Traditional Culture Encyclopedia - Weather inquiry - Safety measures for tower installation and construction?

Safety measures for tower installation and construction?

1, familiar with the professional technology and process of this type of work;

2. The team leader shall organize and lead the safety work of the construction team, take practical safety measures at the site, and educate all personnel on the safety system and technical operation procedures;

3, at least 18 years old, can be engaged in aerial work after passing the physical examination; Anyone who suffers from hypertension, heart disease, epilepsy, mental illness, severe visual and hearing impairment and other personnel who are not suitable for aerial work is prohibited from aerial work;

4, after accepting the installation task, should be familiar with drawings, structure, indicators, requirements and terrain, formulate specific construction plan, and organize their implementation;

5, aerial work personnel and site monitoring personnel must obey the unified command and management of the construction director;

6. Adhere to safety first and civilized construction to ensure the quality of engineering services;

7, regular safety inspection, found that the construction personnel do not comply with the safety system and technical operation procedures must be stopped immediately, in an emergency, should stop working;

8, in the construction, safe and reliable protective measures must be taken, a full-time security officer;

9, aerial work personnel must report to the captain in time if there is any physical abnormality;

10. The operator is forbidden to drink alcohol before operation and during lunch break, and it is forbidden to play, joke or throw objects at high altitude and on the hanging board;

1 1, protective equipment should be neatly dressed, pants corners should be tied, safety helmet should be worn, and smooth hard-soled shoes are not allowed; When moving the working face horizontally, the tail rope must be tied; There should be a safety belt with sufficient strength, and the rope should be firmly tied to the solid building structure or metal structure frame, and it is not allowed to be tied to movable objects; It is forbidden to run up and down, jump over the head, and it is forbidden to drop things when working;

12, command by special personnel, hoist by special personnel, patrol pulley by special personnel, pull tail by special personnel, and enlarge tail rope by robot; Hoist drivers are not allowed to drive when they hear abnormal or unclear passwords;

13. Climbing tools and safety appliances (such as safety helmet, safety belt, ladder, springboard, scaffold, protective board, safety net, etc.) used for mutual inspection must be safe and reliable, and it is forbidden to take risks;

14. The commonly used ropes, hanging plates and safety locks must be checked before operation. If any abnormality is found (such as more than 3 broken wires or strands), stop the machine immediately;

15, the personnel left behind on the ground and working high above the ground must greet, the tower construction personnel must wear walkie-talkies, and the personnel in each post must hear the password before operating the specific process;

16, fasten your seat belt when people climb the tower for inspection; Before climbing to a certain height for inspection, stamp a few feet on the tower to be crossed (just in case), and then check through the contact point after confirming safety;

17, ground workers are not allowed to gather people to make noise and fight while waiting for the next step;

18. After work, all falling objects, such as tools, scattered materials and spare parts, should be cleaned up in time to avoid falling and hurting people. When lifting large parts, reliable lifting tools should be used. Construction personnel should adhere to the system of cleaning before work every day to clear the site after work;

19, the construction site should be as flat as possible, that is, water supply, access, electricity supply and site leveling. The installation site should be clear, and the tower parts should not be too messy to avoid personnel mixing down;

20. Tools, parts and materials used for aerial work must be put into tool bags; Don't hold objects when going up and down; And must follow the designated route up and down, not throwing materials or tools at high altitude; Tools and materials that are easy to roll and slide shall not be stacked on the scaffold;

2 1. I will be responsible for the unfinished work of the previous day;

22. The ground of aerial work area should be marked with a restricted area, surrounded by ropes, and warning signs of "No Entry for Idle People" and "No Entry" should be hung; During construction at night, sufficient lighting facilities must be set up, otherwise construction is prohibited;

23, close to the power supply (low voltage) line before operation, should first contact the power outage personnel, and equipped with personnel to supervise whether the power outage at the scene, until the power supply is restored to leave; The operator should be at least 2m away from the power line (low voltage); It is forbidden to work under high voltage lines;

24, it is forbidden to vertical operation at the same time; If vertical operation is required under special circumstances, it shall be approved by the relevant leaders, and a special protective shed or other isolation facilities shall be set between the upper and lower floors;

25. Cross operation is not allowed on the construction site. Under special circumstances, if it is really necessary to cross construction, it shall be approved by the relevant departments, otherwise it shall not be constructed;

26, it is strictly prohibited to sit at high altitude without railings to rest, to prevent falling;

27, hoist and other lifting equipment are strictly prohibited manned up and down;

28, scaffolding load, no more than 270 kilograms per square meter, such as load must be increased, the shelf should be properly reinforced;

29, more than 3 meters long planking can't stand two people working at the same time;

30, scaffolding ramps, springboard and means of transport, should be cleaned at any time; If there is mud, water, ice and snow, effective anti-skid measures should be taken, and construction can only be started after inspection and approval by security personnel; Stop aerial work when the frozen snow cannot be removed seriously;

3 1, in case of strong wind above level 6, open-air aerial work is prohibited;

32, when using a ladder, you must first check whether the ladder is firm, whether it meets the safety requirements; The gradient of the vertical ladder is 60; The width of the ladder bottom is not less than 50 cm, and there should be anti-skid devices; There is no hook at the top of the ladder. When the foot of the ladder is unstable, there must be an escalator, and the rope of the herringbone ladder must be firm;

33. In addition to the person carrying nylon rope in the tower, the pulley rope worker must climb up the tower, especially the pulley worker must hang up the hook;

34, when grinding the ground evenly, not suddenly hard, ground objects dangling, you must use a safety card, people are not allowed to leave;

35. When installing with a grinder, if the grinder is fixed on the ladder, you must first tie two wire rods on the ladder with iron wire to avoid damaging the ladder at work;

36, tower building construction, first of all, when hanging parts upstairs, the bracket must be fixed firmly to prevent accidents when hanging parts, in the installation process, there must be someone to pay attention to the safety of pedestrians and vehicles downstairs;

37. Ladders used for aerial work shall not be short of gears or elevated; The upper end should be fastened firmly, and the lower end should have anti-skid facilities; It is forbidden for two people to work on the 1 ladder at the same time;

38. The disassembly and assembly of tower crane must be carried out during the day. If you need to speed up the progress, you can carry out some assembly work at night with good lighting conditions, not in windy, foggy and rainy and snowy weather;

39, in the process of disassembly, such as sudden power failure, mechanical failure, sudden weather change, etc. Can't continue to work, or when it is time to stop the operation, it is necessary to make the components installed and disassembled by the crane reach a stable state and have been locked firmly, all structural components have been firmly connected, and the center of gravity of the top of the tower is at the center of the four-sided support at the bottom of the tower, and then stop the operation after inspection and confirmation;

40. Before working at heights, safety technical disclosure should be made. Defects and hidden dangers of safety facilities found in the operation must be solved in time, and the operation must be stopped when personal safety is endangered;

42. The materials used in aerial work must be piled up smoothly, and shall not be placed near the limb or the mouth of the cave. The walkways, maintenance boards and climbing appliances in the operation must be cleaned at any time; Dismantled materials, surplus materials and waste materials shall be cleaned up and transported away in time, and shall not be placed at will or discarded downward; All kinds of construction workplaces, where there is a possibility of falling materials, should be cleared or fixed first to prevent people from falling;

44. When hoisting components, steel binding, concrete pouring, etc., the equipment and tools used, such as cable hanging scaffolding, hanging plates, hanging cages, platforms, etc., should be qualified products after testing and identification; When binding reinforcement, be careful not to stand on the reinforcement skeleton or climb up and down;

For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd