What are the technical requirements for construction electricity safety in rainy season? What are the relevant regulations? Please see the introduction below.

The person in charge of the disclosed unit shall disclose the content of safety technology. Operators must undergo professional training and examination, and electricians with special operation certificates must hold relevant certificates. (During the validity period, it needs to be filed with us. ) Operators must receive electricity safety education and take up their posts after passing the examination. One must work and one must be supervised. Workers should wear insulated shoes and work after power failure and electricity inspection.

When entering the construction site, you must wear a qualified safety helmet, fasten your chin strap and lock your belt buckle. When working high above the ground, you must fasten the qualified safety belt, which should be hung firmly, hung high and used low. When entering the construction site, it is forbidden to smoke, do drunken homework, chase and play, skip work, operate machinery and equipment that has nothing to do with you, and strictly abide by various safety operation procedures and labor discipline. Check and familiarize yourself with the working environment before entering the work site.

If unsafe factors and hidden dangers are found, they must be reported to the relevant departments in time, and the construction work shall be carried out immediately after the safety is confirmed. In the process of construction, the hidden dangers endangering personal safety should be stopped immediately, and the relevant departments should be required to deal with them in time.

All safety protection facilities and safety signs on site are strictly prohibited to be moved or removed without permission. If it is necessary to move or dismantle temporarily, it must be reported to the relevant person in charge. It can be dismantled on the premise of ensuring the safety of operators and other personnel, and it will be resumed immediately after the work is completed. Listen to the weather forecast every day, keep abreast of the weather change information, and prepare for rain. Signature of the person responsible for disclosure; Signature of the person responsible for disclosure.

9. The contents of safety technical disclosure by the person in charge of the disclosure unit. Before the rainy season comes, conduct a comprehensive inspection of on-site power supply lines and equipment, and timely rectify and replace problems and components such as aging lines, poor installation, reduced insulation, line soaking and leakage. 10, on-site power distribution box, switch box, lighting circuit, lamps and lanterns, door (aviation) messenger wire, etc., found that the leakage damage, aging phenomenon timely maintenance and replacement. 1 1. Outdoor electrical work shall be strictly carried out in thunderstorm weather.

12. After inspecting and telemetering the wiring and distribution box of the flood control pump, do a good job of moisture prevention and be ready for use at any time. 13. For all basic electrical equipment placed in the open air, the power supply must be cut off and the distribution box locked before it rains. 14. Before it rains, outdoor distribution boxes, switch boxes, electric welding machines, cutting machines, steel processing equipment, vibrating rods, etc. There must be rain-proof and moisture-proof facilities and power-off treatment to prevent rainwater from entering the box and electrical equipment, causing danger. 15, electrical equipment and electrical equipment in canteen, living area and office area should be well protected from rain and moisture. 16, electrical equipment, wiring and temporary electricity use in the laboratory should be well protected from rain and moisture.

17, electrical equipment, lines and temporary electricity consumption in the boiler room should be well protected from rain and moisture. 18. After the rain, all electrical facilities, equipment and lines in their respective areas should be inspected immediately, and problems found should be handled in time. Distribution box, electrical equipment, etc. , should be processed after the power failure, make it dry insulation, telemetry insulation resistance standards before sending operation.

For information about construction enterprises, bid-winning achievements, builders under construction, enterprise honors, industrial and commercial information, legal proceedings, etc., please visit Zhong Da Consulting, Construction Link or follow the official account of Zhong Da Consulting WeChat for inquiry.