolding; Encourage the installation of air quality detectors and other devices on the construction site.

2. Implement construction waste consumption control measures. The construction waste and domestic waste on the construction site should be stored in a closed garbage station and removed from the site in time. When cleaning up garbage on floors and scaffolding platforms, water should be sprayed to suppress dust, and sealed barrels or containers should be used for removal. It is forbidden to throw or burn all kinds of wastes into the air.

3. Strengthen the management of dust prevention and control in construction sites. The floors of main entrances and exits, main roads, material processing areas, stacking areas, living areas and office areas of the construction site should be hardened according to regulations, and other exposed sites should be covered, solidified, watered and afforested. Construction earthwork, engineering muck, etc. It shall be removed in time, and measures such as sealing dustproof net shall be taken for temporary centralized stacking on site. For the construction land that cannot be started temporarily, the construction unit shall cover the exposed ground. If it cannot be started for more than 3 months, it should be afforested, paved or covered.

4. Strictly manage the building materials on the construction site. Building materials, components and tools on the construction site shall be classified and packed neatly according to the general layout. For the pile of materials that are easy to produce dust, measures such as sprinkling water on time to suppress dust and covering those that cannot be sprinkled should be taken. Fine-grained building materials that are easy to fly, such as cement, should be stored in warehouses or closed containers or covered, and it is strictly forbidden to place them in the open air; Dust-proof measures should be taken during handling. The remaining materials are recovered in time.

5. Improve the prevention and control measures of earthwork excavation blasting. When removing buildings, structures, earthwork excavation, earthwork backfilling and other operations that are easy to produce dust, dust reduction measures such as enclosure isolation, spraying and spraying must be taken. In case of severe weather, such as wind power above level 5 or serious air pollution, it is forbidden to carry out earthwork excavation, earthwork backfilling, demolition and other operations that may produce dust.

6. Strengthen the prevention and control measures of municipal engineering dust. Municipal infrastructure projects should set fixed or movable enclosed enclosures and warning signs according to the site conditions, regularly sprinkle water to reduce dust, and regularly clean the drainage system. Construction mud should be stored in a closed container and not discharged into municipal pipelines. Construction vehicles should be equipped with washing equipment.

7. Strengthen the control of muck and urban construction waste transportation, ready-mixed concrete production and transportation. The mixing station should take measures such as covering, sealing, sprinkling water (spraying) and dust reduction. Effectively control dust pollution caused by stacking, loading and unloading, transportation and mixing. The production of mixing station should be closed and dust-proof measures should be taken. The entrance and exit of the mixing station should be equipped with a car washing platform and washing facilities. Concrete, muck and urban garbage transport vehicles shall take anti-leakage measures to avoid dripping, spilling and leakage during transportation.

(three) the implementation of construction dust prevention and emergency measures.

According to the early warning of heavy air pollution issued by the local government, emergency response measures will be fully implemented in the building construction and municipal engineering projects.

Three. job objective

Through centralized management, the dust pollution of housing construction and municipal engineering in the province will be fully controlled. At the end of 20 17, we will strive to achieve 100% dust control scheme, 100% basic dust control measures and 100% emergency response to dust control in severe weather such as air pollution.

Fourth, the work steps

(1) Mobilization and deployment stage.

20 17 before April. Housing and urban-rural construction departments at all levels have formulated special plans for dust control in housing construction and municipal works in combination with the actual situation in the region, deployed tasks in various stages, and comprehensively started dust control work.

(2) Implementation measures stage.

201April to June, 7 1 1. The responsible subjects of all parties shall conduct self-inspection on the construction site in strict accordance with relevant requirements, and fully implement the dust prevention measures of the project. The competent departments of housing and urban and rural construction at all levels should strengthen the law enforcement inspection of dust prevention and control in combination with daily supervision and standardization evaluation of safety production. For the projects whose dust control measures have not been implemented, it is necessary to order them to suspend business for rectification. For the projects with serious problems and refusing to rectify, it is necessary to severely punish them according to law, and expose the bad behaviors of the projects and relevant responsible persons to ensure the full implementation of the dust control measures in construction.

(3) Summarize the acceptance stage.

2017165438+10 to 65438+February. The competent departments of housing and urban-rural construction of cities and prefectures shall complete the inspection, assessment and work summary of dust control work in the local area (including counties and cities under their jurisdiction), and report the dust work summary to the Building Management Office of our office before February 20 (contact Yang Chao). Our office will supervise and accept the dust control situation in various places in combination with the target assessment of safety production responsibility and quarterly supervision.

Verb (abbreviation for verb) job requirements

(1) Strengthen organizational leadership.

The competent departments of housing and urban construction at all levels should fully understand the importance and urgency of the current dust-raising work in construction, pay close attention to deployment and take immediate action. Effectively strengthen communication with governments at all levels to help solve the comprehensive problems existing in construction dust control. Combined with local conditions, under the unified organization and leadership of the local government, improve the implementation plan of dust prevention and control led by the main leaders, clarify the work responsibilities, objectives, measures, steps and requirements, implement the industry guidance and hierarchical management functions within the administrative area, and effectively compile the work plan of dust prevention and control for housing construction and municipal engineering 100%.

(2) Strict law enforcement and supervision.

Strengthen the supervision and law enforcement of dust prevention and control in construction and municipal works, establish the working mechanism of reporting, supervision and unannounced visits, and urge all construction parties, construction waste transportation enterprises and ready-mixed concrete production enterprises to implement the responsibility of dust prevention and control in construction. Units that fail to fulfill the responsibility of dust prevention and control shall be severely punished in accordance with relevant regulations. If the circumstances are serious, it shall be punished according to the law and regulations, and the record of illegal behavior in the construction market shall be identified, and it shall be publicly exposed on social media to ensure that the dust prevention measures for housing construction and municipal engineering 100% are put in place.

(3) Improve emergency measures.

Housing and urban-rural construction departments at all levels should do a good job in emergency disposal of construction dust under special weather conditions. Strengthen communication with local environmental protection and meteorological departments to keep abreast of air pollution and meteorological information. According to the early warning response of severe weather levels such as serious pollution issued by the local government, the emergency response measures of housing construction and municipal engineering shall be implemented in time to ensure the emergency response of dust prevention and control of housing construction and municipal engineering 100%.

(4) Strengthen the application of evaluation results.

The competent departments of housing and urban and rural construction at all levels should strictly strengthen the supervision, inspection and annual assessment of dust prevention and control in construction in counties (cities) under their jurisdiction, and give notice of commendation for outstanding work; For areas that fail to complete the annual work tasks and have outstanding problems, they should be held accountable and inform the local government by letter.

In order to implement the deployment of dust control work of the municipal party committee and municipal government, further strengthen the prevention and control of dust pollution in construction projects, and improve the air quality of urban environment, this work plan is formulated according to the requirements of the Emergency Notice on Further Strengthening Dust Control in Construction Sites and Night Patrol of Dredger by the Office of the Leading Group for Air Pollution Prevention and Control in Henan Province. And the "Notice of the Housing and Urban-Rural Development Department of Henan Province on Printing and Distributing the Implementation Plan for Fighting Air Pollution in the Housing and Urban-Rural Construction System of the Province in 20 17" (Yujian [2065438+07] No.72) and other documents, combined with the actual situation of our city,

I. Guiding ideology

Guided by the principle of "people-oriented, scientific development", aiming at improving the quality of atmospheric environment and ensuring people's health, vigorously promoting green, safe and civilized construction as a means, adhering to the principles of overall planning, highlighting key points, comprehensively promoting and treating both the symptoms and root causes, through careful organization, careful arrangement, clear responsibility and strengthened supervision, the dust on the construction site has been effectively controlled, which has made positive contributions to winning the battle against air pollution in our city.

Second, the work objectives

Under the guidance of the decision-making and deployment of the municipal party Committee and the municipal government, the goal is to win the battle against dust pollution in construction projects. All units and departments under the Bureau should further strengthen the management of the construction site, strengthen cooperation and coordination, further strengthen and refine the dust control and rectification work of construction projects, reduce the generation and discharge of all kinds of dust pollution, effectively reduce the impact of dust pollution on the atmospheric environment, and ensure the completion of the construction dust control objectives and tasks within the municipal area.

Third, the leading body.

In order to promote the dust control of construction in the city, supervise and guide the relevant units to do a good job in dust control and management, the Municipal Housing and Urban-Rural Development Bureau decided to set up a leading group for night inspection of dust control of construction in Kaifeng as follows:

The office of the leading group is located in the safety supervision station, and the director of the office is Wang Junjie.

IV. Main rectification contents

First, the construction site should strictly implement the "six hundred percent" requirements for dust control, resolutely curb the generation of dust, and stop work and rectify all sites that do not meet the requirements.

The second is to strictly investigate the earthwork construction at night. Earthwork construction did not take dust control measures or measures ineffective, once verified, severely dealt with.

The third is to strictly check the washing situation of construction vehicles such as muck transportation, material transportation, loading and unloading, etc. All vehicles leaving the construction site must be effectively washed before they can drive on the road. It is forbidden to take mud and soil on the road.

Fourth, during the "cold protection" period from1October 201715 to March 20 18, the whole city implemented "soil sealing action", and all kinds of earthwork operations and house demolition (demolition) were stopped in the urban built-up areas. Major livelihood projects and key projects approved by the relevant departments, which involve earthwork operations, should not only issue a commitment letter for dust prevention in construction, but also designate a special person to be responsible for dust control in the construction process and strictly implement dust prevention measures in the construction site.

Verb (abbreviation for verb) job requirements

(a) all relevant units and departments should attach great importance to it, cooperate closely, strictly implement the night inspection system, and strictly implement the inspection standards. 20 17 the specific inspection plan shall be formulated by the office of the leading group according to the working conditions.

(two) night inspection in principle not less than once a week, organized by the office of the leading group, the safety supervision station is responsible for formulating the route. The frequency of night inspections should be increased during the emergency period of heavily polluted weather.

(3) The night patrol personnel shall record the patrol route and the problems found in each patrol in real time, and establish a patrol work ledger to be submitted to the safety supervision station the next day. The safety supervision station shall establish a night patrol record ledger to record the problems found in the patrol, the rectification issued and the rectification feedback. Report the night inspection record account to the leading group office every week, and the leading group office will report the inspection situation this week to the leaders on duty and determine the night inspection time this week according to the work situation, and arrange the night inspection personnel this week.

(4) The night watchman shall inspect in strict accordance with the dust prevention and control standards, and immediately order the relevant units to rectify the problems found in the inspection, and order them to stop work and rectify the problems that cannot be rectified immediately, and feed back the inspection to the leading group office the next day, and the leading group office shall notify the relevant departments to supervise according to the division of responsibilities.

(5) Relevant units and individuals found in the inspection that dust prevention and control measures are not implemented or poorly implemented shall take measures such as listing supervision, economic punishment, media exposure, blacklisting, recording bad behaviors in good faith, and prohibiting them from participating in bidding in the construction market.

(VI) All relevant units and departments should attach great importance to it, further strengthen organizational leadership, enrich personnel strength, and seriously investigate the responsibilities of responsible units and personnel who are not active in their work, shirk their responsibilities, delay the overall rectification work, and cause adverse effects.