What are the renovation processes?
First, enter the sequence:
1 First, check the drawings and make clear the layout of the decoration objects (such as flushing walls, building walls and making furniture). ).
2. Pre-project: wall-beating, floor-beating, ceramic tile and old facilities demolition (according to the requirements of the site and the owner).
3. Hydraulic mobilization: arrange water supply and drainage positions and carry out construction (reasonable arrangement according to the requirements of the owner).
4. Electrician enters the site: fix the lamp position, lamp trough and pay-off (arrange reasonably according to the owner's requirements and engineering needs).
5. Masons enter the site: build walls, swing, lay floor tiles, stick tiles and install facilities.
6, check the prophase project quality:
Whether the masonry wall is straight and whether the floor tiles and tiles are flat, such as checking the corners of the floor tiles and tiles, at least triangular and aligned. Then, whether the gaps between floor tiles and between tiles meet the requirements of the company (the company has standards), and the laying of floor tiles and tiles is completed. After the cement is solidified, tap the brick surface gently with a small stick to see if it is empty. If found, correct it in time, and take certain measures to protect the brick surface after the quality is no problem.
Check whether the water supply and drainage is reasonable and whether the joints are tight, and there can be no leakage. Water supply and drainage should use as few joints and elbows as possible. After the installation of water supply, pressure test should be carried out to see if there is leakage.
Check whether the wire arrangement is reasonable, pay-off should take shortcuts as far as possible to save wires, whether the bottom joint is flat, whether the wire joint is reasonable and whether the pay-off is standardized, and arrange direct connection.
Laying procedure: elbow is arranged for elbow, tee is arranged for three forks, and redundant hoses (such as waterproof wax pipes and metal snake pipes, etc.). ), and it is required to install a lock at the bottom of the line.
Pay-off: 1) Lighting lamp, switch and copper conductor:15m2.
2) Copper conductor of socket: 2.5m2
3) Air conditioning circuit and water heater: 4-6 square meters.
4) General system: According to the room pay-off index (that is, how many lines are there), each air switch controls one line, and one or several leakage switches mainly depend on voltage (generally one leakage switch is arranged).
Second, carpentry began to play a role.
1, first review the drawings, what kind of furniture to make, how much to make, and measure the materials according to the furniture. At present, the commonly used boards for home decoration are: 15% core board, 12% plywood, 9% plywood, 5% plywood and 4% plywood.
2. Woodworking begins: first nail the sawing table, the ceiling and make the furniture frame. Basic dimensions of furniture:
Entrance: shoe cabinet: 28-30 cm deep
Master bedroom: wardrobe: height: flat ceiling
L: According to the requirements of the owner.
Depth: 50-55cm
Hall: TV cabinet: according to the drawings or the requirements of the owner, the TV cabinet will be made into an arc, with the widest point of 80 cm and the narrowest point of 40 cm, and the lines will be smooth and natural.
Study: bookcase: Gaoping ceiling
L: natural or owner's requirements.
Depth: 28-30cm
Desk: length: natural or owner's requirements.
Height: 60-70 cm
Width: 55cm-70cm or as required by the owner.
Wine cabinet: 40 cm wide or required by the owner, or constructed according to the drawings.
Kitchen: basement: height: 80 cm width: 55 cm
Stove: height: 60 cm width: 55 cm
Length: Natural or actual kitchen length.
Application of panels and lines:
At present, plate applications: waist line, nail line, semicircle line, flat line, corner line and lap line.
Waist line: used for door and window covers.
Nailing thread: used in door covers, window covers, book tables, TV cabinets, decorative cabinets and other application places.
Semicircular line: used in desks, porches and other places.
Flat wire: the application of various furniture sealing
Binding: Glass ceiling for dining room.
Corner line: it can be divided into inner corner line and outer corner line. According to the needs of the project, the corner line should cover the corner, entrance or other.
Note: The lines listed above are commonly used, such as modeling or using some flower lines and magic colored lines if the owner has special requirements.
Painter: When carpentry is 90% finished, the painter begins to brush oil. Note: When buying panels, the purchased paint and panels should be brushed two or three times after arriving at the construction site, and then twice after construction. At first, the panel was not standardized, and the nail holes made by carpenters had to be dried and polished, and then brushed two or three times. If the effect is good, start grinding the water mill, which is more difficult to complete. Mainly depends on the effect of paint. For example, after the water mill, the chef did a good job, that is, there was more meat. Even if it is finished, the handle should be installed after painting.
Material: Zhu Qing brand varnish: matte and high gloss, with Zhu Qingtian Na water and white water when the weather changes.
Grey fan: The grey fan and the painter enter the arena at the same time. Start to apply varnish on the ceiling to prevent cracking and shrinkage. Then apply latex paint, put a bandage between the gaps of smallpox, brush a layer of oil and start to fan the wind. If you encounter uneven walls or other conditions, deal with these problems first, and fan the dust to polish them, but wait until the painting is finished. At the same time of polishing, after exposure in the sun, check whether the wall surface is smooth after dust removal, and finally brush ICI(ICI is a kind of paint for the wall surface). Check that the dust fan is good, ICI brush is good, and the wall is flat. Hands are not allowed to stick flour to their hands. It is very important to check the edge, door angle and plaster line of the cabinet again. In particular, the plastering line after carpentry plastering will be uneven, so the plastering work must be finished, and the plastering line must require meticulous plastering work.
The above description is the whole process of general family decoration. Of course, according to the construction site, there are still many places to pay attention to. All aspects should be carefully checked and strictly supervised. The plumber who checks must be serious and responsible. Another thing to note is: negotiate with the owner first, and pay attention when talking with the owner. After mastering the basic knowledge, the foreman has to improvise and improvise. As a foreman, you should have a sense of decoration, a correct attitude towards decoration, and think about what the owners think, so as to manage a construction site well. In practical work, we should keep forging ahead, take the initiative to attack on the construction site, learn more and ask more questions (ask people familiar with the company's business). When the design is different from the actual situation, it should be discussed with the workers first. If it can be handled on site, the plumber can handle it on the spot. If the difference is too big, contact the business department and engineering department of the company and discuss with them. In addition, in the aspect of drawing review, it is necessary to clarify the company's intention, strictly follow the drawings, and also pay attention to the actual situation (mainly referring to the site). In the process of construction, we should think more, arrange all aspects reasonably, pay attention to the rationality of the overall effect, and give people a warm feeling of home.
Interior decoration procedure
Business owners apply to the community management office for decoration.
↓
Business owners should fill in the decoration application form carefully and accurately according to the requirements of the management office, and sign the responsibility letter.
↓
The management office provides the owner with the floor plan of the renovated house and indicates the layout of the load-bearing wall.
↓
The management office will submit the decoration application form to the company for approval on behalf of the operator.
↓
After the examination and approval is completed, the management office informs the operator to pay the decoration management fee and deposit to the finance department of the management company with the decoration application form.
↓
Carry out decoration. Before entering the building, the team can go to the management office to apply for permission to enter the building before entering the building.
↓
According to the requirements of the responsibility book and the decoration application form, the community management office regularly checks the safety, hygiene and safety operation time.
↓
Operators should actively rectify the problems detected by the management office, and will be punished according to the regulations if they violate the regulations.
↓
After the renovation, the quality supervision department of the management company and the community management office will conduct acceptance according to the contents and requirements of the responsibility book and the renovation application form.
↓
Refund the deposit after acceptance.
↓
Decoration application form and other related materials are archived.
- Previous article:Who knows where Changting Babaoshan is?
- Next article:Weather forecast for fairy mountain, Chongqing 15 days.
- Related articles
- Which city in Yunnan has the best climate?
- Thailand tourism and exchange of Thai baht
- You still owe me a "goodbye"
- How to use air conditioning control
- Does it always rain in Fuzhou? What's the weather like all year round?
- The south will enter the core period of cooling. Why is the temperature hitting a new low this year?
- When does the weather start counting from nine o'clock?
- Hot summer, summer resort, and my car Job to travel to Tianzhu Mountain.
- Shuangfeng weather in Hengyang
- Suggestions on improving haze weather