Traditional Culture Encyclopedia - Weather inquiry - There are five personal annual work summaries of quality inspectors.
There are five personal annual work summaries of quality inspectors.
Personal annual work summary of quality inspector 1
My name is _ _ _ _ _ _ _, and now I am a quality inspector in the project quality inspection department. I am mainly responsible for supervising the construction of the bridge team and controlling the site quality. 20__ years is an unusual year. We will work hard in this year to build a good one and win a battle to lay a solid foundation for the future high-speed market. While working hard, we should also summarize the work of the past year, make careful arrangements for the work of the next year, set goals and point out the direction for our work.
(1) Work:
1, aided project, first time as a quality inspector.
I was transferred to the project quality inspection department on _ _ _ _. I used to be a surveyor in the construction team, so I was not familiar with the work that quality inspectors should do, and I was not used to it when I first went. I used to watch others do quality inspection at the same time on the road every day and teach the construction technology of the outsourcing construction team. I knew that to do this job well, I had to be technically excellent. So when I set out, I went to the scene under the leadership of section chief Wang You during the day to help the outsourcing construction team set out. Mainly to release the location of bridges and culverts. Go back to the quality inspection department to study in the evening, get familiar with the drawings and some basic technical specifications, and ask other colleagues if you don't understand.
In the project, I learned the use of Lycra total station, which made me have a deeper understanding of survey construction lofting and contacted the lofting of small and medium-sized bridges for the first time. The first preliminary contact with the acceptance of subgrade crossing and the construction process of bridges, culverts and other structures.
This project is an aid project. Because of the tight schedule, everyone is working hard every day. Later, due to the limited personnel on my road, I managed a rubber-tyred pick machine and a chain-type head-making machine to deal with the rock stratum of subgrade drainage ditch. The terrain is mountainous, and some sections are afraid of being crushed by chain-type head-making machines, so it is also very important to use and allocate head-making machines in time. Under the guidance of Manager Kong and Wang You, I can make reasonable arrangements. When it's time to use the scooter, use the tray, and calculate which one to use to save money and save costs. In the project, I also wrote about indoor work (such as the information of drainage ditch and some ancillary structures), and I know it is also very important to write about indoor work. I want to study the drawings carefully and construct according to them reasonably.
In the middle period, he also managed the bridge crossing and aqueduct construction together with Zhou Li, and simply learned the aqueduct construction technology. Attention should be paid to every detail in the process of bridge construction, and the aqueduct should be connected with the local water system. It is very important to make good preparations according to local conditions. In recent more than half a month, the project is still a quality inspection work, mainly to supervise and guide the construction of the tail soil shoulder and help the construction team to do a good job effectively. Due to the lack of experience in the construction of soil shoulders, there were some problems in the process of cultivating soil shoulders, such as inconsistent width, ups and downs, and even failed to do it again. Later, I went to another section to see how the team led by Master Cao managed to make the earth shoulders look smoother.
In the process of lifting the earth shoulder, it also involves the transportation and measurement of earthwork. During the road construction period, only one section of subgrade is formed, and the cushion is completed, and then cement concrete and asphalt concrete are paved, which brings difficulties to earthwork transportation (the place to borrow soil is on the right side of the paved black road). In order to save costs and avoid too much dirt on the road, we thought of letting the construction team and the team use cars and buy some large plastic sheets to cover one side of the road. Although I am very nervous and tired every day in the project, I am full every day, which makes me learn a lot of work that I have never touched before, and also makes me know that I still have so many shortcomings, so I should study harder in my future work.
This project has achieved great success.
I came to the engineering quality inspection department in June, because the main bridge and the H ramp overpass started at the same time, and I was assigned to the bridge team, which was another great test for me who had never been exposed to the cast-in-place bridge work. I have never had experience in quality inspection of bridge construction before, which is really even more difficult! I have to start learning these pictures again. Compare the drawings with the actual situation. Ask Gao Yu if you don't understand, call Hao Gang and ask them for advice. During that time, I knew it was not easy to manage the bridge construction, especially when I was pouring concrete, I often had to work overtime until midnight at night, or even one night. I remember that when the K0+000 mainline bridge and the H-ramp overpass beam were poured, all the staff of our project department mobilized and took turns to be on duty day and night to supervise the whole process of concrete pouring, so as to avoid accidents in the middle and affect the construction and beam quality. Although it was very difficult, at the request of the owners, the two bridges were finally completed ahead of schedule, which did not affect the normal traffic of Le Yi Road. This also won honor for our Shen-Gao highway, and we can fight hard. Of course, while winning the honor, we still encountered many difficulties and problems in the construction process. For example, in the process of connecting the pile foundation with the tie beam, the length of the steel bar joint is sometimes not enough after welding by the construction team, and some stigma is not clean; After the corrugated pipe penetrates into the web, it is easy to burn the corrugated pipe when welding the positioning rib (there are still many problems encountered in the construction process, so I won't explain them one by one). These problems are so strange to me who participated in the quality inspection of cast-in-place bridge construction for the first time, and I will not pay attention to them during the construction. The only thing I know is to look at the number of steel bars tied by the construction team against the drawings, thinking that everything is going well. Manager Fang Lin and Master Gao Yu, who have many years of bridge work experience, reminded me of some possible problems in some links. Only then did we find the above problems and remedy them in time. In time, double-sided welding shall be carried out on the reinforcement with insufficient lap length, and the unclean stigma shall be cleaned with vacuum cleaner or washed with water for many times. The corrugated pipe leaked by electric welding should be wrapped with large transparent tape several times to ensure that the cement slurry does not flow into the corrugated pipe when the concrete is cast in place. In the next month, I worked as a bridge owner in the office, which made me familiar with the industry and taught me how to draw the plan of the bridge in convex-concave CAD. During the three months of the project, I have a preliminary understanding of the construction of cast-in-place bridge superstructure and bridge lofting, which makes me more confident to do a good job in bridge quality inspection in the coming year.
(2) Ideological aspects:
This year's work experience has made some progress in my mind and got rid of my previous laziness. However, there are still many shortcomings. Sometimes, I am not calm enough to deal with things, and I am not good at communicating with my colleagues. I hope I can hone myself more in my future work, improve my ability and professional level, strengthen communication with my colleagues, do things in a down-to-earth manner, and avoid detours in my future work. Ask more questions, learn more and communicate more when you encounter problems, so as to further mature your thoughts and lay a solid ideological foundation for future work.
(3) annual work plan:
1, do a good job in quality inspection, study drawings in spare time every day, write engineering daily report in time after work and report it to the engineering department. Every day, the construction team thinks about the next process after finishing the work that day to see if it can continue. In case of material shortage, we will report the situation to the leaders in time to avoid delaying the normal construction and do a good job in the service of the construction team.
2. As a young intellectual, we should actively play our role, do a good job of "passing on", "helping" and "leading" new graduates, straighten our position, have a positive work attitude, learn the spirit of "showing the sword", face new challenges, make unremitting efforts to complete things, and set a good example for new graduates.
3. To improve team awareness at work, we must treat the project as our own home and our colleagues as family members. There is no conspiracy, no dispute and no selfishness in the work. Help and care for each other in life. Don't look on coldly when colleagues have difficulties, and do your best to contribute to the success of the project.
These are the work I have done in the past year, the difficulties I have encountered in my work, the solutions, and some anatomy in my mind, including the work plan for next year. I hope I can make achievements, do a good job, control quality and improve service significance in this year. I think we will build this project into a "good, fast and excellent" quality project, and make a good start for Shenyang-Gaolu Expressway.
Annual work summary of two quality inspectors
20__ years passed quickly. In the past year, I fulfilled my duties and obligations dutifully. The following is my year-end summary of __ 18:
I. Personal summary
1, timely, as planned, with good quality and quantity to complete the task and its effect.
I joined the company's quality department in _ _ _ _, and I became the director of the company's quality department in _ _ _ _. Understand the notice of the company's superior leaders, strengthen the company's quality control, and complete the task on time with good quality and quantity. Although we have strengthened our efforts in our work, it is difficult to avoid product quality problems and delivery time problems in the production with a large number of customer orders. Or bring inconvenience to the company. In February, 65438, the agent complained that the quality of our down products was serious, and a down jacket ran down, so it was embarrassing to communicate with customers. Maybe customers will doubt the quality and attitude of our products. After the superior leaders of the company came forward, the quality problems were solved, which also taught us a profound lesson as high-quality employees. A small mistake in the work has caused quality problems, which will bring a very bad impression to customers and greatly reduce the image of the company in the eyes of customers. Product quality is the premise of company brand effect. The quality work of the company's clothing products is of great responsibility and arduous task. In the future, the quality work of the company will be promoted to a new height with the sense of responsibility and mission of serving the company's economic development.
2, failed to achieve the planned objectives and tasks and its implementation plan.
In half a year's work, there are still many shortcomings in the work. Learn from superior leaders and colleagues in batch processing and receiving standard errors. Some of my own shortcomings also bring some troubles to leaders and customers. During my six months in the company, I learned the knowledge of quality control. The clothing industry is constantly changing and upgrading, so we should consult other clothing customers, professionals and company leaders, learn better professional skills, improve ourselves, and give full play to what we have learned in future work. Let the future work progress more smoothly. Minimize mistakes. Dare to take responsibility, dare to take responsibility, and work together with professionalism to win.
3. Unplanned tasks and their completion
At work, we must first make our own work plan. For example, mistakes in batch audit and careless inspection will bring losses to the company or customers. No matter what position you are in, you should make a weekly plan, complete the work of the day and make a plan for the next day. Avoid unnecessary losses at work. Be cautious in everything at work, ask colleagues and leaders for questions that cannot be clearly explained at work, and try not to increase the workload for leaders and other colleagues. I also want to improve myself in this respect. Outside of work, you should communicate and learn more with colleagues and leaders, so that you can help yourself better at work.
Second, personal career development planning
On the road of career development, what matters is not my position. There are no blank spots in different positions. Any job is a kind of exercise, and it may be a failure. Failure is also an opportunity. No matter where you are, you should know yourself and take the initiative to learn everything. There is no benefit in being negative. In the concept of work growth, there is no unfair treatment, only unfair skills. There are no unfair skills, only unfair learning. Don't get carried away, study harder. On the concept of development, it takes personal retirement from the company as the guiding ideology and the overall situation as the core to consider. Career planning is very important, and work should be prepared. Goal: Plan early and finish the task early. Every detail cannot be ignored. Planning is just a goal. You must be careful if you want to achieve your goal. One is error, the other is laziness, and it is the natural enemy of the target. There are still some shortcomings in our work. We expect the company leaders to provide a better skill platform, so that we can have better skills to complete next season's tasks, and at the same time make progress together with the company to bring our products to a new situation.
Annual work summary of three quality inspectors
The new year is coming. On the occasion of bidding farewell to the old year and ushering in the new year, I would like to report to the leaders on my work in the past year, so as to extend my most sincere New Year wishes to all of you, wishing you good health and all the best in the new year! In the past year, with the support of the company and the project department, I worked as a full-time quality inspector in China People's Bank Chongqing Branch and now Sunshine 100 Project Department.
In the past year's construction, with the care and help of many predecessors in the project department, my work has made great progress. In the company's monthly quality evaluation, I won six winning red flags. Of course, my achievements only represent the past, and I will redouble my efforts to do better in my future work. Briefly sum up the following points, please correct me: the pragmatism of the work.
I learned from books before that "scientific things can't be hypocritical and proud." In engineering, especially special structural engineering or high-rise buildings, the technical content is high, which requires our quality inspectors to treat quality inspection work with a down-to-earth and rigorous attitude, be good at learning what they don't know and constantly improve what they know, because technology is constantly improved and updated. Only through continuous learning, supplemented by pragmatic and practical style, can we be competent for the work. Vision at work
All engineering construction, quality inspection work throughout, in the accumulation of work experience, gradually cultivate their own foresight, can play a leading role in technology, such as in Sunshine 100 project department 9# building to control floor cracks, first take out measures to prevent common faults, such as controlling the time of people and materials, pulling mortar to compact the floor in a certain period of time, mastering the time of formwork removal, and doing a good job of maintenance, so that the building has been up to now. Of course, in the process of pouring the first few layers, due to the untimely delivery of concrete by the concrete company and the high temperature, some cold joints appeared. In the future work, I will constantly sum up the past experience and lessons, cultivate the foresight in my work and apply it to the project. Cultivate the spirit of hard struggle
The construction industry is different from other industries. It needs constant on-site inspection and supervision in order to find and solve problems at any time, and these works are carried out in the harsh environment on the spot. This requires us to constantly cultivate the spirit of hard work, not afraid of hardship and fatigue, let go of the lofty attitude of managers, and constantly enrich our learned talents from the actual work of the project, so that our on-site comprehensive processing ability can be exercised and improved.
Finally, strengthen the cultivation of their comprehensive quality.
As a member of _ _ company, I feel extremely proud to have the opportunity to study and exercise in such a large-scale market in Chongqing. This kind of environment and external conditions give us a sense of self-confidence and glory, but it is more of a spur to our future work, requiring us to restrain ourselves with the corporate image of _ _ _ at all times in our work. All our words and deeds must conform to the standards of _ _ super enterprise, and gradually cultivate our own personal qualities and self-cultivation in order to be worthy of leadership. The above is a simple summary of my project construction this year. Please also ask leaders to criticize and correct me. In the new year, I will redouble my efforts and constantly improve my overall quality. Under the leadership of the company and the project department, I will continue to explore and innovate in the construction of Sunshine 100, and make Sunshine 100 a brand of _ _. Finally, I firmly believe that with the vigorous development of _ _ and the careful training of company leaders, our technicians will grow rapidly and make due contributions to the development of the company.
Annual work summary of four quality inspectors
Time flies, time flies, and 20 years have passed in a blink of an eye. Looking back on this year, as an inspector in the company's quality department, I have made a lot of progress, but there are also some shortcomings. Over the past six months, with the care and guidance of the leaders and the support and help of my colleagues, I have not only diligently completed my job, but also improved myself in all aspects. In order to do better in the future, sum up experience and learn lessons, I have summarized the work in the past six months as follows:
1, you must do things in four words: be careful. Because the quality and quantity we do are related to the normal operation of the whole company's production work. If the quality of work goes wrong somewhere, the interests of the company will be affected, which will definitely cause a lot of harm. The production workshop will also stop production because of quality problems; In this way, the failure to deliver the goods on time on the delivery date will inevitably lead to customer complaints, reduce the company's reputation and cause immeasurable losses to the company. So I try to keep a clear head when I work every day, make sure everything is accurate and improve my work efficiency to the highest point.
2, the interpersonal relationship between departments must be handled well in the work. One person's strength is limited, but the strength of a team is enormous. In the process of work, it is sometimes inevitable for colleagues to bump into each other, but I always treat these problems with a peaceful attitude, find out the key points of the problems, eliminate misunderstandings and resolve contradictions, thus creating a harmonious working environment. Only when you are in a good mood can you exert your greatest potential in your work. The most important thing for a team is that Qi Xin works together. Only by doing this can the company develop better and better.
However, I also have my own shortcomings. For example, I will also make mistakes in my work because of carelessness, which will bring unnecessary trouble to my work. In the future, I will finish my work seriously with a rigorous working attitude. On the basis of completing the tasks assigned by the leaders, we will give full play to our own advantages, continue to strengthen the study of professional knowledge, and further improve various inspection skills.
In the new year, I am determined to seriously improve my work level and contribute to the development of the company. In the future work, we should learn from other colleagues with an open mind, learn from good working methods, and constantly improve our own quality, so that our comprehensive quality can be improved to meet the development of the company and the needs of society. It is necessary to further strengthen the professionalism, enhance the sense of responsibility and improve the level of work completion.
Summary of personal annual work of quality inspector 5
20 years passed quickly, and it took me another year to grow up in a blink of an eye. Looking back on the past year, I got a lot of help from you and learned a lot from you. The biggest feeling in my heart this year is that it is not difficult to be a qualified inspector, but it is not so simple to be an excellent inspector. This year's work is summarized as follows.
First, the ideological aspect.
I think a good quality inspector should not only be modest and upright, but also be conscientious in his career and work. We should also improve our ideological, political and work skills. As a young quality inspector, I still have a lot to learn. As a quality inspector, I always feel a great responsibility on my shoulders. So in practical work, I always strictly demand that I be cautious. First of all, we should always take the quality policy as an indicator to clarify the product quality responsibility.
Second, the work.
At work, I devote myself to studying other products, and read more product drawings in my spare time, so that I have a certain understanding of the principle and performance of product drawings and structures. And listen to the experience carefully and record it carefully. In the future work, I will redouble my efforts to learn professional knowledge, master a variety of skills, achieve multi-skills, make up for the shortage of manpower when the workload is heavy, and ensure the normal operation of the department.
Correct yourself through the criticism, help and efforts of leaders and colleagues, and never allow yourself to fall twice in the same place. It is precisely because I am not proud in the face of victory and do not bow in the face of failure that I will grow and improve rapidly in my struggle. In addition, the train runs fast by the headband, which has many shortcomings in working ability and thinking. In these aspects, I got the correct guidance and help from the department leaders and employees, which improved my working ability, made my direction clear and corrected my attitude. Therefore, it laid a good foundation for my development.
Third, study.
Through this year's work, I am lucky to learn a lot. But this is far from enough, especially in terms of diversified skills. At the same time, with the increase of the company's business and the development of new products, we can expect that our work will be more arduous, the requirements will be higher, and the knowledge we need to master will be higher and wider. To this end, I will devote myself to my work with a brand-new mental state, work harder, study harder, and strive to improve my work skills and work efficiency. Do a good job and make due contributions.
Now I am assigned to the _ _ experiment, which is a good opportunity for me. Recently assigned to _ _ District for training. In the first few days, I watched every step made by the masters every day, became familiar with the works, and got to know the process of the works in my heart. The masters also began to let us practice, cutting a solder joint and weld first, followed by the part to be cut.
Over time, I encountered many problems and shortcomings in practice. Through the explanations of the masters, I gradually became familiar with this job, and sometimes I learned about it through some materials. Now is just the beginning, and there will definitely be many difficulties in the future, so I will continue to study hard, communicate with my colleagues and sum up my work, which will be of great help to myself.
On the whole, I have gained a lot this year. I learned a lot that I couldn't learn, but I also learned a lot. I have an attitude towards my work and a sense of responsibility. In the new year, I will study harder and treat my work positively, not seeking the best, but seeking better.
There are 5 articles about personal annual work summary of quality inspectors:
★ 5 annual work summaries of quality inspectors.
★ 5 summaries of inspectors' annual work in 2020.
★ Personal Annual Work Summary General Edition
★ Summary of personal work of quality inspection department at the end of 2020: 5 articles.
★ Five summaries of personal work of quality inspectors
★ Five articles about the work of quality inspectors.
★ Five selected model essays on the work summary of quality inspectors.
★ Inspector's annual work summary 5 articles 2020
★ The latest five personal work summary model essays general edition
★ 5 annual work summaries of factory quality inspectors.
- Related articles
- The weather in Langfang next week
- Fishing skills of large reservoirs in winter
- What can I use instead of hair gel and wax to help my hair set? Daily necessities
- The reason why the weather in northern Heilongjiang is cold and long
- How to distinguish the weather in different seasons?
- Ask for information about "the influence of geographical environment factors on international trade"
- (2r93? Yongkang City Simulation) 2RR 9 Since September 9, 2009, the northern and central and western regions of China have ushered in rare snowstorm weather, which has brought serious problems to the
- What does a cloud and lightning mean in iphone weather?
- Regulations on restrictions on travel in Changyuan City, Xinxiang in 2022 (latest notice on restrictions on travel in Changyuan City, Xinxiang in 2020)
- How to prevent insects from growing in the trash can in summer?