Traditional Culture Encyclopedia - Weather inquiry - Is it okay to lay bricks when it rains?
Is it okay to lay bricks when it rains?
Is it good to lay bricks on a rainy day?
Is it good to lay bricks on a rainy day? Many people will lay tile floors at home, which will look more fashionable and easier to take care of. However, some people say that if it is a rainy day, they cannot lay tiles, which will affect the tiles. So is it good to lay tiles on rainy days? ? Is it good to lay bricks on rainy days 1
Rainy days are generally not suitable for laying bricks.
Especially during heavy rain, there is a lot of rain outside, and it is easy to wash away the cement on which the tiles are attached, so the tiles are not sticky, which affects the tiling effect of the tiles. If you want to lay ceramic tiles, it's best to avoid rainy days so that the tiles and cement won't be easily washed away.
For ceramic tiles, rainy days often cause the tiles to absorb too much moisture, causing the tiles to easily crack or even fall off. If the tiles you buy are of poor quality, you may have more problems.
In addition to affecting the effect of laying ceramic tiles on rainy days, it will also affect the construction work of workers. Installing ceramic tiles outdoors on rainy days is troublesome. If the decoration does not take corresponding protective measures on rainy days, it will have a certain impact on the quality of the decoration. However, as long as the moisture-proof work is done well, normal construction can still be carried out. However, for several projects, it is best to avoid rainy days.
Extended information:
Construction procedure specifications for floor tiles:
1. The variety and quality of the panels used in the surface layer must comply with Design requirements;
2. The floor tiles are laid with no signs of looseness and are firm and stable. The bond (bonding) between the top layer and the next layer should be strong. The hollowing phenomenon of floor tiles should be controlled within 3%. The hollowing on the main channel must be reworked. 3% only refers to hollowing at the corners of a single block, and the entire block must not be hollowed out.
3. The surface of the brick surface is clean, the pattern is clear, the color is consistent, the joints are smooth, the depth is consistent, the periphery is straight, and the plates are free of defects such as cracks, corners, and missing edges. The pattern of the floor tiles has not been damaged during the construction process, such as scratches, scratches, etc.
4. The material of floor tiles should comply with relevant national laws and regulations, and should not violate the decoration contract signed by both parties.
5. There is no obvious difference in the color of floor tiles. The gaps between each tile should be narrow and the joints should be properly handled. The material and size of the surface layer adjacent to the surface layer should meet the design requirements, and the edges and corners should be neat.
6. The surface of floor tiles should be smooth, without cracks, missing corners, etc., and should be very straight to each other. The flatness of floor tiles should be checked with a 2-meter level. The error should not exceed 0.5mm. The height difference between adjacent tiles should not exceed 0.5mm. The flatness of the gaps should be 3mm. When laying floor tiles, other types of work must not contaminate them. After the floor tiles are completed, clean the joints 24 hours and do maintenance. Is it okay to lay tiles on rainy days? 2
The construction weather will indeed have an impact on the construction, but it will have little impact on the effect of indoor tiling, and more on the effect of tiling indoors. The impact of outdoor tiling. Firstly, it is very dangerous to stick exterior wall tiles on rainy days, mainly due to the safety of construction workers; secondly, under the erosion of rainwater, the cement pasting the tiles will be easily washed away, so that the tiles will not have stickiness. Affects the laying effect of ceramic tiles.
For ceramic tiles, rainy days can easily cause the ceramic tiles to absorb too much water, which may later cause the ceramic tiles to easily crack or even fall off. If the quality of the ceramic tiles is not good, more problems may occur.
Key points for laying tiles:
1. When laying tiles with cement mortar, the wall tiles need to be soaked in water, but the floor tiles do not. The wall tiles should be fully soaked in water for 2 to 4 hours, whichever is the case without bubbling. The purpose is to prevent the water-absorbing ceramic tiles from quickly absorbing the moisture in the cement layer, thereby causing the cement to lose its corresponding properties.
2. Before laying floor tiles, the thickness of the bonded mortar should be determined according to the design requirements, and the crosshairs should be drawn to control the total thickness and surface smoothness of the stone and floor tiles. When laying floor tiles, you should also sweep the grout in advance to keep the floor clean and free of debris. When attaching wall tiles, it is best to use a professional roughening roller for roughening treatment.
3. Pay attention to the ratio of cement to sand: too much cement will shrink too fast, and too little cement will make it difficult to stick firmly. Under normal circumstances, wall tiles are generally laid wet, which requires more cement; floor tiles are generally laid dry, which requires more sand.
If the wall is a new wall, it is best to hang the mesh first and then plaster it. If you need to hang heavier objects such as water heaters, it is best to use lightweight bricks of 8 cm or more.
4. After 1 hour of paving, the cement, caulking agent or other sticky objects left on the brick surface should be wiped clean immediately, because it is more difficult for the caulking agent to adhere after four hours. Cleaned.
5. After 12 hours of paving, remember to tap the brick surface to check. If there is any hollow sound, it should be re-paved immediately. The overall hollowing phenomenon of floor tiles should be controlled within 3%. The hollowing on the main channel must be reworked. 3% only refers to hollowing at the corners of a single tile, and the entire block must not be hollowed out.
6. You can walk on the tiles 24 hours after they are laid. Scrub them thoroughly, mix the detergent with water, and clean the tiles thoroughly.
7. There is also a need to pay attention to the seams when laying ceramic tiles: antique tiles generally have larger seams of 2~3mm, large flat wall tiles of 1~1,5 mm, and floor tiles of 1~2mm.
The thickness and height of tiles are generally about 3cm. Is it good to lay tiles on rainy days 3
1: It is not suitable to lay tiles on rainy days.
Two: If you want to renovate, you should avoid the rainy season, otherwise it will be easy for wall bubbling and floor warping to occur.
Question 1: Deformation. The problem with rainy season decoration is that the large core board itself has a high moisture content. In the humid rainy season, the moisture will be absorbed more. Once the dry season comes, serious cracking and deformation will occur. This is also a hidden danger in decoration during the rainy season.
For ceramic tiles, rainy days can easily cause the ceramic tiles to absorb too much water, causing the ceramic tiles to easily crack or even fall off. If you buy brand tiles that are not of better quality such as brand tiles, the problem will be more serious.
Problem 2: If the construction period is too long and it rains, it is more likely to cause leakage and other problems. Cement bonding is difficult and it is more likely to lead to accidents.
Tiling is indeed affected by the weather, but it is not suitable for all situations. Tiling with seams will not be affected by the weather.
Any object itself has an expansion coefficient related to temperature. Leaving seams when laying tiles can well avoid the phenomenon of tile breakage and arching caused by thermal expansion and contraction of tiles due to temperature differences.
Even if it is not rainy weather, it is recommended to use the seamless laying method when laying tiles. If the ceramic tiles are paved without leaving seams during construction, uneven paving will easily occur
In fact, this is not due to the quality problems of the ceramic tile products themselves, but because of the mud mixing process during the paving construction. The moisture content of the mud is uneven. After the construction is completed, the mud is highly condensed and produces uneven tension, resulting in unevenness. Leaving seams can effectively avoid this type of problem.
Seamless tiles can also add beauty. The regular lines produced by leaving seams in the tiles can achieve a certain three-dimensional effect. At the same time, its function not only beautifies the overall paving space effect, but also greatly relieves visual fatigue to a certain extent.
In the longer term, seamless tiling is also more convenient in terms of future care and maintenance. For example, if the tiles are damaged due to falling heavy objects or other reasons, it is enough if the seams are left. Damaged tiles can easily be replaced on the fly.
If you leave room for everything, you will have a way out, and if you leave room for tiling, there will be benefits.
- Previous article:About cold and hot weather warnings
- Next article:What is the first hot food you think of in winter?
- Related articles
- In Qinggangwan Village, Lanjiang Town, Anju District, Suining City, Sichuan Province, the actual cost of installing natural gas for poor households is more than 7,000 yuan. Can you give me an answer?
- Love signature on happiness 202 1
- The highest temperature in Suriname, South America in a year.
- Write a fairy tale in about 200 words.
- When the weather is good, the pickup truck dashboard odometer will not display, but the rainy weather shows good and the odometer is normal. How to return it?
- Pass the authoritative test! What is the measured experience of OPPO Xiaobu Assistant?
- How many districts and counties are there in Fujian?
- Can Tianqidan be used with Clinique butter?
- Under what circumstances can the push-pull meter not be used?
- 1935, a mute appeared in Guizhou. 14 later, he suddenly spoke. What did he say?