What does the work plan include?

What does the work plan include?

The specific writing of the arrangement: Because the arrangement involves a small scope or the work within the unit, there are generally two forms of posting: one is that the superior arranges the work for the lower level, although the scope involved is very small. File header? Publish in tabular form. ? Arrangement? What is the format of? Title? And then what? Words? Two parts.

On the other hand, if it is an internal work arrangement, you can also send a document directly. Title? 、? Words? 、? Signing and time? It consists of three parts. But in either form. Arrangement? There should be no recipient in itself. If there must be, what should it be? File header? Release in form or in? Notice about the arrangement ...? Publish in name. What is the title of the arrangement? Three elements? How to write it, too? Two elements? Writing (omit the name of the organization).

The arrangement of texts is generally made up of? Start? 、? Theme? And then what? The ending? Three parts; Some of them are omitted? The ending? ,? Theme? When it's over, the text is over. ? Start? Similar to the beginning of the plan, either explain the basis or summarize it briefly.

? Theme? It is the core of the text, generally including tasks, requirements, steps and measures. Structurally, it can be written according to these four aspects; You can also combine tasks and requirements and write steps and measures together; You can also write the general task first and then write the specific tasks one by one in chronological order. Each task has its own requirements and measures, depending on the nature and specific content of the work. However, regardless of its structure, its tasks should be specific, its requirements should be clear and its measures should be appropriate.

The scheme and arrangement are similar, that is, the writing theme is a single job, that is, only one job is deployed and arranged. This is also the fundamental difference between scheme, arrangement and planning, assumption, plan and main points. However, there are also differences in the content scope between the two: the content scope of the scheme is applicable to the work of superiors to subordinates or involving a large area, while the content scope of the arrangement is applicable to the work within the unit or involving a small area, such as the work arrangement of family planning in the whole city.

There is also a more general way, that is, to write out plans and arrangements so that subordinates can master them flexibly when implementing them. This way is called? Opinion? : most programs are called? Implement the recommendations? , such as "city? Seven or five? Opinions on the implementation of socialist spiritual civilization construction during the period; Arrangements are often referred to as. Organize opinions? For example, the system's opinions on the arrangement of activities to increase income and reduce expenditure.

What needs to be explained here is that some agencies also call it a single work plan within the unit or with a narrow scope? Scheme? This is not appropriate, because these tasks are close, specific and uncomplicated, as long as they are used? Arrangement? That's enough. If it's more principled, you can call it? Organize opinions? .

Discussion on Matters Needing Attention in Enterprise Activity Planning (Ⅱ)

For large enterprises, it is common to organize various types of marketing activities, public welfare publicity, large-scale reception and large-scale training. How to give full play to the enthusiasm of employees and rationally allocate manpower, material resources and financial resources? In strategizing, winning thousands of miles away? , is indeed a learning worthy of serious treatment.

I came to Huancheng Company at the end of 2003, and it has been nearly 8 years. Over the past eight years, it has witnessed the development of Huancheng Company from a company focusing on automobile industry to a diversified industrial group. I have participated in the organization and planning of various large-scale activities held by the company for many times, and gained the joy of success and good memories in the sincere cooperation with colleagues around the city.

Like July 2004? Miss Intercontinental Universe visited China Store? Activities; Organized by the Huancheng Automobile Club in 2005? Colorful summer flying colors? Car painting activities, China Shanxi Mongolian Grassland Tour? Activities? On September 26th, 2005, we worked in harmony and unity. (Grand celebration of the establishment of Huancheng Company15th anniversary); August 2006 Wuhai Jinsha Bay National Desert Cross-country Race; In 2008, the pre-investment planning of the stone market around the city, the reception planning of experts' evaluation of key middle schools in 20 10, and the educational activities of Chinese traditional culture from March to early April in 2010. The success of these large-scale activities, with the dedication of colleagues around the city, has been a complete success, bringing benefits to enterprises, enhancing the visibility and reputation of companies around the city, and becoming an important support for corporate brand building.

Of course, as far as activity planning is concerned, no matter how big or small the planned activity is, we must know the elements of a complete planning scheme. A complete planning scheme mainly includes the following contents:

(1) activity theme. That is, the slogan, the theme of the activity is directly related to the project and the scope of the activity, which must be carefully studied and determined.

(2) the purpose of the activity. The purpose of the activity should be concise, but the expected effect of the activity must be expounded.

(3) Activity steps. This project is equivalent to the trunk of the human body, and it is a description of the whole process of activities, so it should be as detailed as possible.

(4) Activity time and duration. Mention here? Time? Not only refers to the start and end of the activity, the planner must list some key time points according to the activity steps (so-called? Node? The work items marked by node time are all necessary processes, and they are the intersection points of several important processes, so special attention must be paid.)

(5) Scope and mode of participation. This item needs to clearly define the scale and organizational form of the activity.

(6) Capital budget and material preparation. This item must be as detailed as possible, the expenses must be verified accurately by the planner, the activity director and the buyer, the material preparation must be checked by the list, and the person in charge is responsible, and the material preparation must be strictly in accordance with the final time limit. As small as a bag of pins, a plate of candy, a bucket of tea and a roll of paper.

Towels and a plate of wire can't be ignored. Otherwise, you may suffer a big loss in actual activities.

(7) Activity venue. The venue of the event is very important, because once the event time is selected, it is equal to the same time? What's the weather reservation for that day? Climate is very important, especially for outdoor large-scale activities. If the planner doesn't pay close attention to the weather and site conditions, the effect of the activity will be greatly reduced or even impossible in case of thunderstorm or serious traffic jam. At the beginning of May, 2004, a three-day auto show was scheduled to be held in the auditorium of Donghu Municipal Government in Xinhua Square, but it was forced to be suspended due to continuous rain.

Before the opening of the Beijing Olympic Games, in order to ensure that it doesn't rain that day, the artificial rain driving technology made full preparations and preparations to ensure the smooth holding of the event. Of course, for the outdoor planning activities of enterprises, it is very beneficial to pay close attention to the weather changes in the activity area within a week and be aware of them.

(8) division of labor. This is the most critical step. As the saying goes, everything depends on human effort? . What is a sentence that the author agrees with very much? Good deeds should be done by good people! ? Completing the task is the same, and choosing different people to undertake specific tasks will have completely different results, just like playing cards in different orders will have completely different results. The chief commander in charge of the implementation of the activities is the most critical. If this person's own organization and coordination ability is low, his popularity is insufficient, his on-the-spot response is not fast enough, and he lacks the overall planning ability, he will miss many time nodes, causing the activities to be blocked and suspended, or even if he barely completes the activities, he will not achieve the expected results at all, wasting valuable manpower, material resources and financial resources of the enterprise.

Of course, a qualified commander-in-chief can fully understand people's responsibilities, give full play to the strengths of each participant, and bring everyone's strengths to the extreme through effective incentives. The commander-in-chief is not necessarily a manager with a position. Many employees have the command ability and can make overall plans.

The key quality is that they can act as the general commander and promote the perfect implementation of the activities in strict accordance with the established plan. On September 26, 2005, he served as a ring company? Harmonious * * * economy, condensed into a ring? Gao Hongye and 20 1 1, the general commanders of the event, took office in early April? China Traditional Cultural Activities in Huancheng Vocational School? Song He, the chief commander, presided over all kinds of marketing planning activities of the company many times, which is an outstanding representative of our company's activity planning. They treat the activities they are responsible for with a holistic thinking, dedication and excellent attitude, and lead everyone to carry out the activities they are responsible for to the expected level or even exceed expectations.

Of course, for small-scale activities with short activity time, there is no need to make lengthy plans. The implementation can be in tabular form, which is simple and easy to implement. However, it should be noted that the table should list the time (accurate to the minute), the name of the work item, the material preparation list (including the unit price, quantity and total cost of the purchased item, the name, quantity and acquisition method of the item to be prepared) and the project executor in detail. , and can make another note, indicating the items that need to be supplemented.

After the planner lists the form, it must be discussed by the general director of the event (the general director of the small event is often the same person as the planner) before it can be implemented through consultation. It is forbidden to act arbitrarily for the sake of safety.

Related reading:

What is the content of the work plan?

Social work plan for the elderly

Youth social work plan

School social work plan

Community social work plan

Work plan for building a well-off society in an all-round way

Social evaluation work plan

Social governance work plan