With the popularization of legal knowledge, the frequency of using contracts is on the rise. The purpose of signing a contract is to protect the interests of both parties and avoid unnecessary disputes. I believe everyone is worried about writing another contract. The following is the rural entrusted housing contract I compiled for you, hoping to help you.

Rural entrusted building contract 1 Client: (hereinafter referred to as Party A)

Trustee: (hereinafter referred to as Party B)

Party A can't build the house at home because of his busy work outside. In order to save money, Party A should handle the adjacent property rights reasonably. In order to cooperate with the construction of Building A in the residential area and make the construction of Building A efficient and frugal, Party B is specially entrusted to manage and operate in a unified way. Based on the principles of legality, voluntariness and equality, both parties reach the following agreement:

1. The house is located opposite Qianyang Village, Yun Dan Township, Yongtai County.

2. The construction unit of Building A is designated and recognized by ten owners of Building A (steel-concrete structure, with the cost not exceeding 95 10 yuan per square meter). According to Party A's instructions, Party B is responsible for the operation of building affairs and coordinating the property rights relations of related neighborhoods and adjacent areas.

3. Party B is responsible for paying the wages of construction personnel according to Party A's instructions and ensuring timely payment.

4. Party A has the right to know the monthly housing construction progress and housing fund operation, and Party B must inform Party A of the above situation at the end of each month.

5. Party A must remit the operating funds of the building to Party B's account in time and in full (including the salary of Party B's management personnel).

Six, a construction time, from the beginning of the construction must be completed within six months. In case of weather force majeure, national policies and other reasons, it can be postponed through consultation between both parties.

Seven. During the operation and management of Party B, Party B has the right to sign and collect legal documents and other relevant special rights.

Eight. This contract is made in duplicate. If there is any supplementary contract, it shall be deemed as valid as of the date of signature by both parties.

Party A:

Party B:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Rural entrusted housing contract 2 Party A:

Gender:

ID number:

Current address:

Party B:

According to the national new rural construction policy and the actual situation of the village, Party A has built new farmhouses on the slopes of Groups 7 and 8 of Haoziling Village. Based on the principle of mutual benefit, Party A and Party B reach a consensus on construction matters, and hereby conclude this contract:

1. Building structure: brick-concrete structure. The building is built according to the drawing standards of the design institute, and the detailed construction area is subject to the actual area.

Second, the apartment is divided into type A and type B. Type A is approximately square and type B is approximately square.

3. The building price of the house is 800 yuan per square meter, with a total of RMB for Class A and RMB for Class B. ..

4. Party A pays Party B the down payment of 50,000 yuan for building (the registration number is subject to the payment form specified by Party B); The order of house selection is to pay the deposit first (subject to the date of the bank payment slip), and the houses are arranged in order.

5. After the signing of this contract, Party A and Party B shall not break the contract halfway, otherwise they will be fined RMB 10000.

The intransitive verb obligations of Party B:

1. Steel, cement, bricks, etc. Party B must design, purchase and construct the house in strict accordance with the drawings of the design institute.

2. Housing quality and safety shall be implemented in accordance with the contract signed by the village and the construction contractor.

3. Party B must ensure that steel bricks are pasted on the front facade of each household, colored tiles are installed on the roof slope on the third floor, aluminum alloy is installed on the front facade on the first floor, and anti-theft nets are installed on the first floor (the prices of aluminum alloy, anti-theft nets and steel bricks are on the middle side of the market price). The price of the door with specifications of 1.8× 2.7m per household is in the middle of the market price. The second and third floors of windows are installed with aluminum alloy, and the downspouts are installed in front and back of the whole house (see the fa? ade matching of the design institute drawings for details).

4. Party B is responsible for outdoor apron, roof drainage, septic tank, back ditch drainage and other supporting facilities.

5. Between the door of each household and the cement hardened road in the middle, Party B completes the laying of colored bricks, ditches and other facilities, and the colored bricks in front of each building must be laid in a line.

6. When the house is delivered to Party A for use, Party B must complete all required projects. The warranty period of Party B's house is years (from the date of acceptance by Party A and the village committee). If Party B is responsible for the rework and maintenance due to quality problems, Party A will not be responsible, but Party B will not be responsible for the quality problems caused by Party A. If there are major quality problems in the house, Party B will unconditionally refund the purchase price paid by Party A and impose a fine of RMB 10,000 only.

Seven, Party A must obey the unified management of the village committee after moving in, and shall not change the appearance, shape, structure and public facilities in front of and behind the house without authorization. Party A shall not transfer the house to other villagers within five years after purchasing the house, otherwise the village has the right to collect land compensation fee of 15000 yuan.

Eight. Payment terms:

1. When both parties sign this contract, Party A shall pay Party B a deposit of 50,000 yuan.

2. When Party B finishes building the third floor of the house, Party A shall pay 60% of the total house price (including down payment), and the farmers who have not paid 60% shall pay Party B the bank loan interest rate (9% 6 interest) according to the arrears, and the interest shall be calculated from 15 days later.

3. When Party B delivers the house to Party A for occupancy, it shall pay 20% of the total house price (i.e. 80% including two items) when it takes the key. After 65,438+05 days, Party A's interest shall be calculated according to the bank loan interest rate of 9%.

4. Leave 20% of the remaining amount as the down payment for the house payment, and pay 10000 yuan in the next year. If there is no housing quality problem in the remaining three years, Party A will pay unconditionally, and the remaining money will be paid in the second year after Party A moves in. Otherwise, Party A will be charged the interest of the bank loan rate.

5. Farmers who are willing to pay off the house payment in advance can enjoy a discount of 1000 yuan.

Nine. When Party A needs to handle all kinds of house certificates, the expenses shall be borne by itself, and the village committee shall assist in handling them.

X. Matters not covered in this contract shall be settled by both parties through consultation.

XI。 This contract is made in quadruplicate, one for each party, one for the village committee and one for the notary office. This contract shall come into effect after being signed by both parties and shall have legal effect.

Party A (signature):

Party B (signature):

Witness:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Rural entrusted housing contract 3 Party A: (hereinafter referred to as Party A) Party B: (hereinafter referred to as Party B)

According to the spirit of the 9. 19 special office meeting on reconstruction and reconstruction of dangerous buildings after the disaster and the Agreement on Entrusted Building signed by Liangshan Village Committee of Hualong Township and the villagers, this contract is hereby signed by the owner of our village and through mutual consultation, in order to improve the living environment of the villagers, save land and ensure the project quality, progress, construction safety and overall effect.

1. Principle of honesty and trustworthiness: Party A is willing to contract to Party B the housing construction project in the concentrated residential area after the disaster reconstruction and reconstruction in September 19 according to the needs of villagers for building houses. The specific number of houses to be built shall be subject to the number of down payment sets (but not less than 20 households).

2. Huxing and construction area: two households jointly build * * * walls and go upstairs separately. The second floor building is a household with a total construction area of about1.92m2..

3. House price: two-story apartment 1.92㎡, with a total construction amount of RMB one hundred and thirty thousand Yuan only (in figures: 654.38+300,000 Yuan). Including the main building project cost, land compensation fee, young crops and bamboo seedlings fee, earthwork excavation, with a total of 10000m (note: if it exceeds 10000 m3, it is calculated as per cubic meter 13 yuan), the foundation elevation of the building is 80㎝ (note: if it exceeds 80㎝), and the foundation depth is

Four, housing construction standards:

1, the height of the first floor is 3.3m, and the height of the second floor is 3m.

2. For foundation works, Party B and the constructor are only responsible for 80㎝ brick strip foundation (including plus or minus zero). For the ultra-deep foundation, Party B can choose the brick strip foundation with 50cm opening or excavated pile foundation according to the engineering quantity, engineering quality and construction safety. The calculation method and cost source of the ultra-deep part shall be implemented in accordance with Article 3 of this Contract.

3. Masonry works: the bearing wall is a 240mm thick shale brick wall, and the non-bearing wall is a 180mm thick shale brick wall. Mix mortar according to national construction specifications and design requirements.

4. Reinforced concrete coagulation project: concrete strength grade: ring beam and constructional column are C20, main reinforcement is Grade II steel bar, stirrup is Grade I steel bar, reinforced concrete protective layer is 2.5cm, a ring beam and a layer of ring beam are set, stirrup spacing between ring beam and constructional column is 20cm. The constructional column and the masonry surface of the wall should be reserved for jointing, step back first and set Rachel reinforcement.

5. Indoor plastering project: the interior is a clean room, the interior wall is plastered with cement mortar, the ceiling is plastered with cement mortar, and the bottom floor is 3cm-5cm flat with fine stone concrete. The second floor is leveled with fine stone powder cushion.

6, the exterior wall according to the unified style.

7. Drainage works: Each household is equipped with bedpans and septic tanks, and the drainage is connected to the septic tanks.

8. Doors and windows engineering: the entrance door is a security door, the other rooms are left with openings, and the windows are plastic steel windows.

9, other specific practices and construction quality according to the drawings.

Verb (abbreviation for verb) is the responsibility of both parties.

(1) Party A:

1. Party A is responsible for adjusting the land, assisting Party B to solve some contradictions in the construction process, and coordinating to solve problems such as construction water, electricity and building materials stacking.

2. Party A is responsible for setting up an engineering quality supervision team to supervise the engineering quality of Party B. ..

3. If the building foundation exceeds 80㎝, Party A shall settle the actual engineering quantity with Party B according to the provisions of Article 3 of this contract, and Party A shall be responsible for sharing and collecting it with all building users.

4. If the earthwork volume exceeds 65,438+00,000 m, Party A shall settle the account according to the actual engineering quantity according to the provisions of Article 3 of this contract, and Party A shall be responsible for distributing the money to all building users and collecting it.

5. Party A is responsible for collecting all the building funds payable by the users of the building and making payment according to the payment schedule agreed in this contract.

6. For the sake of construction safety, the on-site supervision of the owner's representative of Party A must enter the construction site under the unified organization of Party B, otherwise, Party A and the owner shall be responsible for the safety accidents caused thereby.

(2) Party B:

1. Party B must carry out the construction in strict accordance with the construction drawing, and the construction quality meets the requirements of relevant national codes to ensure the engineering quality is qualified.

2. Party B must carry out the construction according to the unified planning location and planning, and shall not change it at will.

3. During the construction period, Party B shall strengthen management, conduct civilized construction, and properly stack building materials. There will be no safety accidents. In case of any safety accident, Party B shall be responsible for all the consequences.

According to the requirement, Party B must finish the project before the end of August this year. Party A will reward Party B 10000 yuan for completing the project tasks on time; If the project task is not completed within the time limit, Party B will be fined 20,000 yuan for every ten days of delay.

5. If Party B continuously neglects to stop work for one month, it will be deemed as an automatic abandonment of construction, and Party A has the right to treat it as an automatic exit, and all losses caused thereby shall be borne by Party B..

6. Party B shall consciously accept the supervision and management of Party A. ..

7. When signing the contract, Party B shall pay a performance bond of 50,000 yuan to Party A, and Party A shall return it to Party B in full after the project is completed.

Terms of payment for intransitive verbs:

1. Party A, Party B * * * and the entrusted township finance office shall uniformly supervise the house payment paid by the house user and uniformly allocate it according to the contract.

2. Party A shall pay in installments according to Party B's construction progress. The down payment is calculated as 15% of the total house price; The second payment is 30% of the total house price after the first floor of the building is completed; The third payment is 30% of the total house price after the completion of the main house; The fourth payment is 23% of the total house price after the house is completed and accepted, and the remaining 2% of the house price will be paid one year after the main house is completed, unless there are quality problems. This building is entrusted by farmers, similar to self-construction, and Party B does not bear all taxes.

7. Construction period: 20xx will enter the site before May 15 and deliver the house before the end of August (in case of irresistible natural disasters and special circumstances, the time will be postponed).

Eight. Liability for breach of contract: both parties shall consciously abide by this agreement and shall not breach it. If one party breaches the contract, it shall pay the other party a penalty of 50,000 yuan.

Nine. This contract is made in triplicate, one for each party and one for the town government. This contract shall come into force as of the date of signing.

X. Matters not covered in this contract shall be settled by both parties through consultation.

Party A (seal): _ _ _ _ _ _ _ _ _ _ Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Representative (signature): _ _ _ _ _ _ _ _ _ ID number: _ _ _ _ _ _ _ _ _ _ _ _ ID number: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

;