Traditional Culture Encyclopedia - Weather inquiry - Black odor water pollution control project scheme

Black odor water pollution control project scheme

Project proposal (also called project application) is a proposal document for a specific project put forward by the project construction preparation unit or project legal person according to the national economic development, national and local long-term planning, industrial policy, productivity layout, domestic and foreign markets, local internal and external conditions, etc. This is the general idea of the proposed project. For large and medium-sized projects, some projects have complex technology, wide coverage and great coordination. It is also necessary to prepare a feasibility study report as one of the main annexes of the project proposal. The project proposal is the initial stage of the project development cycle, the basis for the country to choose the project and the basis for the feasibility study. Projects involving the utilization of foreign capital can only be carried out after the project proposal is approved.

The main contents of the project proposal shall include:

(1) The necessity and basis of the project proposal;

(2) Preliminary ideas on product scheme, planned scale and construction site;

(3) A preliminary analysis of the countries and manufacturers that introduced resources, construction conditions, cooperative relations, equipment and technology;

(four) investment estimation, financing and loan repayment plan;

(five) the project schedule;

(6) Preliminary estimation of economic and social benefits, including preliminary financial evaluation and national economic evaluation;

(seven) preliminary environmental impact assessment, including three wastes control measures and ecological environment impact analysis;

(8) conclusion;

(9) Accessories.

The preparation procedure of project proposal is: the project proposal is put forward by government departments, national professional companies, existing enterprises and institutions or newly established project legal persons. Among them, cross-regional and cross-industry construction projects, projects that have a significant impact on the national economy and people's livelihood, and domestic joint venture construction projects should be jointly proposed by relevant departments and regions; For Sino-foreign joint ventures or cooperative projects, after the Chinese and foreign investors reach an intention agreement, they should prepare the project proposal according to the relevant domestic investment policies and industrial policies. When submitting a project proposal, a preliminary feasibility study report should be attached to a large and medium-sized and above-scale proposed project. The preliminary feasibility study report shall be compiled by a qualified design unit or engineering consulting company.

2. Requirements for preparing project proposal:

According to the current regulations, a construction project refers to a construction unit that is composed of one or several units within the scope of overall design or preliminary design, with unified economic accounting and unified administrative management. Therefore, a unified project proposal should be prepared for the main project, supporting projects and ancillary facilities that are economically unified within the overall design or preliminary design; Within the scope of overall design, each economically independent project shall prepare a project proposal separately; For phased construction projects within the overall design scope, project proposals should also be prepared separately.

Authority for examination and approval of project proposal:

At present, project proposals should be examined and approved at different levels according to the existing management system and affiliation. In principle, according to the affiliation, the opinions of the competent department will be put forward by the subjective department, or jointly with the comprehensive department, or separately.

(a) large and medium-sized capital construction projects, renovation projects above designated size, commissioned by qualified engineering consulting and design units after preliminary examination, by the provinces, autonomous regions, municipalities directly under the central government, cities under separate state planning and centralized departments of industries after preliminary examination, reported to the State Planning Commission for approval, of which mega-projects (transportation, energy, raw materials projects with a total investment of more than 400 million yuan, and other projects with a total investment of more than 200 million yuan) were reviewed by the State Planning Commission and reported to the State Council for approval. Major projects exceeding $654.38 billion will be submitted to the State Council for approval.

(two) small capital construction projects and renovation projects below the quota shall be examined and approved by the local or the State Council.

1. Small projects, domestic projects with a total investment of100,000 yuan or more, productive foreign investment projects with a total investment of more than 5 million US dollars, and unproductive foreign investment projects with a total investment of more than 3 million US dollars, the project proposals shall be examined and approved by the local authorities or the State Council.

2. For domestic projects with a total investment of less than 6.5438+million yuan and unproductive foreign-invested projects with a total investment of less than 5 million dollars, based on the principle of simplifying procedures, if the project construction content is relatively simple, the feasibility study report can also be directly prepared. Tmall US WeChat reminds: Remember to take good protection when traveling in foggy days.

Four main tasks after the approval of the project proposal:

Determine the organization, personnel, legal representative and legal representative of the project construction.

Select the construction site, apply for planning and design conditions, and formulate the planning and design scheme.

Implement the fund-raising plan.

Implementation of water supply, power supply, gas supply, heating, rain and sewage discharge, telecommunications and other municipal public facilities supporting planning.

Implement the supply of main raw materials and fuels.

Implement environmental protection, labor protection, health and epidemic prevention, energy conservation and fire control measures.

Foreign-invested enterprises apply for pre-registration of enterprise names.

Conduct detailed market research and analysis.

Prepare the feasibility study report.