First, do a good job in heating protection to ensure the safe and stable operation of the heating pipe network. Hengtai Thermal Power Company should immediately start the emergency plan for extremely cold weather in heating network, and the heat source factory should start one at the same time? 130? Ton furnace and two 90 s? Ton furnace, used to relieve the heating pressure of power plant.

Adjust high-quality coal to ensure high-quality heat output, and notify Erdaojiang Power Plant to maintain the maximum heating for nearly a week to ensure that the equipment does not break down and runs smoothly. Strengthen the scientific regulation of the dispatching command center, flexibly adjust the temperature of the heat exchange station through the user room temperature detection system, and realize on-demand distribution. Strengthen the user service center's explanation service for users' calls and visits to ensure users' satisfaction. ?

The second is to do a good job in the wintering maintenance and safety fire prevention of the New Year carry-over project. It is necessary to adhere to the "red line" consciousness and "bottom line" thought of safety production, further enhance the sense of responsibility, implement the safety production system, and strengthen the safety management of carried-over projects. Carry-over projects should do a good job in wintering safety protection and strictly implement the winter duty inspection system. Do a good job in fire prevention and theft prevention to prevent accidents such as carbon monoxide poisoning and electric shock; It is strictly forbidden for left-behind personnel on duty to live in buildings that have not been delivered for use. ?

The third is to do a good job of visiting and investigating poor households living in old and scattered communities to ensure that their lives are not affected. ?

Fourth, do a good job in the maintenance of municipal roads and facilities to ensure smooth roads and safe operation of municipal facilities.

Extended data:

Don't use hot water to shower or bake frozen faucets, water meters and pipes, otherwise it will damage water supply facilities. It is advisable to wrap a hot towel on the faucet first, then pour warm water to thaw the faucet, and then unscrew the faucet to solve the problem of water pipe freezing:

The first is "warm water thawing", that is, warm water is slowly injected into the pipeline along the faucet to thaw the pipeline;

The second is "hot air thawing", in which hot air or boiled steam is blown by a hair dryer to slowly melt the ice. If you pour water on the water meter, there is still no water flowing out, which means that the water meter is frozen. At this point, wrap a hot towel on the water meter and pour warm water (not higher than 30 degrees Celsius) to thaw the water meter.