3 demonstration documents of earthwork contract in 2020.
Model earthwork contract 1
Party A:
Party B:
According to People's Republic of China (PRC) Contract Law, Construction Law and other relevant laws and regulations, Party A decides to contract out the site leveling and earthwork works of sewage treatment tank of X Co., Ltd. to Party B. In order to clarify the rights and obligations of both parties, the following contract is reached through friendly negotiation:
I. Overview of the Project
1. 1 project name: earth and stone leveling project of the construction project site of X Co., Ltd. and excavation and transportation of sewage tank.
1.2 project location: __ x co., ltd.
1.3 project contents: earthwork excavation, loading, transportation, and site leveling of sewage tank.
1.4 project contracting scope: earth and stone works for leveling all sites and earth and stone works for sewage tanks within the red line of X (Changde) Gao Xinxin Industrial Park construction project.
1.5 quantity: the total earthwork is about 2.5 million cubic meters. The earthwork is about 95%. Stonework accounts for about 5%, which is subject to the actual acceptance of the fill (the sewage pool is subject to excavation).
Two. Opening time and completion date
2. 1 Commencement date: YY.
2.2 Completion Date: MM DD YY.
2.3 The contract duration is 120 working days (subject to the time specified in the commencement notice).
2.4 If the construction period is delayed due to irresistible reasons (such as natural disasters, rain and hail weather), Party A must issue a visa and postpone it accordingly.
Third, the project contracting content
3. 1 Site leveling and earthwork excavation (excluding stone blasting), transportation and leveling (excluding filling and rolling and retaining wall engineering of sewage treatment tank) of the sewage treatment tank.
Fourth, the project contract price
4. The unit price of1earthwork is calculated as: 20.8 yuan /m3 for filling, 20.8 yuan /m3 for clearing earthwork in sewage treatment pool, (in the case of pure earthwork negotiation) and (within the transportation distance 1km). If it exceeds 1km, the unit price of earthwork will increase by 2 yuan /m3.km, that is, the transportation distance is greater than. And so on. Party B is only responsible for excavation and transportation (paving, drainage and other materials are provided by Party A).
4.2 The above unit prices all include tax, excluding any fees charged by any other party (such as: two insurances and one gold, management fees, coordination fees and other fees of local villagers, other local institutions, transportation, sanitation, muck, traffic police and so on).
Verb (abbreviation of verb) project fund payment
5. 1 progress payment: When Party B's personnel enter the site, Party A will pay 5% of the total project cost as advance payment. Within 10 days after receiving the advance payment, Party B shall set up the project department, set up temporary facilities, and organize dispatching agencies and equipment to be present.
5.2 Party A shall pay 15% of the total project cost as the progress payment within two days after the excavation of Party B's institutional equipment is completed.
5.3 The project progress payment shall be settled once every 300,000 cubic meters, which meets the reporting conditions of the project progress payment (i.e. when 300,000 cubic meters are completed). When Party B declares the project progress payment to Party A, Party A must calculate the engineering quantity within 3 days after Party B declares and pay the project progress payment to Party B within 5 days. When applying for the progress payment of the first 1 phase (i.e. when the earthwork project of the first 1 phase of 300,000 cubic meters is completed), Party A shall pay the progress payment to Party B according to 85% of the completed project price, and the remaining 15% shall be paid when Party B applies for the progress payment of the last phase of the current project after completing the first phase. The second payment of 300,000 cubic meters shall be paid according to 100% of the completed project price, and the third payment shall be paid according to the second payment and the fourth payment. When paying the progress payment for the last time, make up the project payment owed by 1 time (i.e. 15% of the project price of 300,000 cubic meters).
5.4 Project settlement and settlement payment are completed. If the project is completed and accepted, Party A will receive Party B's half-month completion settlement book audit (if the audit is not completed within half a month, it will be deemed that Party A recognizes Party B's completion settlement amount). All the project funds shall be settled within 10 days after the audit conclusion is issued.
Six, quality and construction requirements
6. 1 Arrival position, size and elevation meet the design requirements.
6.2 After the completion of earthwork, the flatness is within the elevation range determined by Party A in advance, and the allowable error is within 30cm, which is regarded as a qualified project.
Seven. final acceptance of construction
After the project is completed and Party B's self-inspection is qualified, Party A will complete the acceptance within one week after receiving Party B's completion acceptance report (if Party A fails to organize the acceptance within one week, the project will be deemed as qualified).
Eight. others
8. 1 Personnel shall be organized by Party B, machinery and equipment shall enter the site within the time specified by Party A, and Party A shall send site management personnel to supervise the project quality and progress.
8.2 Party A is designated as the representative of Party A, and the business contact, economic visa and other relevant documents signed by Party A's representative are deemed as Party A's approval. ..
8.3 Party B is appointed as the representative of Party A, and the relevant business dealings, economic visas and other documents signed by Party B's representative are deemed as Party B's consent.
IX. Opening and Use of Accounts
All the project funds paid by Party A to Party B shall be remitted to the account designated by Party B, and the project funds account established by Party B is: account name: deposit bank: account number:.
X. Party A's responsibilities
10. 1 Party A must make all preparations for the commencement of construction and handle all relevant commencement procedures 3 days before Party B enters the site.
10.2 Party A must install the water, electricity and temporary facilities required for the construction in place 3 days before Party B starts construction.
10.3 Party A must provide Party B with three construction drawings and site excavation facilities two days before Party B starts construction.
10.4 Party A must provide Party B with engineering geology and underground pipeline information three days before Party B starts construction.
10.5 Party A shall contact the mobile refueling truck to the site (China Petrochemical Company) to provide Party B with the required oil, ingredients, explosive materials and initiating explosive devices, but Party A shall be responsible for the distribution, recovery, relevant procedures, evaluation, supervision and monitoring of chemical materials, and Party B shall only provide the blasting qualification, and set the price according to the local government market price.
10.6 Party A shall properly handle the local neighborhood customs. In case of local citizens' interference, work obstruction, interference, mechanical equipment damage, road obstruction and other problems in the construction process, Party A shall compensate Party B for the delayed construction period and economic losses according to the actual losses. And extend the construction period by visa, and the extension period shall not exceed 5 days per month; Otherwise, according to the actual losses, Party A will pay 20 yuan to Party B every day for each excavator, 1 1,000 yuan for each transport vehicle and 1 1,000 yuan for other machinery, and pay 200 yuan compensation to Party B every day.
10.7 Party A guarantees the progress of project payment. If Party A fails to pay the project payment to Party B in time, Party A will pay Party B four times the interest of the local Agricultural Bank. All economic losses and legal responsibilities arising therefrom shall be borne by Party A. ..
10.8 If Party A fails to pay Party B the project progress payment on time, and economic losses are caused by Party B's shutdown, it shall compensate Party B according to Article 6 of Item 10 of this Contract.
XI。 Party B's responsibilities
1 1. 1 Party B must carry out the construction in strict accordance with the requirements of Party A's drawings and written notice, and complete the construction tasks on time and with good quality.
1 1.2 Party B must regularly educate the construction personnel about safety in production and formulate various safety inspection measures. Operate in strict accordance with the construction specifications and do a good job in safety production. Party B shall be responsible for all accidents, casualties and property losses caused by neglecting safety production education and relaxing safety management. Party B's construction personnel must abide by the local customs, and are not allowed to make trouble by drinking, fighting and fighting, and pay attention to their life style.
1 1.3 When Party B enters the site, all data measured by Party A must be rechecked. If the data reviewed by Party B is inconsistent with the drawings, it shall promptly notify Party A to check.
12. ancillary works such as retaining wall, rolling, dredging, pumping and sewer installation shall not affect Party B's construction. If yes, it shall be implemented according to Article 6 of Item 10.
13. This contract shall come into effect after being signed and sealed by both parties. After the project is completed, all the project funds are settled, and this contract will automatically become invalid.
Fourteen Matters not covered in this contract shall be settled by both parties through consultation.
15. This contract is made in triplicate, one for each party, with the same legal effect.
Party A: Party B:
Legal person (signature): Legal person (signature):
Year, month, sun, moon, sun.
Model essay on earthwork contract II
Party A:
Party B:
In order to clarify the rights and responsibilities of Party A and Party B, according to the Contract Law of People's Republic of China (PRC), Construction Law of People's Republic of China (PRC) and other relevant laws and regulations, combined with the actual situation of this project, and following the principles of equality, voluntariness, fairness, honesty and credibility, both parties reached an agreement on the construction of this project.
I. Project name:
Second, the project site selection:
3. Work content: leveling the site, organizing labor and technical equipment, blasting excavation of earthwork, surface clearing and dredging, on-site deployment and transportation of earthwork and waste residue, safety protection facilities for surrounding buildings and residents, compilation of engineering data, compaction sampling test, and on-site safety and civilized construction measures, which are the same as those of surrounding government units including sanitation, urban construction, public security, transportation, construction committee, sub-district offices, neighborhood committees and surrounding areas.
Four. Scope of work:
According to the construction drawings provided by Party A and the construction organization design approved by Party A, the construction will be carried out in the designated area on site, and the remaining soil will be transported to the slag yard, which will be implemented by Party B itself, and Party A will not be responsible for it.
V. Term of the contract:
Commencement date: _ _ _ _ _ _ _ _: Completion date: _ _ _ _ _ _. Total calendar days of contract duration.
Contract price of intransitive verbs:
This contract is a lump-sum contract with unit price, that is, labor cost, material cost, machinery cost (including the import and export fee of machinery and equipment), management fee, insurance premium, profit, tax, environmental sanitation slag discharge fee, waste soil fee, social relations coordination around the project, etc. The unit price required by Party B to complete all the project contents and work contents agreed in this contract is:
1, the backfill part is on site.
(1) shale (loose rock) backfill, with the lump sum price of RMB /m3.
2, more than soil outbound part
(1) No matter how far the transportation distance is, the quantity of outbound transportation shall be implemented at the lump sum price of RMB /m3.
3. Others
If Party A needs to temporarily rent machinery and equipment from Party B, the rent shall be calculated according to the market price during the lease period, and the shift of machinery and equipment shall be subject to the visa of the personnel designated by Party A. ..
Seven, project settlement:
After the project is completed and accepted.
Settlement shall be made according to the field measured grid of Party A and Party B and the actual quantity of the receiver. After settlement, 85% of the settlement amount shall be paid in one lump sum, and the balance shall be paid within two months.
Eight, engineering quality and technical requirements:
This project is constructed and accepted in strict accordance with the current national Code for Acceptance of Construction Quality of Earthwork Blasting Engineering, Standard for Inspection and Evaluation of Construction Engineering Quality and Code for Acceptance of Construction Quality of Building Foundation and Foundation Engineering. At the same time, the contract stipulates that:
1. After the earthwork construction is completed, the error between the acceptance elevation and the design elevation is not greater than 10cm, and the vertical plane is unbiased.
2. Before Party A enters the site for construction, it must submit to Party A 7 days in advance: earthwork allocation and outbound construction plan, safe and civilized construction plan and quality progress guarantee measures.
3. The filled soil in the site must be compacted by layers, and it is best to backfill the earthwork in shale. If the earthwork in shale is left, sand and gravel shall not be backfilled.
4. Within 6m of the outer edge of the building and its foundation, the backfill earthwork must be rolled by layers, and the compactness shall not be less than 90%.
5. As-built data is a single slide.
Nine, safety construction:
Party B shall carry out the construction in strict accordance with relevant national safety construction codes and take strict and effective safety protection measures. During the construction period, Party B shall be responsible for any accidents related to this project.
X. liability for breach of contract:
1. Subcontracting is not allowed for this contract project. If Party A verifies that Party B has subcontracted, Party A has the right to terminate the contract unilaterally, and Party B must leave unconditionally within 3 days after receiving the written notice from Party A, and bear 20% of the total project workload as liquidated damages.
XI。 This contract is made in sextuplicate, with Party A holding four copies and Party B holding two copies. It will come into effect after being signed and sealed by both parties, and will naturally become invalid after the project is accepted and the balance is settled. Other matters not covered shall be settled by both parties through consultation.
Employer: Contractor:
Legal representative:
Entrusted agent:
Model essay on earthwork contract 3
Party A:
Party B:
Through friendly negotiation between Party A and Party B, Party A decides to contract out the flat foundation earthwork of this plot to Party B, and Party B will organize mechanical equipment and personnel to enter the site for construction. The specific terms are as follows:
1. Scope and content of project contracting: The estimated earthwork volume of the flat foundation of this plot is m? (subject to), regardless of rock and earthwork categories, comprehensive prices shall be implemented. Party B is responsible for blasting and transporting earth and stone to the spoil site designated by Party A (within the transportation distance of m, Party A will make up the difference if it exceeds m) and leveling the site (the error is 300㎜).
Second, the construction period and quality: the construction period is calculated from days, and the quantities within the contracted scope must be completed within years, months and days. The quality is qualified.
Three. Project contract price and allocation: comprehensive price yuan/meter? It is estimated that the total cost is 10 thousand yuan. The down payment is% of the estimated total cost (i.e. RMB10,000.00 yuan), which shall be paid when Party B's mechanical equipment comes into the site. The second payment is% of the estimated total cost, that is, RMB10,000.00 Yuan, which will be paid when Party B's mechanical equipment comes into the site. Pay by bank check.
4. Project progress payment and payment: the progress payment shall be paid by% of the actual construction output value of Party B in the current month. Party B shall report the monthly construction progress to Party A, and pay the progress payment within one month after being audited by Party A. ..
5. Project completion and final payment: After the project is completed, Party B shall notify Party A in writing, and Party A shall organize acceptance within the day after receiving the notice, otherwise it shall be deemed that Party A agrees that the project contracted by Party B has been completed, and the date of written notice shall be the completion date. Complete the completion settlement within the project completion date and pay off the balance of the project.
Duties and obligations of Party A:
1. Provide information on the construction site and surrounding underground pipe networks, ancient trees, historical sites or cultural relics that need to be protected, and bear the protection (relocation) expenses if any.
2. Provide leveling elevation, leveling control points, leveling boundary lines and intersections (lines) on site.
3. On-site representative, responsibilities and authority, contact information:
Seven. Responsibilities and obligations of Party B:
1, responsible for safe construction and civilized construction. Organize the construction force to complete the construction task with good quality and quantity within the time limit stipulated in the contract.
2. According to the contract, report the construction progress of the month to Party A on time every month, and cooperate with Party A to do the follow-up work.
3, in the process of construction, such as geological anomalies, should immediately report to Party A, in order to get properly handled, leaving no future trouble.
4. If there is any work beyond the scope of the contract, you should immediately contact Party A for visa formalities.
5. On-site representative, responsibilities and authority, contact information:
Eight. Breach of Contract and Punishment: This contract is made in duplicate, which has the same legal effect after being signed by the representatives of Party A and Party B (legal persons) and stamped with the official seal of the enterprise, and both parties shall abide by it. If Party B fails to complete the construction task as agreed in the contract, Party A has the right to terminate the contract, and Party B shall bear all the economic losses caused to Party A, and impose a fine of% (per day) of the loss amount. If Party A fails to pay the project payment (including the progress payment) on time as agreed in the contract, Party B has the right to stop the construction, and Party A shall bear all the losses of Party B during the shutdown period in full, and impose a fine of% (daily) of the default amount; If Party A fails to cooperate to complete the project completion settlement within the time limit agreed in the contract, it can be regarded as that Party A agrees to the project completion settlement amount reported by Party B, and the liquidated damages shall be calculated according to the agreed date.
Nine. Others:
Party a: party b: legal person: legal person: entrusted agent: entrusted agent: tel: MM DD YY.
There are three related clauses in the 2020 earthwork contract:
★ Earthwork Contract in 2020
★ Complete Works of Three Construction Contracts in 2020
★ There are 3 model clauses for muck transport contract in 2020.
★ The latest model essay collection of engineering contract in 2020
★ 3 copies of model clauses of project entrustment contract in 2020.
★ Four demonstration clauses of the project contracting agreement in 2020
★ Collection of model essays on land contracting in 2020
★ 3 copies of the latest business contract model in 2020.
★ There are 3 model contracts for on-site materials transportation in 2020.
★ Model earthwork contract
- Related articles
- Weather and road conditions from Longchuan to Xiamen
- Shanxi Spring Festival custom
- A good place to visit Beijing in summer.
- Words to recite after graduating from the sixth grade of primary school
- Poems containing zhe characters
- Is there any information about the coach from Chaohu to Yang Guo or Hefei to Yang Guo?
- Simple Korean greetings, the best homophonic, thank you! ! ! !
- Nursing care of fever
- Hot water pond weather
- 4~ 1 1 what to wear?