What is the difference between pe drainage pipe and pe water supply pipe? Welding method of pe drainage pipe
1. Working pressure
PE water supply pipe is used to transport tap water, which usually needs a pump to pump water from the ground to the home. Because PE water supply pipe needs to bear the working pressure when pumping water, PE water supply pipe is usually divided into five levels according to the pressure, which are .6Mpa, .8Mpa and 1.Mpa respectively. They each bear 6 kg work pressure, 8 kg work pressure, 1 kg work pressure, 12.5 kg work pressure and 16 kg work pressure. The greater the pumping pressure, the higher the working pressure level of PE water supply pipe is required.
PE drainage pipes usually discharge sewage, which flows from high altitude to low altitude, so PE drainage pipes usually do not need to consider the working pressure level.
2. Price
PE water supply pipes are made of newly upgraded high-density polyethylene raw materials, while PE drainage pipes use a lot of recycled materials, so the manufacturing cost of PE water supply pipes is much higher than that of PE drainage pipes.
3, raw materials and hygiene standards
PE water supply pipes need to transport tap water for everyone to drink at ordinary times, so PE water supply pipes must meet China's quality standards, and the raw materials of PE water supply pipes must also be high-density polyethylene that meets national industry standards. The PE drainage pipe meets the available standards and is allowed by customers, and the materials are added for customers to choose by themselves.
second, the welding method of pe drainage pipes
The welding pipes are connected by electric melting through pipe fittings, and the following steps should be done before connection:
1. Power supply: There are two kinds of power supplies for the welding machine: 22V and two-phase 38V, so be sure to check them clearly before use. If the transmission distance is too long, the cable should be properly thickened to reduce line loss.
2. Trial welding machine: After connecting the power supply, debug the welder to see if it can work normally.
3. Connecting piece: Connect the output line of the welding machine with the terminal post of the pipe fitting, and there shall be no looseness, resulting in poor contact.
4. Start welding: When the welding button is started, the voltage and current "regulator" must return to the zero position. After starting, slowly adjust the voltage and current "regulator" to make the voltage and current reach the set value, and the adjustment should not be too fast. Generally, the voltage will rise one by one. Due to different weather, climate and seasons, the welding parameters are affected, so it is necessary to pause, extend and shorten the reference parameters provided by the company during the welding process. In order to ensure the applicability of the parameters, it is best for PE steel skeleton manufacturers to provide reference parameters. Before the project starts, one or two destructive pipe fitting welding tests, that is, anatomical tests, are conducted according to the site conditions to observe the welding effect.
5. Adjust parameters: During welding, abnormal conditions may occur, and parameters need to be adjusted, such as voltage and current rising too fast. Due to the weather, fit gap and different materials, the welding parameters are affected, so it is necessary to pause, extend and shorten the parameters during the welding process.
6. welding is completed: after welding is completed, disconnect the output line from the pipe fitting. Observe whether the temperature of the pipe fittings is normal, whether there is a big difference between the left and right before and after the temperature, and whether the appearance is affected by the discharge. If there is any abnormal phenomenon, it should be removed on the spot. Protective measures (heat preservation) should be taken when welding connection is carried out in cold climate (below-5℃) and windy environment, and construction cannot be carried out without taking measures. The installation and welding of pipe fittings can be heated by building a simple shed.
7. After cooling and welding, keep the joint in a natural state during the cooling process, and ensure that it is not affected by any external force during the cooling process. It is not allowed to move or rotate the joint parts and pipelines on both sides. The cooling time should be determined according to the climatic conditions and the size of pipe fittings.
8. The pipeline in the pressure test device can be tested in different systems according to the system. However, it should be noted that all pipelines connected with the outer pipe cannot be separated from the outer pipe due to the particularity of PE steel skeleton pipe (without the inlet valve). In this case, the water can only be tested once during the overall linkage test run, and the pressure of strength test cannot be reached. There is no guarantee that there will be leakage after the pressure test.
- Previous article:The weather is bad and I am in a good mood.
- Next article:When will the rainy season come in Hubei-future weather forecast
- Related articles
- How to set children's photos on smart TV?
- The lowest temperature for continuous cooling in Hebei is -32℃
- What's the difference between frost and freezing?
- I want to ask about the weather in Greece in October.
- When is the best time to go to Lijiang? What month is better to go to Lijiang?
- Where is a good place to travel in February? Where is a good place to travel in February?
- Surnamed tang girl's name is 2022 in the Year of the Tiger, and surnamed tang girl's name is elegant.
- The weather in Wuxi in the past week
- It is foggy in winter. Do I need to close the window at night?
- Why do westerners like to talk about the weather?