Traditional Culture Encyclopedia - Weather inquiry - Lifting time of Haimen Bridge in Tanggu

Lifting time of Haimen Bridge in Tanggu

The hoisting time of "two bridges" is 13: 30 every day.

After the bridge hoisting time is adjusted on April 17, the impact on citizens' travel will be greatly reduced. In order to ensure the safety of water traffic in the waters of the "Two Bridges", Haihe Maritime Safety Administration has formulated a cruise plan for the waters of the "Two Bridges" and organized maritime law enforcement personnel to ensure the safety of navigation in the waters through water cruise and on-site supervision. Remind the general public to arrange travel time or travel route reasonably, so as not to bring inconvenience to travel.

The lifting time of the "two bridges" was changed from afternoon to early morning, and it was set at 5: 00 am15, and the opening time should not exceed 1.5 hours in principle. However, due to the "two bridges" failure or weather, if it cannot be opened normally at 5: 00 on the same day, one bridge can be repaired at 65: 438+03: 30 on the same day. If it can't be opened all day, a bridge can be added at 13: 30 the next day.

Haimen Bridge, located in Tanggu Street, Binhai New Area, Tianjin, is a lifting open bridge across the Haihe River estuary. The total length of the bridge is 550. 1m, and the span of the main bridge is 2×48+64+2×48(m). The simply supported through steel truss beam is welded by bolts, and the bridge width is 2×2+ 14(m).

The middle 64m is a movable hole with a lifting height of 24m. The main bridge 1 ~ # 4 pier adopts φ 1.2m open steel pipe pile foundation, and the rest adopts φ55cm reinforced concrete pipe pile foundation.

North Network-From April 17, the hoisting time of Haimen Bridge and Haihe Bridge will be adjusted.