Emergency Plan for Typhoon Prevention (Selected and Practical)
Emergency plan for typhoon prevention (I) In order to reduce the losses caused by natural disasters, prevent the occurrence of major unexpected dangers, and ensure the safety of life and property of enterprises and employees, a typhoon prevention and flood control working group is specially established:
(1) Organizational structure and responsibilities
1. Chief Commander: The general manager of the company is mainly responsible for the personnel arrangement of typhoon prevention and flood control organizations and the overall arrangement of typhoon prevention and flood control work.
2. Team leader of typhoon prevention and flood control: the person in charge of the comprehensive office is fully responsible for typhoon prevention and flood control during typhoon prevention and flood control, timely adjust personnel and materials as needed, and inform the commander-in-chief and the competent government departments within 24 hours.
3. Members of typhoon prevention and flood control team: obey the arrangement of the leader of typhoon prevention and flood control team, and do a good job of typhoon prevention and flood control under the leadership of the operation chief.
4. Logistics support: responsible for logistics support during typhoon prevention and flood control, and organizing personnel to evacuate safely in case of emergency. During typhoon prevention and flood control, as a temporary command center, it is responsible for external communication with government departments and supervisors to ensure timely and accurate information transmission.
5. Power group: responsible for normal power supply and power generation at any time during typhoon and flood control.
6. Equipment group: responsible for the normal operation of all typhoon and flood prevention equipment, and also responsible for the maintenance of factories and other places in urgent need.
(2) Hazard identification and risk
Whenever the typhoon flood season comes, according to the forecast of the meteorological department, determine the emergency response level of the enterprise in time:
1, yellow warning (mild): Typhoon below magnitude 6 can operate normally.
2. Red warning (moderate): For typhoons with magnitude above 6 and magnitude below 8, the leaders of all departments are on duty, and the warehouse organizes some personnel to participate in emergency disaster prevention.
3. Black early warning (height): In case of typhoon of magnitude 8 or above, the company will stop operation and fix various equipment and facilities. Irrelevant personnel should be evacuated from the site, and leaders at all levels should take the lead in participating. It is necessary to organize all personnel to work closely together under the leadership of the commander-in-chief and go all out to do a good job in typhoon prevention and flood control.
4. Key prevention parts of the enterprise: staff quarters, various areas of the company, various types of equipment, high-voltage distribution room, office, financial room, etc.
(3) Conditions for starting the emergency plan
1. All employees of the enterprise have the right and obligation to report to the enterprise leaders at the first time when they know that the disaster weather is coming.
2. Team leader of typhoon prevention and flood control: according to the actual situation, announce the level of emergency plan, confirm personnel, do a good job in typhoon prevention and flood control, and report the progress to the commander-in-chief at any time.
3. Under the unified arrangement of the team leader, typhoon prevention and flood control work should closely cooperate, support each other, communicate information in time, and report directly to the general manager in case of special circumstances.
(4) Emergency equipment and facilities
1. emergency command center: during typhoon flood control, it is guaranteed that someone will be on duty 24 hours a day, with convenient communication and 4 walkie-talkies.
2. The power distribution room, materials and electric power departments are on duty 24 hours a day to ensure power supply. Materials are equipped with shovels, pumps, raincoats, flashlights, sandbags, etc. , easy to use. There are also many cars and trucks that can be called at any time when needed.
3. For special emergencies, you can ask for help from the local 1 10 or 120.
(5) Emergency skills and resources
1. The emergency command center is close to the company's production office area, with fast and convenient information transmission and high management efficiency.
2, once the rainstorm comes, post management personnel received instructions, must quickly and timely send typhoon prevention and flood control materials to key parts, and prepare for disaster in advance.
3. During typhoon prevention and flood control, all communication equipment will be turned on 24 hours, and the telephone lines of the command center and warehouse will be connected directly, and all instructions will be understood at any time and stand by at any time.
(6) Protective measures
1. During typhoon prevention and flood control, the security personnel will be mainly responsible for the security work of important parts of enterprises such as the finance department and organize personnel to evacuate safely in time.
2. The logistics department is mainly responsible for the evacuation of temporary places to ensure the normal supply of food.
(VII) Information release and employee education
1, according to the actual situation of each stage, the typhoon and flood prevention team leader will release relevant information in various forms through normal channels after being approved by the chief commander.
2. We should increase awareness of prevention in publicity and education at ordinary times. When we enter the pre-plan state, all the work will be carried out under the unified command of the typhoon and flood prevention team leader.
3. According to the weather forecast data, employees are required to avoid passing through the tuyere on their way to and from work.
(eight) targeted training and drills.
1. Mobilize all employees of the company and train front-line employees of the company every x months. Training subjects include: sandbag, generator test, material dispatching, emergency repair, equipment protection, personnel rescue, security and so on.
2. In order to consolidate the training results and enhance employees' awareness of typhoon prevention and flood control, organize employees to conduct drills before the flood season every year to improve the comprehensive ability and team spirit of enterprises in typhoon prevention and flood control.
(nine) the method of continuous improvement of emergency plan
The team leader of typhoon prevention and flood control should record the drill site of each employee, correct the underestimation in time, adhere to the good aspects and promote it.
Emergency plan for typhoon prevention (II) 1. Guiding ideology:
Preventing typhoon and rainstorm is an important work related to the life safety of teachers and students and the safety of national property. In order to effectively protect the safety of teachers, students and property, and improve the ability of kindergarten to deal with flood prevention and typhoon prevention, this plan is formulated in line with the principle of "prevention first, safety first".
Second, the prevention steps:
1, list of leading groups and contact telephone number
Team leader: director of the park.
Team members: logistics team leader, education director and trade union chairman.
The kindergarten started the typhoon prevention and flood control plan, and implemented the 24-hour leadership duty and duty system.
Third, emergency measures:
1, strengthen information communication, so that the upper situation is issued and the lower situation is reported.
When there is a big flood, all the leaders are in place, and the leading group for flood control and typhoon prevention begins to operate. The leaders in charge report the disaster to the leading group for flood control and typhoon prevention. Fully deploy typhoon prevention and flood control work.
2, prevention first
1) Clear corridor. Before the typhoon lands, it is necessary to clean up the sundries and flowerpots on the balcony and corridor to prevent people from being blown away by the wind when the typhoon lands.
2) Close the doors and windows. When typhoon and rainstorm come, the wind is strong and the rainfall is heavy. Close the doors and windows to prevent the wind and rain from damaging the doors, windows and furniture and causing casualties.
3) The doorman will try his best to dredge the sewers and main collecting wells of the whole school.
4) Dredge drains and downpipes on school buildings, and prune and reinforce school trees.
5) Conduct a comprehensive safety inspection on the lightning protection facilities and outdoor wires of the whole teaching building.
6) Conduct a comprehensive safety inspection of outdoor antenna, outdoor unit of air conditioner and plug-ins.
7) Conduct a comprehensive inspection of indoor power supply, sockets, doors and windows of all departments.
8) If the circuit and wires are interrupted due to typhoon, turn off the power switch in time and turn on emergency lights, flashlights or candles for lighting.
Fourth, safeguard measures:
After the plan is started, kindergartens should make early warning and record information. Hold an emergency meeting, in the shortest possible time, deploy the kindergarten flood control and typhoon prevention work by telephone, inform the typhoon flood dynamics, and arrange the requirements and tasks of flood control and typhoon prevention, emergency rescue and disaster relief.
Keep close contact with superior departments and units at any time, strengthen information communication, and ensure information release and reporting.
Emergency plan for typhoon prevention (3) 1. The guiding ideology of disaster relief against Taiwan;
Under the unified leadership of xx District Education Bureau, the typhoon prevention and disaster relief work of our school aims at reducing the loss of state property and the safety of teachers and students, minimizing losses, effectively ensuring the safety of life and property of the school and teachers and students, and maintaining the normal teaching and living order of the school. Based on the principle of giving priority to typhoon prevention, supplemented by assistance, according to national laws, regulations and related policies, combined with the actual situation of our school, we have formulated an emergency plan for typhoon prevention.
Second, set up an emergency working group:
School typhoon prevention leading group: xxx.
Members: All teachers.
Three, the main points of flood control:
1. Teaching building, multi-function hall, canteen, gymnasium and other buildings.
2. Ensure smooth drainage inside and outside the school.
3. Strengthen the traffic guidance for students going to and from school in typhoon, rainstorm and thunderstorm weather.
4. Improve the ability of teachers and students to protect themselves from sudden weather changes (storms, thunderstorms, lightning, etc.). ).
Fourth, the preparations before the typhoon:
1. mental preparation: through various propaganda tools and forms, vigorously publicize the knowledge of flood control and disaster relief, educate teachers and students, and fully understand the significance of flood control and disaster relief. Resolutely overcome the paralysis of fluky psychology, establish the idea of "believing in what it has, but not believing in what it has" and the view of "standing if you give it, and wasting it if you don't give it", and always be ready, always be ready.
2. Organization preparation: establish the responsibility system for typhoon prevention inspection, clarify responsibilities and tasks, do a good job in safety inspection before typhoon, and make suggestions on problems and hidden dangers found in inspection. Attach great importance to typhoon prevention and disaster relief, strengthen typhoon prevention duty and safety inspection, implement various typhoon prevention measures, ensure smooth communication, and establish a supervision mechanism.
3. Work preparation: strengthen the inspection of all kinds of flood control, flood control and windproof work, rectify the problems within a time limit when found, attach great importance to school safety during the typhoon, carefully investigate various safety hazards, and ensure the safety of teachers and students' lives and property.
4. Material preparation: according to the requirements of emergency rescue in possible danger, prepare emergency materials and equipment in advance for emergency use. Strengthen the inspection and supervision of key parts of typhoon prevention, and have sufficient emergency repair force during typhoon to effectively prevent flood emergencies.
Verb (abbreviation of verb) Emergency response to typhoon prevention and disaster relief:
1. After receiving the notice from the higher authorities to prepare for emergency typhoon prevention, or according to the impending disaster caused by typhoon, the school immediately started the typhoon prevention and relief system, arranged disaster prevention work, entered the emergency state in an all-round way, and did all kinds of emergency work well.
2. According to the actual situation of typhoon prevention and disaster relief in our school, organize the implementation of emergency response work plan, carry out typhoon prevention and disaster relief work in our school and carry out rescue operations according to the establishment of typhoon prevention and disaster relief institutions.
3. During the whole typhoon, the principals of each campus will arrange for the team members to take turns to be on duty at school, and the duty personnel and duty leaders should be in place in time. The personnel on duty should patrol the campus frequently, and report to the principals and relevant leaders of each campus immediately when finding dangerous situations.
4. Strengthen patrol on duty. In case of heavy rain and long rain, we must pay close attention to the surrounding areas of the school. Once the danger is found, it is necessary to start the relevant emergency plan in time and evacuate teachers and students.
5. Strengthen the traffic guidance for students when they go to and from school during the typhoon. Ensure smooth drainage inside and outside the school.
6. In case of danger, the building should be closed immediately and the construction should be stopped, and the teachers and students should be transferred to a safe residence in time to ensure the safety of teachers and students.
7. Post safety warnings in conspicuous places to improve the safety awareness of teachers and students.
8. Prepare classrooms for the victims in the surrounding areas.
9. If there are any injuries, property losses or serious accidents, the school will report to the xx District Education Bureau and the relevant departments at higher levels as soon as possible.
10. Call for help 1 10. Fire alarm 1 19. Medical assistance 120. Traffic accident 122.
Emergency plan for typhoon prevention (IV) In order to do a good job in typhoon prevention and storm surge rescue in our town, minimize the losses caused by disasters, and ensure the safety of people's lives and property, this plan is formulated according to the spirit of the emergency response law and the actual situation of our town.
I. Guiding ideology
According to the instructions of the municipal and district governments, combined with the reality of our town, firmly establish the idea of preventing floods, typhoons and storm surges, be prepared for danger in times of peace, so as to ensure the safety of people's lives and property.
Two, strengthen leadership, the establishment of typhoon and storm surge prevention work leading group.
Set up a leading group for flood control, typhoon prevention and storm surge prevention with the mayor as the team leader and the leaders in charge as the deputy team leader, and set up an emergency team with an office under which the deputy secretary is the director. The emergency commandos for flood control, typhoon prevention and storm surge are responsible for the layout, inspection, supervision and information release of flood control, typhoon prevention and storm surge prevention in our town, timely convey the spirit of instructions for typhoon prevention and storm surge prevention at the municipal and district levels, and summarize and report the situation of typhoon prevention and storm surge prevention in our town.
Third, the division of responsibilities
(1) Each district
1. Person in charge: district secretaries.
Step 2 work
(1) Notify the villages quickly and make records.
(2) Dangerous households are forced to move out.
(3) Inform vehicles to stop driving during the typhoon to reduce the number of people going out.
(4) Organize village cadres to remove weeds in the canal, quickly drain the accumulated water in the field, and never allow the accumulated water in ditches and depressions.
(5) The residential area should be prepared for moistureproof.
(6) Animal husbandry villages should be prepared for wind and rain.
(7) After the rainstorm, quickly count the disaster situation and do a good job in rescue and appeasement.
(2) Safety
1. Person in charge: Salt Industry Office, Fisheries Bureau.
Step 2 work
(1) Inform the feeding and nursing personnel in this area to evacuate in writing in time.
(2) notify enterprises such as sea cucumber breeding in writing to stop construction and evacuate mechanical personnel.
(3) Notify all salt and salt chemical enterprises to prepare for wind and moisture.
(4) The ship docked and all operators landed.
(3) Enterprises within the jurisdiction
1. Person in charge: Economic Development Office.
Step 2 work
Notify to take preventive measures.
(4) Construction site
1, responsible person: xxx.
Step 2 work
(1) Pay close attention to construction sites such as middle school teaching buildings, kindergartens, residential areas, market buildings and poverty-stricken houses.
(2) Give a written notice, and pay attention to live working, hanging objects at high altitude and personal safety.
(5) Road repair
1, responsible person: xxx.
Step 2 work
(1) Repair the seriously damaged parts.
(2) Quick repair after the disaster.
(3) Check billboards, poles and lines along the way.
(6) Housing and nursing homes
1, responsible person: xxx.
Step 2 work
(1) Check the housing and nursing homes.
(2) communicate with the flood control headquarters on disaster statistics and retribution.
(7) Flood control in villages and towns.
1, responsible person: xxx.
Step 2 work
(1) Drainage dredge.
(2) High-altitude hanging objects such as billboards.
(8) Flood control facilities
1, responsible person: xxx.
Step 2 work
(1) Dredge all main drainage channels, lift gates, dig dams and clear grass.
(2) Check the reservoir dam.
(3) Reservoir and main canal shall be responsible for division of labor, and a division of responsibilities table shall be formulated.
(9) "Three networks"
1. responsible person: sanwang office and forestry station.
Step 2 work
Mainly post-disaster recovery.
(10) Emergency Rescue Team
1, responsible person: xxx.
Step 2 work
Organize two rescue teams, divide them into several groups, and each 1 2 team members will lead the team to ensure that the personnel are in place.
(11) Information flow.
1, responsible person: xxx.
Step 2 work
(1) Information communication of flood control headquarters.
(2) Disaster statistics.
(3) Personnel and vehicle scheduling.
(4) Upload and publish.
(12) supervision
Person-in-charge: supervision office, notify the health center to prepare for disaster prevention.
The fourth is to comprehensively prepare and implement various measures.
All village committees and units stationed in our town should arrange typhoon and storm surge prevention work according to their own actual conditions, especially according to the priority of typhoon and storm surge prevention hidden dangers, and formulate corresponding preventive measures.
(1) Do a good job in the investigation of typhoon and storm surge prevention in our town. At present, many drainage ditches and pipelines in our town are occupied, covered and blocked, and some houses are still in danger of leaking rain, which is an important hidden danger to prevent typhoons and storm surges. All village committees and units stationed in our town should do a good job of investigation, especially in villages, and report the existing problems to the leading group for typhoon and storm surge prevention immediately.
(two) do a good job in typhoon and storm surge prevention work plan and typhoon and storm surge prevention work in key areas. According to the opinions of the city and district on typhoon storm surge prevention and the actual situation of our town, the leading group for typhoon storm surge prevention in town has formulated the implementation plan for typhoon storm surge prevention in town and the first-level plan for typhoon storm surge prevention in key areas.
(3) Strengthen the duty and duty system. The personnel on duty to prevent typhoon and storm surge in this town will be on duty 24 hours from 1 month to properly handle all kinds of emergencies in time. Establish a reporting system for flood control, typhoon prevention and storm surge prevention, and all village committees shall report to the town typhoon prevention and storm surge prevention in time. The town's typhoon and storm surge commandos are fully prepared for emergency rescue and disaster relief, and they will be dispatched as soon as there is danger.
(4) Prepare flood control materials. Buy shovels, pickaxes, straw bags, iron wires and sand materials as reserves for flood control, typhoon prevention and storm surge prevention.
Verb (abbreviation for verb) job requirements
(1) Be prepared for danger in times of peace and enhance the sense of hardship. All units should not take it lightly, and must resolutely prevent problems before they happen. Seriously study the instructions of superiors on typhoon and storm surge prevention, improve the understanding of the importance of typhoon and storm surge prevention, overcome paralysis and luck, firmly establish the awareness of typhoon and storm surge prevention, and include typhoon and storm surge prevention in one of the important tasks at present.
(2) Strengthen leadership and implement the responsibility system for typhoon and storm surge prevention. According to the requirements of the municipal and district typhoon and storm surge prevention headquarters, the first-in-command responsibility system shall be implemented, and the responsibility for typhoon and storm surge prevention shall be implemented. Each village committee should set up a leading group for typhoon and storm surge prevention, headed by the village committee director, to make good ideological and material preparations for the masses and ensure the safety of typhoon and storm surge prevention in our town. Staff should keep communication open for 24 hours. During the typhoon, the personnel and vehicles on duty are on duty 24 hours a day, and other personnel are on standby.
- Previous article:Climatic conditions in Luxi town
- Next article:There are two suns over Shijiazhuang. Is this an abnormal weather?
- Related articles
- How to write "Tian"?
- What is the full size of the red warning door? Urgent!
- A classic sentence wishing peace and success.
- Good words and sentences describing cloudy days
- How to write a copy when installing doors and windows in cold weather?
- Top three in the world, top three in China?
- What are the free and interesting places in Anyang?
- Ha, are you hungry?
- The climate type of Beijing belongs to
- When does the typhoon land?