Traditional Culture Encyclopedia - Weather inquiry - Emergency plan for road flood control
Emergency plan for road flood control
The day before the emergency plan for road flood control was issued, 20 14 "Emergency Plan for Flood Control in Beijing Transportation Industry" (hereinafter referred to as the emergency plan) was issued. The emergency plan requires that a special person should be set up at the entrance of the subway station to pay close attention to the rain during heavy rainfall and take measures as appropriate to prevent rainwater from flowing back to the station.
* * * Transportation enterprises are equipped with sufficient capacity and a certain number of spare vehicles in key time periods (morning and evening rush hours) and key lines, and operate overtime vehicles, and adjust the operating hours in a timely manner. On the basis of ensuring the safety of bus lines in mountainous areas, measures such as stopping the shuttle bus are taken. During the rainy period, flood control personnel will conduct uninterrupted inspections in the responsible area and report the information on the drainage operation site every hour.
The "Emergency Plan" is applicable to the rescue work of municipal road facilities damaged by water, as well as the flood prevention and rescue work of existing facilities of general highways, expressways and rail transit at or above the county level; Responsible for organizing and coordinating the storage, mobilization and transportation of municipal flood control materials transportation vehicles; Ensure the safe operation of public transport, maintain the order of passenger and freight transport market, and timely deploy public transport forces to evacuate passengers stranded in railway stations and airports due to rainfall; Responsible for the emergency treatment of landslide blocking traffic caused by rainfall on general roads at or above the county level in mountainous areas.
The flood control headquarters of Beijing Municipal Communications Commission was established to strengthen overall command.
During the flood season this year, the Beijing Municipal Commission of Communications set up a flood control headquarters, with the main leaders of six units in Beijing's transportation industry 16 as members, including the Municipal Commission of Communications, the Municipal Bureau of Communications, the Municipal Traffic Enforcement Corps, the bus group, the subway operation company, the First Launch Group, the Federation of Trade Unions, Xianglong Company and the Jinggang Metro Company, who are responsible for organizing and coordinating relevant departments to carry out emergency repairs on highway facilities, expressways and ordinary highways above the county level. Organize and coordinate relevant departments to implement the storage, transportation and dispatching of municipal flood control emergency materials transport vehicles; Ensure the safe operation of public transport; Maintain the order of passenger and freight transport market and supervise the implementation of emergency preventive measures.
The emergency plan is a revision of the original emergency plan for flood control in Beijing's transportation industry. Its purpose is to further implement the flood control responsibility system, flood control emergency plan, flood control emergency team, flood control emergency materials, flood control emergency transportation capacity and flood control measures. Fully ensure the safety and smoothness of expressways, general highways and bridges at or above the county level in flood season in this city; Fully guarantee the safe operation of buses, domestic long-distance passenger transport, inter-provincial passenger transport and water cruise ships in flood season in this city; Fully guarantee the safety of rail transit operation and existing rail transit facilities in this city during flood season.
Set four alert levels: blue, yellow, orange and red.
According to the danger level, the flood warning of Beijing transportation industry is set to four levels, such as blue, yellow, orange and red, and corresponding response procedures are started according to different warning levels.
When it is predicted that the rainfall will reach more than 20 mm and less than 50 mm in the next 6 hours; Or urban roads, highways, and general highways above the county level begin to accumulate water, and the depth of accumulated water may reach 20 cm, and the depth of accumulated water under some overpasses and bridges may reach 30 cm; Or the depth of accumulated water in the subway station square and depot may reach 20 cm. Which is to activate the blue alert. The leaders and security units of the flood control headquarters of Beijing Municipal Communications Commission will take classes and personnel to their posts and be on duty 24 hours a day to ensure smooth communication; All emergency personnel, equipment and vehicles of all member units are in place for standby; All member units shall report relevant work information on rainy days at any time, and all kinds of wired and wireless communication equipment are in the open state.
It is predicted that the rainfall will reach more than 50 mm in the next 6 hours, or it has reached more than 50 mm and the rainfall may continue; Or urban roads, highways, and general highways above the county level begin to accumulate water, and the depth of accumulated water may reach more than 20 cm and less than 30 cm, and the depth of accumulated water under some overpasses and bridges may reach more than 30 cm and less than 50 cm; Or the slope protection of subway entrances and exits may be partially damaged, and the entrances and exits of individual subway stations may be flooded, resulting in the abnormal use of operating equipment; The depth of accumulated water in the subway station square and depot may reach more than 20 cm and less than 30 cm.
That is, start the yellow warning. On the basis of the blue warning response, further strengthen the leadership to lead the class, and all member units strengthen inspections, and organize timely disposal and timely report when problems are found; The Office of the Flood Control Headquarters of the Municipal Communications Commission shall, according to the rainfall occurrence area and rainfall trend, check the position of leaders of relevant member units and ask about real-time rain conditions and related work; Public transportation departments such as buses, subways and railways have increased their input in transportation capacity to meet the travel needs of citizens.
It is predicted that the rainfall will reach more than 50 mm in the next three hours, or it has reached more than 50 mm and the rainfall may continue; Or urban roads, highways, and general highways above the county level begin to accumulate water, and the depth of accumulated water may reach more than 30 cm and less than 50 cm, and the depth of accumulated water under some overpasses and bridges may reach more than 50 cm and less than 100 cm; Or the slope protection of subway entrance may be seriously damaged; Water may enter the entrances and exits of many subway stations, resulting in the unavailability of operating equipment; The depth of accumulated water in subway station square and depot may be greater than 30 cm and less than 50 cm. That is, the orange warning is activated.
On the basis of the yellow early warning response, we should organize all forces to prepare for the emergency rescue of flood-damaged defense lines, fully ensure the safe and smooth flow of municipal roads, expressways, general roads and bridges at or above the county level, and ensure the safe operation of existing rail transit facilities.
When it is predicted that the rainfall will reach 100 mm or above in the next three hours, or it has already reached 100 mm and the rainfall may continue. Or urban roads, highways, and general highways above the county level begin to accumulate water, and the depth of accumulated water may reach more than 50 cm, and the depth of accumulated water under some overpasses and bridges may reach more than 100 cm; Or the slope protection of subway entrance may collapse seriously, and the subgrade may collapse seriously; The entrances and exits of many subway stations may be seriously flooded, leading to the interruption of operation; The depth of accumulated water in the subway station square and depot may reach more than 50 cm. Which is to activate the red alert. On the basis of the orange warning response, mobilize the resources of the whole industry to fully respond, and further strengthen the intensity and input of all work.
When it rains heavily, set up a special person at the entrance of the subway station to pay close attention to the rain.
The Emergency Plan requires that in case of heavy rainfall, the flood control and rescue teams of all units should be in place quickly, organize flood control and rescue, and report the situation to the flood control headquarters of the unit in time. After the flood control and rescue teams of all units arrive at the scene of water damage, they should first put traffic guidance signs according to the patterns to divert traffic and prevent social vehicles from entering the job site. When the tunnel is damaged by water, put traffic guide signs from the tunnel entrance.
The flood control teams of all units shall protect the subgrade and bridge foundation from further damage when working at the scene of water damage; Fully consider the loss of soil bearing capacity caused by blisters; Timely repair and reinforce facilities such as slopes and retaining walls damaged by water. During heavy rainfall, rail transit operators set up special personnel at the subway station entrance to pay close attention to the rain. Once it is found that there is water on the road surface and rainwater may flow back to the station, measures should be taken quickly to set up water baffles and pile up waterproof sandbags. * * * Transportation enterprises are equipped with sufficient capacity and a certain number of spare vehicles in key time periods (morning and evening rush hours) and key lines, and operate overtime vehicles, and adjust the operating hours in a timely manner. On the basis of ensuring the safety of bus lines in mountainous areas, measures such as stopping the shuttle bus are taken.
The second emergency plan for highway flood control is to do a good job in highway flood control in our bureau, effectively and orderly implement flood control and emergency rescue in case of sudden disasters, minimize the damage losses caused by floods to roads, and ensure the safe and smooth flow of roads in flood season. This work plan is formulated according to the People's Republic of China (PRC) Flood Control Law and other laws and regulations, combined with the actual situation of highway maintenance in our bureau.
I. General requirements
Strengthen flood control responsibility, strengthen flood control measures, scientifically command and dispatch, and make highway flood control work better and realize? Ensure safe and smooth roads during flood season? Work objectives.
Second, organizational leadership
In order to strengthen highway flood prevention and rescue work, the regional bureau has set up a leading group for highway flood prevention work, and each highway station has set up corresponding organizations to take charge of highway flood prevention work, earnestly do all the preparations in flood season, and ensure that the organization, responsibilities and measures are in place.
Third, the specific requirements
(1) All departments and highway stations should stand at the height of being highly responsible for highway property and highway safety and smoothness, fully understand the importance and urgency of flood control, enhance flood control awareness, overcome paralysis and luck, maintain high vigilance, and make good preparations for flood control and flood fighting.
(2) We should earnestly follow the principle that subordinates obey superiors, local interests obey the overall interests, and unite and cooperate. In the event of a flood, the rescue teams of all units should unconditionally obey the dispatch of the leading group for flood control, achieve unified command and action, and effectively grasp the flood control work.
(three) always pay attention to the weather changes, timely grasp the water situation. According to the division of work, the flood control leading group of the Bureau insists on patrolling on the road, finds problems, handles them in time, and grasps the water situation in time, so as to ensure that there are no empty posts on duty during the flood season and ensure the safe and smooth roads. If there are no personnel on duty, leaders on duty, or untimely inspections during the flood season, which delays the rescue opportunity or causes heavy losses, the responsibility of the relevant leaders and the parties on duty shall be investigated.
(four) flood control work to implement the administrative responsible person responsibility system. In case of danger or receiving the flood fighting and emergency rescue task from the superior, the heads of all departments, highway stations and emergency rescue teams should immediately rush to the scene to organize and command, put into emergency rescue work, take emergency measures in time, repair damaged sections and bridges, and ensure that accidents do not occur and roads are safe and smooth.
Fourth, prepare flood control materials.
Seriously implement it? Safety first, prevention first? Thought, be prepared for a rainy day, nip in the bud, set up a highway rescue team as soon as possible, and respond to possible dangers at any time. According to the requirements of flood control work and the actual situation, carefully prepare flood control stones, sandbags, ponchos, shovels and other materials to ensure that machinery, personnel, vehicles and materials are available? Four realization? . Early preparation, early inspection, early prevention, to ensure that after the water damage, emergency materials can be in place in time, and the fastest speed to repair and open to traffic.
Five, a comprehensive inspection, highlighting the key points
1, check before flood season, completely eliminate hidden dangers, and improve comprehensive flood control capacity of highway. In the first half of the main flood season, it is necessary to check the hidden dangers of major highways and bridges in the whole region and deal with them in time when problems are found. Investigate dangerous bridges and hidden points of geological disasters along the line, take effective reinforcement and maintenance measures, and do a good job in monitoring and early warning. In case of danger, preventive measures should be taken in time. Do early detection, early prevention and early treatment, and resolutely put an end to all kinds of major road accidents.
2. Strengthen the daily inspection of roads, attach great importance to the flood control work of mountain roads and persevere. For bridges and culverts, permeable subgrade, debris flow, landslide, landslide, rockfall, collapse and other road sections that endanger traffic safety, obvious warning signs shall be set up. In case of natural disasters such as water damage, send people to be on duty 24 hours a day to deal with the skew of street trees in time to ensure the normal passage of roads. For water damage that cannot be dredged in a short time, immediately organize the construction of temporary access roads and temporary bridges to ensure the safe passage of road transportation as much as possible.
3. Pay special attention to the flood control work on the construction site of key projects, and transfer temporary facilities, building materials and construction machinery and equipment to safety zones in advance to ensure safe production and safe flood control. Especially for the bridge construction projects in the river reach, detailed flood control inspection should be carried out, the construction personnel should be moved to a safe area as soon as possible, and the construction unit should be instructed to formulate flood control plans and supervise their implementation to ensure the safety of construction personnel and materials.
4. Pay close attention to the weather changes, listen to the weather forecast every day, keep abreast of the rain and water conditions, and make various preparations in advance.
5. Do a good job in publicity and reporting, and actively cooperate with many media circles such as radio stations, newspapers and television stations. Actively create an atmosphere of public opinion on flood control, strive for the support of the public, and consciously participate in flood control and flood fighting. And timely release road traffic information to the society through radio, television, newspapers and other news media.
Six, strict duty system and water regime reporting system
Adhere to the leadership system on duty, and the top leaders take full responsibility. During the flood season, it is necessary to be on duty 24 hours a day to ensure smooth communication. The personnel on duty should keep a high degree of vigilance and earnestly take responsibility. In case of serious floods, broken roads and major disasters, it is necessary to report to the superior immediately and organize forces to repair and open to traffic as soon as possible. In accordance with the requirements of the Municipal Bureau, strictly implement the system of ten-day reporting in flood season and report the distress situation at any time during the special period of flood season.
Seven, the implementation of accountability
The personnel on duty should fulfill their duties, stick to their posts, and ensure the normal use of communication equipment and the good operation of vehicles on duty. Those who neglect their duties and retreat in distress, causing property and life losses to the country and people, should be held accountable.
Emergency plan for road flood control III Units, offices, stations, road transport enterprises, stations and GPS monitoring centers:
In order to do a good job in the safety management of the source of road transport in flood season, and ensure the stability of the safety production situation of road transport in flood season and the timely evacuation of overstocked passengers caused by unexpected factors, according to the "People's Republic of China (PRC) Flood Control Law" and the actual situation of road transport management in our county, an emergency flood control plan is formulated, which is expected to be implemented.
I. Guiding ideology
Follow? Safety first, constant vigilance, prevention first and all-out rescue? Conscientiously implement the principle of responsibility system for flood control. Responsibility, command, personnel, materials, measures, and emergency rescue shall be timely, and unified command, coordination, deployment, rapid response, scientific response, and graded implementation shall be achieved to ensure safety and normal work in flood season.
Second, the working principle
(1) Adhere to safety first.
(2) Adhere to timeliness and effectiveness.
(3) Adhere to territorial management and graded responsibility.
(four) adhere to prevention, early prediction and early disposal.
Third, organization
In order to do a good job in source safety management in flood season, establish a leading mechanism for flood control work, clarify responsibilities, and ensure the safety of road transportation in our county during flood season, 20 13 Road Transportation Flood Control emergency headquarters was established through research, with the following members:
Commander-in-Chief: xx (the main person in charge of the Transportation Management Office)
Deputy Chief Commander: xx (Deputy Director of Transportation Management Institute)
Xx (Assistant to the Director of Transportation Management Institute)
Member: xx (Chief of Transportation Management Unit)
Xx (Head of Vascular Driving Training Unit)
Xxx (Head of Safety Law Unit)
Xxx (director of logistics center)
Xxx (Chief of Finance Unit)
Xxx (office director)
Xxx (chief of administrative examination and approval unit)
Xxx (director of station office)
Xxx (stationmaster of Youxi Station)
Xxx (stationmaster of Luodu Station)
Xxx (head of the municipal customer department)
Emergency headquarters Flood Control Office is located in the Safety Legal Unit, and Luo Xiaojun is specifically responsible for the safety management of road traffic sources in flood season.
Four, flood control supervision and duty arrangement
1, requirements:
(1) Adhere to the 24-hour duty system during the main flood season to ensure smooth communication;
(2) The personnel on duty must stick to their posts, carefully keep the duty records and hand-over work, and obey orders at any time;
(3) Collect and report the flood situation at any time.
2, the establishment of flood control supervision institutions:
Director: xxx
Team leader of the first inspection team: xxx
Members: xxx, xxx, xxx, xxx, in charge of Chaluodu District.
Team leader of the second inspection team: xxx
Members: xxx, xxx, xxx, xxx, mainly responsible for investigating Youxi jurisdiction and various transportation enterprises.
3, the flood season source safety management office:
Located in the safety legal system unit, the office director is xxx. Daily duty telephone: xxx (fax telephone), xxx, xxx in the evening.
Five, Yuechi County road transport capacity guarantee scheme in flood season
In order to do a good job in ensuring road transport capacity in flood season, ensure the normal development of flood control work, ensure the normal operation of social economy and the relative stability of circulation market, and ensure the supply of people's daily necessities, a road transport capacity guarantee scheme is formulated according to the requirements of relevant provincial and municipal documents.
(1) organizational structure
The county transportation management office has set up a leading group for ensuring road transportation capacity in flood season, with Xiong Neng as the team leader, Liu Yang, deputy director and Yin Juan, assistant director as the deputy team leader, Chang Chenghong, chief of safety legal system, Luo Xiaojun, chief of vascular unit, Cheng Gang and other comrades as members. The office of the leading group is located in the transportation management unit of the hospital, and Comrade Yi Zhu is responsible for the daily work. Duty phone: 5032003.
(two) the responsibilities of the road transport capacity guarantee institution
1. Organize and arrange transportation reserves, and be responsible for organizing and managing transportation in flood season. According to the opinions of the leading group, organize the deployment of transport vehicles and personnel for emergency rescue and disaster relief and personnel distribution.
2, in accordance with the requirements and deployment of the Municipal Transportation Management Office and the County Transportation Bureau, responsible for the county's road transport capacity scheduling, and the implementation of security tasks, responsible for organizing and supervising.
3, responsible for coordinating the investigation and solving problems in the implementation of emergency support tasks.
4. Submit the results of emergency transportation support tasks (information such as the number of vehicles, total tons (passengers), task execution time, operating points, routes, types and quantities of transported goods, number of delivery personnel, etc.).
(three) to ensure the safety of road transport vehicles and personnel.
1. During the flood control period, the passenger transport company, Ange Company, Team 43 and Team 84 each prepare 5 passenger cars, and Haitian, Hongfa, Yin Xin, Tongfa and Hongyu freight companies each prepare 5 freight cars. Before April 26th, the license plate, driver and telephone directory will be reported to the emergency flood control headquarters office of the hospital, which will be used as emergency transportation capacity for flood control at any time.
2. The office of the Leading Group for Road Transport Capacity Support of the County Transportation Management Office is on duty 24 hours a day in accordance with the duty system in flood season, and keeps in touch with enterprises, vehicles and security personnel undertaking emergency transport support tasks, and implements contact information and telephone numbers to ensure emergency transport capacity support.
3. Emergency support personnel must be excellent drivers, healthy and dedicated, aged between 23 and 50.
(four) the implementation procedures for the start of emergency support capability
1. After receiving the command to start the emergency transportation capacity of the emergency support leading group in the flood season, first accurately grasp the number of emergency transportation capacity, emergency vehicle types, assembly points, transportation capacity handover methods and other related matters; Secondly, notify the emergency transportation capacity guarantee enterprises and car owners to immediately start the emergency transportation capacity guarantee work in flood season.
2. Units carrying out emergency transportation support tasks also send more than 5 vehicles to carry out the same task, led by the team leader, 10 or more by the unit leader, and more than 20 vehicles by the personnel arranged by the Municipal Transportation Management Office.
3. Units, enterprises and car owners who carry out emergency support in flood season must unconditionally carry out emergency transportation instructions issued by superiors. Those who refuse to carry out orders, neglect their duties or shirk their responsibilities will be held accountable.
(five) the personnel on duty should be clear about their responsibilities, be familiar with the relevant regulations, and master the situation of transportation capacity guarantee reserves in their respective jurisdictions and units. In case of emergency, they should immediately report to the leaders on duty.
(6) The enterprise undertaking the emergency transportation guarantee task must complete the verification of emergency transportation capacity in the near future, and report it to the county level for the record together with the confirmed emergency passenger transportation capacity after verification.
Emergency Plan for Road Flood Control IV 1 General Provisions
The purpose of compiling 1. 1
Reduce the losses caused by floods, avoid and reduce casualties to the maximum extent, scientifically implement flood control dispatching and emergency rescue and disaster relief, make good flood control plans and preparations, and ensure social and economic development.
1.2 basic principles
Resolutely implement the responsibility system of the office chief executive; Prevention first, combined with robbery prevention; Full deployment to ensure key points; Unified command and unified dispatch; Combining engineering measures with non-engineering measures; Mobilize all positive factors of the whole society as much as possible to unite against floods.
1.3 compilation basis
According to the Flood Control Law of People's Republic of China (PRC), the Flood Control Regulations of People's Republic of China (PRC), the Outline of Urban Flood Control Planning formulated by the National Defense General Office and relevant laws and regulations, and combined with the actual situation of our street, this plan is formulated.
1.4 adaptation range
This scheme is applicable to flood accidents of all communities and enterprises within the jurisdiction of this street.
2 Organization and responsibilities
2. 1 organization
Hongqi Road Sub-district Office set up flood control headquarters (hereinafter referred to as the headquarters).
Members are as follows:
Total finger swing: xxx
Deputy commander xxx xxx xxx xxx xxx
Members: xxx, xxx, xxx
The headquarters has an office, which is located in the Safety Supervision Office. The office director is xxx. Under the unified command of the headquarters, five emergency groups were established, namely, communication liaison group, medical rescue group, logistics material support group, support group and emergency rescue group.
2.2 Responsibility
2.2. 1 Main responsibilities of street flood control and flood fighting headquarters
(1) Under the leadership of the District Flood Control Headquarters and the Street Party Working Committee and Office, carry out the national flood control laws and policies, the decisions and instructions of the flood control headquarters, the instructions of the Street Party Working Committee and Office on flood control and disaster relief, issue the start-up plan order, and direct relevant departments to do emergency response work.
(2) according to the disaster situation, put forward the demonstration opinions of emergency plans for flood control and flood fighting, lead, deploy and coordinate the emergency work of disasters, deploy and organize various departments to implement flood control and disaster relief work, perform other tasks assigned by the party committee and government, and formulate and revise emergency plans for street flood control and flood fighting.
(3) When a serious flood disaster occurs in the region, organize an emergency meeting on flood control and flood fighting, listen to the reports of rain, water and disaster situation of relevant communities and units, and arrange the deployment of flood control and disaster relief work.
(4) Unified command of flood control emergency work in the whole street, and organize relevant departments of the office to carry out flood control and disaster relief work in the affected areas in accordance with the responsibilities specified in this plan.
(5) Report the flood disaster and emergency work of flood control and disaster relief to the District People's Government and the District Flood Control Headquarters.
2.2.2 Main responsibilities of street flood control and flood fighting headquarters office
(1) Implement the national laws, principles and policies on flood control, and implement the decisions of the street flood control headquarters and the dispatching instructions of the superior flood control headquarters.
(2) master the water situation and disaster situation, issue flood forecast, warning and flood bulletin when necessary, and prepare disaster situation and emergency rescue and relief report.
(3) Responsible for coordinating, inspecting and supervising the flood control work of all levels and relevant departments within the jurisdiction.
(four) to organize the formulation of flood control plans, and to inspect and supervise the implementation of various flood control and flood fighting measures.
(five) to assist in organizing flood control teams and organizing the construction of flood control information systems. Supervision, inspection and implementation of flood control material reserves.
(6) Complete other tasks assigned by the street flood control headquarters.
2.2.3 Responsibilities of emergency rescue team
(1) communication and liaison group: xxx is responsible for internal and external communication and keeps in touch at any time. In the event of a flood accident, immediately contact the relevant departments for emergency rescue and report to the superior.
(2) Emergency rescue team: xxx is responsible for urban flood prevention propaganda, emergency rescue and personnel transfer. Be responsible for on-site emergency rescue, and ensure that emergency teams are ready for war at any time, and rescue vehicles and equipment are in good operation. In the event of a flood disaster, ensure that personnel and equipment are in place in time and rescue in time; The person in charge of the community in the flood-stricken area shall immediately organize the emergency evacuation of the people in the disaster area to ensure the safety of people and animals.
(3) Logistics material support group: xxx is responsible for the storage, management and supply of flood control materials according to the requirements of street flood control headquarters.
(4) Medical rescue team: xxx is responsible for rushing to the scene as soon as possible after the disaster, making rescue plans, rescuing the wounded and coordinating the hospital to treat the wounded in time.
(5) security team: xxx is responsible for maintaining public order in flood control, traffic road control and social order in disaster areas. In case of emergency, coordinate relevant departments to organize the evacuation and transfer of people; To crack down on criminals who steal the property of the state and residents, flood control and relief materials, and destroy flood control projects and flood control communication facilities; Do a good job in public security for flood control and disaster relief.
2.3 community, street area enterprises and institutions flood control headquarters.
Enterprises and institutions in various communities and regions under their jurisdiction should establish and improve the corresponding flood control and flood fighting headquarters, and divide the responsibility for flood control into various groups. Under the unified leadership of the street Party Working Committee and the flood control and flood fighting headquarters of the office, they will carry out their duties and cooperate closely to do a good job in flood control and emergency rescue work in their respective regions and units.
2.4 Duty system in flood season
All enterprises and institutions in various communities and jurisdictions should arrange the personnel on duty during the flood season, strictly implement the 24-hour duty system, maintain smooth communication, and prohibit the personnel on duty from leaving their posts.
3. Flood forecasting and early warning and material preparation
3. 1 forecast and early warning
According to the rainfall forecast issued by the Meteorological Bureau, the headquarters office gives an early warning: when there is a once-in-50-year flood (the rainfall reaches 193.5mm in 24 hours) or a once-in-a-century flood (the rainfall reaches 222mm in 24 hours), the emergency plan will be started, and relevant departments and units will be organized immediately to do a good job in personnel and property transfer and emergency rescue and disaster relief in flooded areas. Report the disaster situation and the progress of emergency rescue work to the superior flood control headquarters.
3.2 Disaster report
Disaster information should mainly include: the time, place and scope of the disaster, the affected population and people's property, transportation, post and telecommunications, hydropower facilities and other losses. Casualties and large property losses should be reported immediately after verification, providing accurate basis for disaster relief.
3.3 Material preparation
Flood prevention and rescue materials to be stored: rain boots, raincoats, woven bags, shovels, lighting equipment, life-saving equipment, transportation, etc.
3.4 Layout of transport vehicles
The logistics support group randomly picked it up.
3.5 Medical treatment, sanitation and epidemic prevention
Medical care and drug supply work by the street community health service center is responsible for. Deploy doctors and nurses with good health, high quality and rich experience to participate in emergency rescue, and at the same time do a good job in monitoring and disinfection to prevent various epidemic diseases.
4 publicity, training and drills
4. 1 public publicity and education
Various communities take measures such as printing and distributing publicity materials to carry out publicity and education on flood control, safety and self-help and obedience to unified arrangements.
4.2 Training and exercises
The street armed forces department is responsible for training rescue teams and related staff to improve rescue capabilities; Organize an emergency rescue drill once a year to ensure that the personnel and materials are in place and the rescue is timely and orderly after the plan is started.
5 rewards and punishments
5. 1 reward
Commend and reward advanced collectives and individuals who have made outstanding contributions in flood fighting and emergency rescue work.
5.2 Punishment
The relevant personnel who neglect their duties, get cold feet and refuse to carry out rescue orders in flood fighting and emergency rescue work should be investigated for responsibility according to law.
6 supplementary provisions
- Related articles
- Why is the weather forecast gone?
- How to describe a funny copy of cold weather
- Why does Apple Ink weather always show installation?
- Poems flying in the sky
- New Concept English Book 2 Lesson 25~27 Study Notes
- What do you think of 13-year-old girl who died of drunkenness and nine friends at the same table were accused of going to court?
- What plants are suitable for keeping indoors?
- The source of companion continent? What do you mean by waiting for companionship?
- What's the temperature in Heilongjiang in September?
- What are the geographical location and climate characteristics of Gladanton?