Traditional Culture Encyclopedia - Weather inquiry - Steps of heatstroke prevention and cooling activities (7 selected articles)
Steps of heatstroke prevention and cooling activities (7 selected articles)
Steps of heatstroke prevention and cooling activity planning (7 selected articles) Part 1? First, the purpose and requirements of the exercise.
? This plan is formulated in order to implement the occupational health and safety management system standards, deal with the potential hidden dangers of heatstroke prevention and cooling accidents, ensure the personal safety of employees, clarify the emergency rescue procedures and ensure the orderly implementation of the emergency plan.
? Second, prepare for the exam.
? 1, Law of People's Republic of China (PRC) on Work Safety.
? 2. Regulations on the safety management of hazardous chemicals.
? 3, the production and business units of production safety accident emergency plan guide "
? 3. Time, place and participants of the exercise.
? 1. Exercise time: xx, xx, 13: 00- 13: 30.
? 2. Drill place: the area near the operation side of xx crosscutting unit 1# stacking in the production department.
? 3. Participants in the exercise: the exercise leading group, operation area A, warehouse class A and package turning group.
? Fourth, the exercise leading group.
? 1. Team leader: xx.
? 2. Deputy leaders: xx (command), xx (organization) and xx (organization).
? 3. planning: xx.
? 4. Team members: xx, xx, xx.
? V. Rescue equipment and materials:
? First-aid kit (medical alcohol, Ren Dan, ten drops of water, Huoxiang Zhengqi water, bandage, disinfectant), communication tools, towels, mineral water and electric fans.
? Six, the exercise process:
? 1, crosscutting employee xx fell to the ground due to heatstroke during 1# stacking operation (simulated accident). After the monitor xx found out, he informed the shift supervisor xx.
? 2. After receiving the accident report, the operation chief xx immediately reports to the exercise leading group, and at the same time starts the emergency plan to organize on-site rescue.
? 3.xx: During the rescue, isolate and protect the site, evacuate irrelevant personnel and protect the accident site.
? Seven, first aid steps:
? 1. Move: The chief operator xx organized the on-site personnel to quickly lift the heatstroke employee xx to a ventilated, cool and sweet place, so that he could lie flat and raise his head, unbutton his clothes and loosen his belt and cuffs.
? 2, cooling: put a wet towel on the patient's head, bath with cold water, accelerate heat dissipation, but can not directly blow the patient to prevent colds.
? 3, hydrating: If the heatstroke is conscious and has no nausea and vomiting, you can drink salt and soda to cool down and replenish blood volume. When hydrating, don't rush to replenish plenty of water to avoid vomiting, abdominal pain, nausea and other symptoms.
? 4. Wake up: If the patient has lost consciousness, you can refer to acupoints such as Pinren and Hegu to wake him up. If breathing stops, artificial respiration should be performed immediately.
? 5. Transfer: For patients with severe heatstroke, they must be sent to the hospital for treatment in time. Physical cooling should be carried out as much as possible during transportation to protect important organs such as brain, heart and lungs. You can apply a cold compress on your head or rub it with medical alcohol until your skin turns red.
? 6. Heatstroke employees wake up slowly after emergency rescue.
? 7. After confirmation, the operation chief Wei Yan reported to the exercise leading group that the on-site exercise of the emergency plan for heatstroke prevention and cooling was over.
? Eight, the exercise leading group announced the end of the exercise after summing up the exercise.
? Nine, the exercise personnel evacuated from the exercise site, and all units resumed operations.
? Ten, summarize the problems existing in the exercise and make improvement plan.
Steps of heatstroke prevention and cooling activities planning (7 selected articles) Part II? In order to timely and effectively prevent and deal with heatstroke events caused by high-temperature meteorological conditions, guide and standardize the health emergency work of high-temperature heatstroke events, ensure public health and life safety, and maintain normal social order, this plan is formulated as follows:
? 1, earnestly implement the responsibility system for heatstroke prevention and cooling. Relevant units should conscientiously implement a series of requirements for heatstroke prevention and cooling at the construction site, strengthen the organization and leadership of heatstroke prevention and cooling with a highly responsible attitude towards the life and health of frontline construction personnel, improve and implement the responsibility system, formulate emergency plans, and pay close attention to the implementation of preventive measures to prevent workers from heatstroke and various production safety accidents caused by high temperature weather.
? 2, reasonable arrangement of work and rest time. Pay close attention to the weather forecast of high temperature weather. Meteorology defines the maximum daily temperature as "high temperature day" when it is greater than or equal to 35 degrees Celsius, and the "high temperature day" that lasts for more than 5 days is called "continuous high temperature". Strictly implement the measures of "grasping at both ends and intermittently" to avoid high temperature, appropriately adjust the labor rest system for high temperature operation in summer, reduce labor intensity, strictly control outdoor operation time, avoid operation during high temperature period, and ensure the health and life safety of workers. In principle, when the temperature exceeds 37℃, outdoor operation is strictly prohibited from1:00 to 15: 00.
? 3. Ensure that there is enough drinking water supply at the site. Adequate drinking water, beverages, tea and various soups that meet the hygiene requirements should be supplied on site to effectively prevent heatstroke and avoid heatstroke.
? 4. Strengthen the rotation rest at work. In summer, according to the technological process of construction, the labor organization should be adjusted as much as possible, and frequent shifts should be adopted to shorten the continuous operation time and strengthen the rotation rest at work. Strengthen on-site inspections, increase the publicity of heatstroke prevention and cooling knowledge and heatstroke first aid knowledge, and improve the safety awareness of all staff.
? 5. Actively improve the production and living environment of construction sites. We should conscientiously implement the Regulations on the Management of Construction Sites, actively take measures to strengthen ventilation and cooling, ensure that temporary facilities such as dormitories, canteens, toilets and showers for construction workers meet the needs of heatstroke prevention and cooling, and provide cool drinks and commonly used heatstroke prevention drugs for construction workers. Electric fans must be installed in the dormitory and canteen of the construction site, and units with conditions should install air conditioners in the dormitory.
? 6. Implement heatstroke prevention and cooling items. We should pay close attention to the front-line construction workers who insist on construction in hot weather, strengthen the propaganda of heatstroke prevention and cooling knowledge, require construction workers to carry heatstroke prevention drugs with them, such as Ren Dan, cooling oil and wind oil essence, and implement heatstroke prevention and cooling items for each worker.
? 7, do a good job of fire prevention in summer. In view of the fact that summer is hot, dry and prone to fire accidents, further strengthen fire prevention measures and regularly check flammable places such as power distribution room, warehouse and paint room. When problems are found, deal with them immediately, and equip them with fire-fighting equipment according to regulations.
? 8. Do a good job in health and epidemic prevention. It is necessary to do a good job in health and epidemic prevention in the construction site and living quarters, strengthen the sanitary management of drinking water and food, strictly implement the food hygiene system, and avoid poisoning incidents caused by food deterioration; Strengthen the monitoring of summer-prone diseases. In case of legal infectious diseases and food poisoning, the on-site staff shall report to the relevant competent departments in time.
Steps of heatstroke prevention and cooling activities planning (selected 7 articles) The third article? It is very hot in summer, and the temperature rises gradually. In order to further do a good job of heatstroke prevention and cooling in summer, ensure the physical and mental health of employees, improve the enthusiasm of employees, and ensure the safe, efficient and high-quality completion of various tasks in a high-temperature environment, the company decided to carry out a summer cooling activity, and the relevant activity plan is hereby notified as follows:
? I. Activity time
? 20xx August 5 ~ August 10
? Second, the activity requirements
? 1, the department heads uniformly deploy the assigned project delivery activities.
? 2. Each department will deliver heatstroke prevention and cooling articles to each project department in time within one week.
? 3. During the activity, we should pay special attention to the weather forecast, adjust the activity plan in time, and ensure the cool service on key days and time periods.
? 4. Require all departments to communicate with the employees of the project department while sending coolness, understand the needs of employees, and convey the company's concern to every employee.
Steps of heatstroke prevention and cooling activities planning (selected 7 articles) The fourth article? In summer, due to the hot weather, remind everyone to do all the sun protection and heatstroke prevention measures before going out, pay attention to the adjustment of indoor and outdoor temperatures, drink plenty of water and stay healthy.
? Meteorology defines the daily maximum temperature as "high temperature day" when it is greater than or equal to 35 degrees Celsius, and "high temperature day" when it lasts for more than 5 days is called "continuous high temperature". When the temperature is too high, people's gastrointestinal function will be relatively weakened due to the stimulation of summer heat, which is prone to top-heavy, chest tightness, loss of appetite and other uncomfortable symptoms, and even cause heatstroke, which is harmful to health.
? When the weather is hot, try to avoid outdoor work or activities in strong sunlight, especially in the afternoon high temperature period and the old, weak, sick and young people; When working or doing activities outdoors, avoid being exposed to the sun for a long time and take sun protection measures: wear light or plain clothes and bring a sun hat, straw hat or umbrella; Drink plenty of water, especially salty water, and carry heatstroke prevention drugs with you, such as cooling oil and wind oil essence. In high-temperature workplaces, enterprises should take effective measures to prevent heatstroke and cool down, strengthen the publicity of employees' knowledge of heatstroke prevention and cooling down, rationally allocate employees' working hours, avoid outdoor operations during high-temperature periods, and reduce labor intensity. You can also adjust your diet, drink mung bean soup, and cook porridge with lotus seeds, mint, lotus leaves, japonica rice and rock sugar. It is not only sweet and refreshing, but also a good medicine for clearing away heat and relieving summer heat, which can effectively prevent heatstroke and avoid heatstroke.
? Summer heat, high temperature and dryness often make people eat tasteless and sleep badly, and are prone to dizziness, headache, fatigue and even nausea and vomiting. In order to spend the summer safely, families should prepare some heatstroke prevention drugs. Common drugs and foods are:
? Ten drops of water: it can clear the summer heat and dispel the cold. It is suitable for dizziness, nausea and vomiting, chest tightness and diarrhea caused by heatstroke.
? Huoxiang Zhengqi Water: It can clear away heat and relieve summer heat and relieve exterior syndrome. It is suitable for dizziness, abdominal pain, vomiting and diarrhea caused by common cold in summer.
? Cool oil: it can clear away heat and detoxify. Can be used for treating dizziness and headache caused by summer heat or diarrhea caused by thirst.
? Honeysuckle: It has the functions of clearing away heat, relieving summer heat, detoxifying and stopping dysentery. Use boiled water instead of tea.
? Chrysanthemum: It has the effects of relieving summer heat, calming the liver and diuresis. Patients with hypertension are especially suitable. Use boiled water instead of tea.
? Lotus leaf: it is suitable for those who are upset, chest tightness, dizziness and headache caused by heatstroke, especially those with hypertension.
? Watermelon: Watermelon is a natural white tiger soup, which has a good effect of clearing away heat and nourishing yin, and is a good product for cooling off summer heat and drinking.
? Symptoms of heatstroke and first aid methods
? 1. Symptoms of heatstroke
? (1) threatened heatstroke: hyperhidrosis, thirst, dizziness, tinnitus, chest tightness, palpitation, nausea, elevated body temperature and general weakness.
? (2) Mild heatstroke: In addition to the above symptoms, the body temperature is above 38℃, facial flushing, chest tightness, pallor, nausea, vomiting, sweating, cold skin, blood pressure drop and other early symptoms of respiratory and circulatory failure.
? (3) Severe heatstroke: In addition to the above symptoms, there are also symptoms such as syncope and spasm, dry skin and no sweat, and body temperature above 40℃.
? 2. Emergency measures after heatstroke:
? (1) Move heatstroke patients to a cool and ventilated place quickly.
? (2) Take off or loosen clothes and let the patient rest on his back.
? (3) Give patients cold drinks containing salt or cold boiled water containing 0. 1%~0.3% salt.
? (4) Wipe your body with cold water or alcohol (mainly wiping your armpits and groin) to help dissipate heat.
? (5) Patients with severe heatstroke should be sent to hospital immediately for rescue.
Steps of heatstroke prevention and cooling activities planning (selected 7 articles) Article 5? 1, use:
? In midsummer, the sunshine intensity is strong and the hot weather continues. In order to do a good job in heatstroke prevention and cooling at the construction site in summer, ensure the health of construction workers, continuously improve working conditions, and prevent production safety accidents such as heatstroke caused by high temperature weather, these measures are specially formulated.
? 2. Scope of application:
? This system is applicable to xx Project Department of xx Power Construction Company.
? 3. Specific provisions:
? (1) Seriously implement the responsibility system for heatstroke prevention and cooling.
? Relevant units should conscientiously implement a series of requirements for heatstroke prevention and cooling at the construction site, strengthen the organization and leadership of heatstroke prevention and cooling with a highly responsible attitude towards the life and health of frontline construction personnel, improve and implement the responsibility system, formulate emergency plans, and pay close attention to the implementation of preventive measures to prevent workers from heatstroke and various production safety accidents caused by high temperature weather.
? (2) Reasonable arrangement of work and rest time.
? Pay close attention to the weather forecast of high temperature weather. Meteorology defines the maximum daily temperature as "high temperature day" when it is greater than or equal to 35 degrees Celsius, and the "high temperature day" that lasts for more than 5 days is called "continuous high temperature". Strictly implement the measures of "grasping at both ends and intermittently" to avoid high temperature, appropriately adjust the labor rest system for high temperature operation in summer, reduce labor intensity, strictly control outdoor operation time, avoid operation during high temperature period, and ensure the health and life safety of workers. In principle, when the temperature exceeds 37℃, outdoor operation is strictly prohibited from1:00 to 15: 00.
? (3) Strengthen the rotation rest at work.
? In summer, according to the technological process of construction, the labor organization should be adjusted as much as possible, and frequent shifts should be adopted to shorten the continuous operation time and strengthen the rotation rest at work. Strengthen on-site inspections, increase the publicity of heatstroke prevention and cooling knowledge and heatstroke first aid knowledge, and improve the safety awareness of all staff.
? (4) Ensure that there is enough drinking water supply at the site.
? Adequate drinking water, beverages, tea and various soups that meet the hygiene requirements should be supplied on site to effectively prevent heatstroke and avoid heatstroke.
? (5) Implement heatstroke prevention and cooling items.
? We should pay close attention to the front-line construction workers who insist on construction in hot weather, strengthen the propaganda of heatstroke prevention and cooling knowledge, require construction workers to carry heatstroke prevention drugs with them, such as Ren Dan, cooling oil and wind oil essence, and implement heatstroke prevention and cooling items for each worker.
? (6) Actively improve the production and living environment of the construction site.
? We should conscientiously implement the Regulations on the Management of Construction Sites, actively take measures to strengthen ventilation and cooling, ensure that temporary facilities such as dormitories, canteens, toilets and showers for construction workers meet the needs of heatstroke prevention and cooling, and provide cool drinks and commonly used heatstroke prevention drugs for construction workers. Electric fans must be installed in the dormitory and canteen of the construction site. Conditional units should install air conditioning in the dormitory.
? (seven) do a good job in health and epidemic prevention.
? It is necessary to do a good job in health and epidemic prevention in the construction site and living quarters, strengthen the sanitary management of drinking water and food, strictly implement the food hygiene system, and avoid poisoning incidents caused by food deterioration; Strengthen the monitoring of summer-prone diseases. In case of legal infectious diseases and food poisoning, the on-site staff shall report to the relevant competent departments in time.
? (8) Do a good job of fire prevention in summer.
? In view of the fact that summer is hot, dry and prone to fire accidents, further strengthen fire prevention measures and regularly check flammable places such as power distribution room, warehouse and paint room. When problems are found, deal with them immediately, and equip them with fire-fighting equipment as required.
Steps of heatstroke prevention and cooling activities planning (selected 7 articles) Article 6? At present, it is in the hot season, and the continuous hot and humid weather has a great impact on people's physical and mental health, especially on the physical and mental fatigue of production workers, leading to various accidents. Combined with the actual situation of our construction site, we must pay attention to summer protection to minimize the occurrence of summer accidents.
? To this end, the project department set up the following leading group:
? Team leader: Zhao Xianping
? Members: Mao Jiaping, Liu, Qu Qinghua, Zheng E,
? A, the leading group in line with the attitude of being highly responsible for the life and health of frontline construction personnel, earnestly strengthen the organization and leadership of heatstroke prevention and cooling, improve and implement the responsibility system for production safety during high temperature, formulate emergency plans, and implement preventive measures to prevent workers from heatstroke and various production accidents caused by high temperature weather.
? Second, pay close attention to the safety and health of frontline construction workers who insist on construction in high temperature weather, allocate time reasonably, avoid outdoor work in high temperature period, improve working conditions, reduce labor intensity and create a good working and rest environment.
? Third, ensure that temporary facilities such as dormitory, canteen, toilet and shower room of construction personnel meet the standards and meet the needs of heatstroke prevention and cooling.
? Fourth, heatstroke prevention and cooling measures
? 1, reasonably arrange the labor and rest time of workers exposed to high temperature, reduce the labor intensity, shorten or avoid the operation time of workers exposed to high temperature, and ensure that workers exposed to high temperature have sufficient sleep time.
? 2, the construction site, team leader to uninterrupted supply of tea, cool drinks and heatstroke prevention drugs.
? 3. Arrange employees' rest time reasonably and pay attention to the combination of work and rest. If the temperature exceeds 35℃ that day, the working hours can be appropriately reduced and the rest time at noon can be extended.
? 4, strengthen the management of staff dormitory, do a good job in dormitory ventilation facilities, do a good job in dormitory environmental sanitation, regular disinfection and mosquito prevention, and do a good job in comprehensive management of environmental sanitation on the construction site.
? 5. Prepare some commonly used heatstroke prevention and cooling drugs, such as Ren Dan, Shidishui, Shu Jie Tablet, Musk Zhengqi Pill, and cool oil.
? 6. Establish a medical rescue agreement with the local hospital as the guarantee of medical rescue on the construction site, so as to deal with sudden casualty accidents in time.
? V. Contingency planning
? (a) aura and mild heatstroke
? 1. Leave the high temperature environment immediately, rest quietly in a cool and ventilated place, unbutton your clothes to help your body cool down, and give cool and salty drinks appropriately.
? 2. Use Dan, Shidishui, Shu Jie Tablets (1-4 tablets), Shexiang Zhengqi Pills, or apply cooling oil, and scrapping therapy is also acceptable.
? 3. Acupuncture Hegu, Dachong, Dazhui, Fengchi and Zusanli.
? People with high body temperature can use cold compress or cold water or ice water to help dissipate heat.
? 5, peripheral circulation failure can be given glucose saline intravenous drip, etc.
? (2) Severe heatstroke
? 1, physical cooling: quickly rub the whole body with cold water (ice water or water with a little alcohol) to make the skin red, add a fan to cool down, and put water bags or ice bags on the head, neck, armpits and groin.
? 2. Send to the hospital immediately.
? Six, adjust from the daily diet, require regular heatstroke prevention and cooling work, be responsible for every employee, and ensure efficient and high-quality completion of engineering tasks.
Steps of heatstroke prevention and cooling activities planning (selected 7 articles) Article 7? In order to do a good job of personal safety in summer and ensure the safety and health of employees in hot, humid and hot weather in summer, Handan Works Section has formulated a 20xx summer heatstroke prevention and cooling labor protection implementation plan according to the relevant documents of higher authorities.
? Specific measures for heatstroke prevention and cooling. In summer, there are many high temperature, humidity and thunderstorms, which have a great impact on workers' work safety and are the focus of labor safety risk control. All departments and workshops should raise awareness, implement responsibilities, implement personal safety control measures in summer, and regularly carry out safety early warning tips, safety inspections and heatstroke prevention knowledge education in accordance with the principles of "taking responsibility step by step, strengthening leadership, giving priority to education, ensuring system" and "early planning, early preparation and early management".
? Strengthen the publicity, education and training of workers' safety knowledge about heatstroke prevention and cooling. Led by the vocational education department, with the propaganda and cooperation of the safety supervision department, the labor department and the Party committee, and in combination with the safety production month activities, before June 15, a systematic special publicity, education and training examination on heatstroke prevention knowledge, safety measures such as collision prevention and electric shock prevention, on-site emergency plan and self-help knowledge will be organized for workers.
? Do a good job in the investigation and rectification of hidden dangers of power lines and electrical equipment. Led by the security department, organize full-time (part-time) electricians in Handan comprehensive mechanical repair workshop and other workshops to conduct a comprehensive registration inspection of various electrical circuits, electric tools, power switch boxes, household appliances, leakage protectors and other facilities, register hidden problems found in the inspection in time, formulate rectification measures, implement the responsible person and time requirements, and immediately rectify the cancellation number.
? Strengthen the organization of high temperature labor production in summer. The labor department (labor department) is responsible and other departments cooperate. During the extremely hot, humid and hot weather in summer, the labor department (Ministry of Labor) will issue a notice. According to the characteristics and specific conditions of production operations, while ensuring the quality of work, timely adjust the labor and rest system for high-temperature operations in summer, reduce the operation time in high-temperature period, shorten the continuous operation time, increase the rest, reduce the labor intensity, strictly control and avoid overtime, ensure full rest and ensure the energy of employees.
? The key to personal safety in the electrochemical section of card control. Each workshop should strictly implement the requirements of online operation in summer and operate according to the regulations. First, it is forbidden to walk in the heart and sleepers in rainy days, and it is strictly forbidden to shelter from the rain under the pillars and trees of catenary; Second, when rainy weather approaches the line, it is forbidden to use metal umbrella; 3. In thunderstorm weather, it is forbidden for operators to stay near the pillars, stay wires and grounding wires of catenary, and stay under trees and metal components near catenary (within 5 meters); Fourth, pay attention to the trees on both sides of the line when patrolling the equipment in rainy days. When it is found that trees are tilted or dumped on the line, it is forbidden to get close to dangerous trees to prevent personal injury accidents such as electric shock and smashing, and immediately report to the station and depot safety production dispatching command center to take corresponding safety measures; Five, the rail car is used for loading and unloading road materials, and the tools used shall not exceed the top of the head, and keep a safe distance of more than 2 meters from the live part of the catenary.
? At the same time, the monthly safety analysis meeting in summer (end-of-season safety committee) is required to analyze the implementation of personal safety measures in summer and solve existing problems in time, and the monthly safety analysis meeting of each workshop and team should analyze the personal safety situation.
- Previous article:Spit out the idiom hot weather?
- Next article:How to express that the weather is very cold
- Related articles
- What will the weather be like in Beijing tomorrow?
- Xia Yan Junior High School in Liquan County was built in that year.
- Free scenic spots in Jiangxi on March 8th Women's Day 20 19 Jiangxi Women's Day travel discount
- Why is the yellow calendar of 9 1 different from the old one?
- What time is the earliest bus from Jiujiang New Station (coach station) to Xingzi Wenquan City? How much is once in a while?
- What days are cooler in Chongqing in July and August?
- What weather?
- Daocheng Aden Road Travel Raiders Daocheng Aden Road Travel Route
- The sentence of making hail is very simple
- What animals are there in the forest weather station?