Traditional Culture Encyclopedia - Weather inquiry - Installation contract of sewer pipe

Installation contract of sewer pipe

Model sewer installation contract

With the establishment of people's legal consciousness, the contract has helped us more and more. This contract is applicable to both parties. Guarantee is also a constraint. So how to draw up a contract? Presumably this makes everyone very upset. The following is a sample of the sewer installation contract I compiled for you. Welcome to read the collection.

Sewer Pipeline Installation Contract 1 Party A: (hereinafter referred to as Party A)

Party B: (hereinafter referred to as Party B)

In order to ensure that the sewage pipeline laying project of Jingmen Zhonghe Concrete Factory is completed on schedule, the following contract is reached through consultation between both parties:

I. Project site

Jingmen zhonghe concrete factory

Second, the project quality

1, the ground is flat, the pipeline is straight, and the manhole cover is kept at the same elevation point to ensure smooth drainage.

2. The supervisor adopts ¢ 100 machine-made pipe, the bottom plate adopts C 15 concrete, with a thickness of 0.08m and a width of 0.8m, and the joints adopt C25 mortar. The total length of the supervisor is 2100m.

3. The branch pipe adopts ¢60 machine-made pipe, the bottom plate adopts C 15 concrete, with a width of 0.7m and a thickness of 0.06m, and the joints are sealed with C25 mortar. The total length of the branch pipe is 4192m.

4. The main pipe shall be provided with a well every 30m, with a depth of 0.96×0.84, 1 m, a manhole cover of 0.72×0.84×0.08, and 10 steel.

5, branch pipe every 10 meters set a well, 0.8 meters deep, 0.62 meters long, 0.5 x 0.5 x 0.06 wide, with ¢8 steel.

Third, the project cost

The price per meter of pipe diameter 100 cm is 520 yuan, and the price per meter of pipe diameter 60 cm is 430 yuan, including inspection wells, manhole covers and manhole covers. The total cost is about 1.5 million yuan. Finally, it is calculated according to the actual engineering quantity.

Fourth, the construction period

Within 60 days from the date of signing the contract (except rain and snow).

Verb (abbreviation of verb) payment terms

At the beginning of sewer construction, pay 20% of the project cost. After the completion of sewer laying, 50% of the total project cost will be paid, and the remaining 30% will be paid in two installments within one year.

Other agreed items of intransitive verbs

1. The warranty period is 1 year. If it is washed away by rain due to quality problems, Party B shall be responsible for the maintenance, and the expenses shall be borne by Party B. ..

2. Party B shall abide by the regulations on safety in production in engineering construction.

According to the management regulations, the construction shall be organized in strict accordance with the safety standards, and all consequences caused by construction safety shall be borne by Party B..

Seven. responsibility for breach of contract

1. After the project is completed and accepted, Party A shall make payment by payment method.

2. If the project cannot be completed according to the agreed completion date due to Party B's reasons, Party B shall bear a daily fine of 1.5 ‰ (1.5‰).

Eight. This contract shall come into effect as of the date of signing, in duplicate, with each party holding one copy.

Party A (seal)

Party B (seal)

Representative of Party A (signature)

Representative of Party B (signature)

Date, year and month

2 Party A (hereinafter referred to as Party A) sewage pipeline installation contract:

Party B (hereinafter referred to as Party B):

Through negotiation between Party A and Party B, Party A contracted the water pipe maintenance project of the north building of Wenxin Jiayuan Residential Building in Bamiantong Town, Muling City to Party B.. Specific matters are as follows:

1. Scope of work: maintenance of sewage pipes in the north building of Party A's residential building.

2. Contracting method: Party A contracts to Party B in the form of contract work and materials.

Three. Engineering requirements: Party B shall be responsible for the maintenance of all damaged sewage pipes in the residential building/unit KLOC-0/-5 in the north building of Party A's community, so as to ensure that the sewage main pipe of each unit and the well in the hospital are unobstructed; Dredge the wells belonging to the north building of the hospital to ensure the smooth flow between wells; Clean up the clogged dirt in the trench of the North Building and repair the damaged pipes in the trench that affect the sewage discharge. Party B is responsible for trench excavation, purchasing all materials needed for the project and ensuring the quality of materials. After the completion of the project, all excavated ground should be completely backfilled.

4. The total price of the above projects is 8000 yuan. After the acceptance of the project, Party A shall pay Party B in one lump sum.

5. The total construction period of this project is 2 days, that is, from 20xx 10/0 to 20xx 10 year 10.8, and Party B shall ensure that it is completed on schedule.

Other requirements of intransitive verbs: During the construction period, Party B shall conduct civilized construction and set up safety facilities, and Party B shall be responsible for all safety accidents during the construction.

Seven. The project quality warranty period is 1 year. During the warranty period, Party B shall be responsible for the unconditional free maintenance of sewage pipes caused by engineering quality.

Eight. This contract is made in duplicate, one for each party.

Nine. This contract shall come into force as of the date of signing.

Party A: Signature: Date:

Party B: Signature: Date

Sewage Pipeline Installation Contract 3 Party A: (hereinafter referred to as Party A)

Party B: (hereinafter referred to as Party B)

Due to the disrepair of the toilet sewer in the office building, sewage blocks the cross flow, which brings inconvenience to office and life. In order to create a good office and living environment, Party A and Party B have reached the following agreement on the replacement and maintenance of this sewer project:

1. Project location: toilet sewer on the 4th floor of office building 1.

Second, the project content: sewer installation and renovation.

Third, the project quality:

1, PVC pipes must be national standard products.

2. Pipeline construction and installation meet the technical requirements of national installation, so that the bottom plate is flat and firm, and the drainage is smooth.

Four. Project time: 20xx year165438+1October 29th to 20xx year 65438+February xx.

5. Project cost: The total project cost is RMB (whole), including labor cost and material cost.

6. Payment method: After the project is completed, the payment shall be made by acceptance bill, with the amount of RMB Yuan only, and paid in one lump sum.

Seven. Other agreed matters.

1. The warranty period is 1 year. Party B shall be responsible for the maintenance of water seepage, water leakage, rain or strong wind damage caused by quality problems, and the expenses shall be borne by Party B. ..

2. Party B shall abide by the management regulations on safety production in engineering construction and organize construction in strict accordance with safety standards. Party B shall be solely responsible for all consequences caused by construction safety.

Eight. This contract is made in duplicate, one for each party, and shall come into effect after being signed by both parties.

Party A: Party B:

Year month day:

4 Party A's sewage pipe installation contract:

Party B:

Based on the principles of voluntariness, good faith and mutual benefit, Party A and Party B have reached the following agreement through consultation for mutual compliance:

1. Party A will hand over the sewage pipeline reconstruction project of Huangcheng Street (next to Fucai Station) in Ji Zheng to Party B for construction.

2. Total project price: seventeen thousand yuan only. Party A shall deliver it to Party B in the form of general contracting.

Three. Party A shall provide Party B with construction drawings and water and electricity. Party B shall strictly follow the drawings provided by Party A to ensure the quality of the project. The construction period is ten days.

Four. Party B shall do a good job in safety during construction. Party B shall be responsible for all safety accidents during construction.

5. At the request of Party B, Party A can provide concrete for this project, and relevant expenses will be deducted from Party B's project payment.

6. Payment method: Party A shall pay Party B a start-up capital of 5,000 yuan, and the balance shall be paid after the project is completed.

7. This contract is made in duplicate, one for each party, and shall come into effect as of the date of signature.

Party A (signature): Party B (signature):

date month year

;