Traditional Culture Encyclopedia - Weather inquiry - How about decorating your home in the sultry season of June? Let's listen to the master!
How about decorating your home in the sultry season of June? Let's listen to the master!
One: The benefits of the renovation in June
1. Good painting effect
The temperature is high and the gas volatilizes quickly, so the paint dries quickly and grinds more timely in summer decoration, and the brightness of the paint can be fully reflected, and the paint surface effect is excellent.
2. Tiles stick more firmly
It is hot in summer, and the water evaporates too quickly. Therefore, in order to ensure that the tiles can fully absorb water, most decoration workers will soak the tiles in advance, and some even have to soak them for a second time, so that the tiles that have absorbed enough water can better stick to the ground and walls. After the tiles are pasted, water them, open the window and let them dry naturally, so that the tiles can be pasted more firmly.
3. It is convenient to eliminate wall problems.
The putty scraped before painting in summer can be dried slowly, instead of? Dry look? In this way, the paint will not fall off after painting, which will affect the construction effect of the wall. This fundamentally avoids the common problems of wall pulverization, foaming and cracking.
It is easy to judge whether this material is environmentally friendly.
In summer decoration, when the temperature reaches above 28 degrees and the humidity exceeds 45%, harmful substances will be released many times. You can judge whether the materials used in decoration are harmful to the environment by smell.
Two: What are the decoration skills in June?
1. Design
Before the renovation of the new house, it is best to discuss with professional designers how to design the house! Before the workers enter the site, they will personally measure one side of the corner of the home and record it, such as tile area, wall paint area, wallpaper area, floor area, furniture size and so on.
2. Make the space more practical
The main body demolition and reconstruction is a worldwide project, mainly including wall demolition, wall building, wall covering, heating, plastic steel windows and so on. Remove the garbage in time to ensure the cleanliness of the room, but also for the convenience of construction. At this point, it's time to set up the product door. At this time, try to determine the cabinets, range hoods, cookers and water heaters.
3. Hydropower transformation
Hydropower transformation, there is no regret medicine to eat, so be sure to determine the switch, lamps and so on. ; You must choose your own socket and switch. Before determining the socket, please ask the designer to design the placement position of the furniture to avoid unreasonable division of the socket. Nightlight can be installed in the corridor and dark place from bedroom to bathroom, which is convenient for walking around at night and does not disturb family members. Reminder: Keep a distance of 20 cm between the strong and weak points, such as a distance of 20 cm between the socket and the network cable.
Wrapped pipeline
Considering the humid environment of kitchen and bathroom, wooden keel must not be used as the material of riser! Everyone must be careful, even if the wooden keel is painted with antirust paint. Remember, the vertical pipe is made of light steel keel or red brick. Light steel keel saves space, and red brick is firm.
5. Tiles
After waterproofing, we are going to stick bricks. Normal tiles should be soaked in water, dried in the shade and then pasted; Broken tiles are left to cut. Please leave enough before choosing bricks. Before tiling, choose a floor drain. The floor drain should be a special washing machine or shower floor drain, and should have the function of deodorizing. At this time, the basin and faucet should be determined, and the cabinet designer should be invited to the door for the second time. At the same time, choose paint, wall paint, nitrocellulose paint and diluted water, such as wallpaper.
paint
There's nothing to say about painting the wall. The effect of leveling, grinding and rolling depends on the skill of your painter. The primer has good adhesion, which can make the wall smoother, the topcoat easier to brush and reduce the use of topcoat. Moreover, the excellent sealing property of the primer can effectively resist the penetration of alkaline substances in the wall, prevent the precipitation of water-soluble salts and prevent the wall from returning to alkali.
7. wallpaper
Before pasting wallpaper, brush nitrocellulose paint where you need to paste it. When the paint is dry, you can ask the master to paste the wallpaper. It should be noted that do not open the window for ventilation within 48 days after the wallpaper is pasted, and let it dry slowly in the shade. Check whether there is any upturned place after pasting.
8. Install cabinets
The cabinet is a supporting project, and the range hood, cooker and sink should be arranged in advance. Delivered on the same day and installed with the cabinet.
9. Install the finished door
The finished door should be installed before the floor, mainly because the installation steps of the door are complicated, such as hinge, door lock, door suction, door frame and so on. , and use a lot of tools. If the floor is installed first, it is difficult to avoid bumping.
10. Land reclamation and cleaning
The cleaning of new houses for land reclamation is generally carried out after the hard installation is completed and before the furniture enters the site, such as ceilings, walls, floors, doors, hardware and sanitary ware, cabinets, etc.
Three: Matters needing attention in summer decoration
1. Spray water on the wall tiles to keep them moist.
In summer, because the materials are drier than usual, it is necessary to extend the soaking time for materials that need to be soaked in water, such as wall tiles, so that their water content is close to saturation. And if the weather is dry when sticking bricks, pay attention to maintenance. For example, spray some water every once in a while to keep the original humidity of wall tiles and prevent them from drying too fast and cracking easily.
2. ventilate during the day and close the window at night
Summer is the peak of indoor air pollution, so we must pay attention to ventilation when decorating. In addition to purchasing environmentally friendly materials, we must pay attention to ventilation in summer decoration, turn on the air conditioner as little as possible in hot weather, keep indoor air circulation, and let harmful substances be distributed in time.
Keep the walls dry.
The drying treatment of putty base is particularly important. Latex paint dries slowly in summer, and it will also encounter the problem of hot flashes, mildew and odor. In engineering, it is necessary to do a good job of drying putty at the grass-roots level. After each putty application, the drying time should be extended as much as possible. If it's a sauna day, it's necessary to wait for 5 days before brushing, so as to minimize indoor moisture and avoid large-scale cracking.
4. sauna days to prevent moldy door covers
Just finished decorating, why is the door cover moldy and black? Most likely, the tiles have been laid, and it has reached sauna day. Because the outdoor humidity of sauna days is higher than that of ceramic tiles, the moisture of ceramic tiles is not volatile, so it will be absorbed into wood, which often leads to mildew of newly decorated door covers. What can we do? Waterproofing can be done at the bottom of the door cover, and the foundation surface can be raised to make the bottom of the door cover flush with the surface of the tile. ? This will not affect the appearance, but also waterproof. ?
5. moistureproof and sun protection are the key.
It's very humid in summer, so it's very important to be moisture-proof when decorating. After the timber enters the site, a layer of bottom oil shall be sealed immediately, and the board and timber shall be dried in the shade. If placed in the sun, it is easy to be heated unevenly, resulting in wood deformation. This way, even if it rains continuously, you don't have to worry about the wood being too wet.
6. Hydropower construction should be cautious.
When decorating in summer, we should pay more attention to the standardization of circuit construction operation, especially in places that are easy to get wet by rain, such as balconies. The exposed copper wire ends must be wrapped to prevent short circuit after the wires are wet. Pay more attention to this point for the wires around the wet wooden keel and joinery. Once careless, it is likely to cause a fire.
After reading the contents of the appeal, we know that the decoration in June actually has many benefits, so the decoration in June is also a very good choice, but the decoration is a troublesome thing, so there are many places that need our attention. If you want to solve the problem, you must first do a good job in decoration strategy!
- Previous article:What is the weather like in Qin 'an?
- Next article:What is the poem of sandstorm?
- Related articles
- What's the secret of wild fishing in windy days, doubling the catch and relaxing the link?
- What is the weather forecast software used by Lenovo mobile phone s720?
- The principle of weather forecast
- Can Wendi Town, Bobai County, Yulin City, Guangxi see the biggest meteor shower in 2 1 century?
- The frequency converter is used for motor protection. As a result, there is no problem with the frequency converter, a small hole is burned in the motor rotor, and the weather is getting worse. Is it
- What's the weather like in Zhanhe District during the day and at night?
- You should pay attention to the preparations for marriage.
- Final exam diary 200 words
- Heyuan geography
- Domestic tourist routes