Traditional Culture Encyclopedia - Weather inquiry - Three general sample essays on typhoon prevention work summary

Three general sample essays on typhoon prevention work summary

Typhoon is a common natural disaster. In order to let everyone know the importance of typhoon prevention, many cities in my country will carry out typhoon prevention work. Below are three general examples of typhoon prevention work summaries that I share with you for reference. You are welcome to read them.

? General template for typhoon prevention work summary

? In accordance with the work requirements of Hongshan Town on the prevention of the seventh strong typhoon Suli, since July 12, Fuyu Community The leaders attached great importance to it and held emergency meetings one after another to arrange deployment and prevention work. The relevant work is now reported as follows:

? 1. Raise awareness and strengthen leadership

? The community has fully implemented the first-in-command responsibility system, with the main leaders commanding from the front, making comprehensive arrangements, and scientifically dispatching , quickly launch relevant plans and enter a comprehensive emergency state to prevent typhoons. Since July 12, Secretary Li Fengyu of the community party committee has personally led the team and commanded the team. The emergency leadership team has also implemented a 24-hour leadership duty system to grasp typhoon dynamics and defense work information in a timely, comprehensive and accurate manner, ensuring that information is uploaded and distributed in a timely manner. Accurately, all typhoon defense work is carried out in a solid and orderly manner.

? 2. Strengthen measures and highlight key points

? 1. Do a solid job in publicity work on typhoon prevention. All grid members went down the grid to post emergency notices, and used small speakers to go deep into the new village buildings and courtyards in the area to conduct typhoon prevention warnings, so that residents could prepare for typhoons in advance, and reminded residents to put away flower pots and other hanging items on their balconies in time. , to avoid danger to pedestrians when a typhoon strikes,

? 2. Various flood prevention work

? Carry out 24-hour on-duty inspections of drainage ditches in the jurisdiction, and detect blockages in a timely manner dredge. Check whether there are dangerous walls and other conditions within the jurisdiction, report them promptly, and post no-travel signs to prevent vehicles and pedestrians from passing through.

For projects under construction, urge the construction team to strengthen the inspection and reinforcement of facilities and equipment that endanger personal safety, such as tower cranes, supports, foundation pits, and protective nets. It is required to prohibit construction during typhoons to ensure that the construction site is safe.

? Conducted a comprehensive inspection and registration of all large advertising plaques within the jurisdiction, and notified households and people of any hidden dangers. Reinforcement should be reinforced and dismantling should be carried out to ensure safety.

? For units or communities with underground parking garages, check their implementation of flood prevention materials, personnel in place, and whether the water pumps can operate normally.

? Put the safety of minors first. Promptly notify the closure of primary and secondary schools, kindergartens and other schools and community youth studios. All schools are also required to conduct comprehensive inspections and maintenance of school buildings, courtyard walls, and circuits.

?Chayuanshan Primary School is a disaster evacuation point for the community. The school leaders should be promptly notified to prepare for the disaster evacuation point to prevent it before it happens.

? General template for typhoon prevention work summary

? In order to further strengthen the implementation of emergency plan safeguard measures, improve the company's ability to respond to safety production accidents and emergencies, educate employees how to correctly , handle emergencies accurately and quickly, and specially organize various production departments to carry out emergency drills for flood control. The drill is summarized as follows:

? 1. Drill time:

? June XX 9 a.m. to 10 a.m. on March 22.

? 2. Drill content:

? Based on the problems that will occur during the operation of the mine tailings pond, it is mainly aimed at tailings pond overflow accidents. The specific emergency plan drills are as follows:

? In the event of heavy rain or flood emergency, the disaster-stricken area can be safely evacuated quickly, efficiently, and orderly, and flood prevention and rescue and disaster relief emergency work can be done well. Through this drill, we will further improve the emergency response capabilities of mine leaders and relevant departments to deal with floods, and improve employees' awareness of disaster prevention and avoidance. Once a disaster strikes, they can evacuate quickly and orderly safely, minimize the losses caused by floods, and protect the general public. Safety of employees’ lives and property.

? 3. Exercise summary:

? This flood and flood control exercise tested the normality and perfection of the mine's flood and flood control emergency plan system for tailings pond operation.

? This exercise achieved the following purposes:

? 1. Tested the smooth operation of the project department’s flood prevention and emergency response system and the coordination capabilities between various functional departments and groups, Through the cooperation of various flood control efforts, the collaborative combat capability has been improved, the emergency rescue coordination linkage mechanism and joint response mechanism have been strengthened, the emergency response capability has been improved, and the scientificity, timeliness and effectiveness of emergency response have been increased;

? 2. Tested the rationality and operability of the emergency plan, the accuracy and standardization of command and decision-making, the flexibility and scientificity of flood prevention and rescue dispatch, the ability to respond quickly to unexpected events, and improved the plan system, It has improved the rigor, pertinence and operability of the plan;

? 3. During the entire exercise, all responsible persons in the emergency system can be familiar with their work responsibilities in flood prevention and typhoon prevention, so as to prepare for actual situations. It provided valuable practical experience in solving problems;

? 4. This drill reflected the project department’s full preparations for flood prevention and typhoon prevention, and the on-site emergency rescue materials were fully prepared and all effective;

? p>

? 5. By actually participating in flood control drills, all construction personnel can be familiar with the flood control process and specific operation plans, so that they can avoid danger in time when encountering heavy rainfall and floods, and engage in emergency rescue in an orderly manner. At work.

? Problems in the process of this exercise:

? 1. Since some personnel participated in the flood prevention and rescue drill for the first time, they did not have enough understanding of the importance of effective cooperation between various functional groups, and sometimes there were The phenomenon of working independently and insufficient coordination and cooperation;

? 2. Frontline workers need to further strengthen their awareness of flood prevention safety;

? 3. Although the responsibilities of each functional group are clear, But the movements are not skillful enough;

? 4. The lines are not spoken cleverly enough during the rehearsal, and the atmosphere is not tense enough.

? 3. During the entire exercise, all responsible persons in the emergency response system were familiar with their respective work responsibilities during flood control, which provided valuable practical experience when encountering practical problems;

< p> ? General sample summary of typhoon prevention work

? Xinhong Street’s 20XX flood prevention and typhoon prevention work started from June 1 to October 10, totaling 132 days and nights. With the strong support of the leaders of Xinhong Subdistrict Office, under the command of the District Water Affairs Bureau and the District Flood Control Office, and with the full cooperation of the municipal drainage pump station maintenance unit, the district drainage pipe maintenance unit and the functional departments of Xinhong Subdistrict, the subdistrict 2013 Good results have been achieved in flood prevention and typhoon prevention work this year. Various pre-flood preparations were carried out in an orderly manner, mobilization and organization work was effective, corrective measures were implemented, emergency incidents were handled in a timely manner, the 2013 flood prevention and typhoon flood prevention period was successfully passed, and the set tasks were successfully completed.

? 1. Basic situation and characteristics of floods and disasters in 20XX

? This year, the district flood control headquarters issued a total of 12 early warnings at all levels, including typhoon warnings 2 times. According to the early warning mechanism for flood prevention and typhoon prevention, relevant street personnel actively attended their posts and stepped up their duties; in particular, various preparations for typhoons such as Suli and Feite were thoroughly and effectively implemented.

? Rain situation overview:

? The average rainfall in Shanghai during this year’s flood season is significantly less than that in normal flood seasons. The monthly rainfall distribution at Xujiahui Station in flood season is as follows: The rainfall in June is lower than normal. Slightly more; rainfall from July to September was significantly less than normal, about 50% less than normal, less than half of normal rainfall, and the temperature was unusually high; in early October, affected by Typhoon No. 23 Fitt, the rainfall was the highest in the past thirty years. The highest value of large-scale heavy rain in XX City. An overview of the main heavy rains affecting the XX area is as follows:

? June 7: There were widespread heavy rains and local heavy rains in Shanghai. This is the first heavy rain since Shanghai entered the flood season. The characteristics of this heavy rain are: first, the rainfall is large and wide, and second, the rain is fierce and powerful. The maximum one-hour rainfall is 48.0mm at Yunzaobang Dongzha Station and 47.5mm at Chenfangqiao Station. mm; cumulative rainfall in 6 stations exceeded 36mm in one hour.

? July 31: Local heavy rains and heavy rains, with the maximum daily rainfall of 107.5mm. Local heavy rains are mainly concentrated in XX and XX districts, and local heavy rains are mainly concentrated in Chongming, Baoshan and XX districts.

? August 1: Local heavy rain, also the largest rainfall in August. The maximum daily rainfall is 110.0mm at Caojiadu and Zhongshan Park stations in the city center. Local heavy rains are mainly concentrated in the city center, and local heavy rains are mainly distributed in Jiading, Minhang and XX districts.

? October 6th to 8th: Affected by Typhoon No. 23 Feite this year, Shanghai experienced widespread to heavy rains. Among the 440 measuring stations that measured rainfall data: Songjiang Industrial The daily rainfall of 157 measuring stations, including the District Station, Dongjing Industrial Zone Station, and Tongjing Station, reached the heavy rain standard, 211 measuring stations reached the heavy rain standard, and 34 measuring stations reached the heavy rain standard. Among them, rainfall is mainly concentrated in XX District, XX District, XX County, and XX District.

? Typhoon overview:

? From June 1st to October 9th this year, 24 typhoons (tropical storms) were generated in the northwest Pacific, and from October 6th to During the 9th, two typhoons landed on the coast of East my country, namely 1323 Feite and 1324 Danas. Affected by the peripheral cloud systems of these two typhoons, Shanghai suffered from general to heavy rains, local heavy rains, and rainfall. Mainly concentrated on October 7th and 8th, it was the highest level of large-scale heavy rain in XX City in the past 30 years, but it did not cause serious typhoon disasters.

? 2. Flood prevention and typhoon prevention work in 20XX

? 1. Scientific deployment and implementation of the flood control responsibility system

Participated by the main leaders of the sub-district office , heads of various functional departments in the subdistrict, top leaders of each village (neighborhood) committee, and representatives of important enterprises and units participated in the mobilization meeting for flood prevention and typhoon prevention before the flood. The sub-district flood control office has comprehensively deployed a series of flood prevention and typhoon prevention measures, and put forward rectification requirements and emergency plans for weak links in flood prevention and typhoon prevention. Relevant departments of the sub-district and flood control organizations at all levels have completed the flood control responsibility system at all levels and signed a "flood control responsibility letter" in accordance with the principle of "responsible for flood control work and detailed division of labor" to ensure that the ideas, publicity and responsibilities are in place. Personnel are in place and defensive measures are in place.

? 2. Be fully prepared to ensure that flood prevention work is foolproof

? Before the flood, professional maintenance of 3 drainage pumping stations, 2 railway overpass pumping stations, and 5 pedestrian tunnels was determined Units should implement the responsibility system and strengthen 24-hour duty, disaster reporting and emergency response plans. Carry out maintenance and repair on flood control equipment such as 10 3-inch water pumps, 1 4-inch pump, and 2 6-inch high-power water pumps on the street to ensure that the equipment can be put into normal use during emergency rescue. Our flood prevention materials have been improving year by year. We now have 16 water pumps, 60 rolls of supporting water hoses, and 28 sets of raincoats and boots.

? 3. Go all out to implement various flood control measures

? In the flood prevention work this year, we combined the safety production requirements of the superior departments and took the lead in the street safety office and urban management law enforcement The Xinhong Squadron, the district drainage management and maintenance unit and other departments jointly conducted a major flood control and drainage safety inspection at various construction sites in the Hongqiao Business District. It has put forward its own strict requirements for the safety production work of various construction sites in the business district. Regarding the weak links and safety hazards in flood control and drainage discovered during the inspection, Xinhong Water Station required the construction unit to make rectifications within a time limit and issued a written rectification notice on the spot. It is possible to ensure that no blind spots are left in the investigation of hidden dangers, and flood prevention safety must be practical and effective. At the same time, surprise operations have been transformed into long-term management, and relevant departments have been jointly carried out regular flood prevention safety inspections on underpasses, underground spaces, construction sites, residential areas, high-altitude billboards, etc. under their jurisdiction, and various flood prevention works have been steadily promoted. implementation. The sub-district water station will inspect the flood control and drainage work at the construction site once a week. In case of special circumstances, inspections will be strengthened and problems will be corrected as soon as they are discovered.

In order to effectively ensure the safety of road drainage and timely river flood discharge in important areas of Xinhong Street Community and Hongqiao Hub, Xinhong Water Station took the lead in carrying out centralized water affairs publicity and training in accordance with local conditions. The district water affairs department and relevant units in Xinhong Street carried out centralized water affairs publicity and training During the discussion, *** signed a proposal for regional joint prevention at the construction site. The activity focused on strengthening the publicity of legal drainage and mud transportation and disposal of large-scale construction sites in the Hongqiao transportation hub. In order to prevent illegal drainage, mud dumping, and damage to drainage facilities, the district water affairs department and relevant departments of Xinhong Subdistrict We will make full use of existing platform resources such as street joint logistics, urban management law enforcement, sanitation workers, and greening maintenance to jointly carry out inspections of construction sites and earthwork (mud) supervision.

In order to further improve the self-rescue, rescue and disaster relief capabilities of street flood control personnel, in the small enclosed strong drainage areas that have been implemented in Maosheng Garden and Shuxing Community, Xinhong Water Station actively organized before the flood season The Sixth Neighborhood Committee of Hanghua No. 1 Village, Chunhui Property Company, Jikang Property Company and other relevant personnel conducted emergency drills for flood prevention and typhoon prevention. Through the drill, the ability of the two communities to withstand disasters such as typhoons and heavy rains was greatly improved. It was clarified that when water accumulates in the community during the flood season, emergency avoidance and self-rescue must first be carried out. The relevant property management company is responsible for the specific implementation, and the neighborhood committee is responsible for supervising its implementation. In addition, in August, our station also participated in the "XX District 2013 Flood Control Emergency Drill" organized by the District Water Conservancy Bureau and participated by multiple flood control-related units. During the drill, our station's rescue team members pulled out and responded to the sound. With fast speed and strong processing capabilities, it achieved good practical drill results and made active efforts to ensure flood control safety in Xinhong area.

During the implementation of the 20XX flood control water accumulation point renovation project in Xinhong Street and the overhaul of the railway overpass pumping station, we established a regular construction meeting system to cooperate with the district flood control headquarters office and district water project quality supervision The station and other relevant departments have done a good job in the 2013 quality management year activities of the district water construction project and the collection of information on the integrity evaluation management of the district water bureau.

? 4. Overcome difficulties and resist the invasion of typhoons such as Suli and Feite

When typhoons such as Suli and Feite come this year, Under the leadership of the street party working committee and office, and with the active participation and efforts of the village (neighborhood) committees and relevant flood control organizations, the main leaders and leaders in charge of the street personally led the team and went to the scene in person for many times with the heads of various functional departments. The front line mobilized inspections, supervised preparations, and implemented various defensive measures to ensure the orderly development of street flood prevention work. Especially during the impact of Typhoon Feite this year, after receiving the typhoon warning notice from the district flood control headquarters, the sub-district director Zhu and relevant leaders immediately inspected the noise control site at the Huamei Community Airport and held a defense meeting on the construction site of the Huamei Community. The on-site working meeting of Typhoon Fitt required the member units of the Xinhong Street Flood and Typhoon Prevention Leading Group to strictly implement various defense work.

On the morning of October 8, due to the continuous influence of the outer climate of the strong typhoon Fit, the cumulative rainfall in Xinhong Street reached 236 mm within 24 hours, and water accumulation occurred in many areas. Director Zhu Jianshe, Deputy Director Yang Shengguo, Deputy Director Wang Shirong and other leaders braved the rain to visit Hongxing Village, Xinjialong Village and Huamei Community where water accumulation was serious, and immediately convened an emergency meeting for flood prevention and typhoon prevention in the whole street. Faced with the severe situation, Rescue missions were deployed in a targeted manner. As soon as the meeting ended, Director Zhu Jianshe led the team and heads of various functional departments to the scene non-stop to mobilize and direct various defensive measures. During the rescue work of water accumulation in Maosheng Community on Qixin Road, Deputy Director Yang Shengguo sat at the scene and personally directed , emergency mobilization of sandbags and other measures to block areas prone to water intrusion in the community. Effective measures were taken to quickly block water ingress with sandbags and other equipment to prevent rainwater from flowing into residents' homes. Submersible pumps and multiple gasoline pumps were used to implement strong drainage, which effectively controlled the water in the community. of water.

? In addition, in the process of resisting the typhoon, various functional departments actively responded and carried out the following work:

? 1) The water station forwarded early warnings at all levels through the SMS platform of the district government network information, organize and mobilize relevant departments and village (neighborhood) committees to identify various safety hazards; carry out self-managed drainage facilities, regional drainage facilities, underpass (tunnel) drainage facilities, and flood prevention inspections in areas prone to water accumulation, and actively prepare for flood prevention Supplies were on duty day and night for three days and two nights, and were dispatched many times to eliminate water accumulation in sections such as Qixin Road, Huaxiang Road, and Huqingping Highway, as well as residential communities such as Maosheng Community and Huajing Community, and completed street flood prevention work. The vanguard.

? 2) The inspection team carried out flood prevention inspections of dilapidated houses, high-altitude structures, high-altitude billboards, etc., and provided vehicles to water service stations for use as flood prevention vehicles before typhoons, heavy rains and other severe weather strikes, improving the Improved flood control maneuverability.

? 3) The street urban management office actively carried out flood prevention inspections of landscape facilities, greening trees, etc.

? 4) The Municipal (Health) Planning and Construction Section and the Safety Office have carried out safety inspections on construction sites under construction many times during the flood season, which has greatly reduced the risk of flood prevention at construction sites under construction.

? 5) The Safety Office and the Social Management Section worked together with the water station to implement flood prevention emergency relocation sites for more than 20 construction sites in the hub business district.

? 6) The street housing management office and the community life service center report all kinds of flood prevention information in a timely manner, actively participate in flood prevention inspections of underground spaces such as the Aibo underground garage, and implement various flood prevention measures to ensure that the community can survive floods safely.

? 7) The sanitation office worked tirelessly to intensify road cleaning. Sanitation workers braved the rain to remove garbage from rainwater wells on the roadside, reducing the formation of water on the road.

? 8) The Xinhong Police Station made careful arrangements and immediately notified the water station to eliminate the disaster when water accumulation was found, eliminating blind spots in flood control.

? 9) The Ministry of Armed Forces is constantly prepared and established an emergency team for rescue and disaster relief during the flood season.

? All departments worked together to ensure the smooth and normal operation of the street area, the safety of people's lives and property, and successfully completed the flood prevention and typhoon prevention work.

? 5. Pay close attention to implementation and increase investment in flood prevention and typhoon prevention funds

? During this year’s flood season, street leaders went to the grassroots many times to listen to residents’ demands and opinions, and targeted No expense was spared in the renovation and construction of areas with weak flood control. When the financial resources of the street were originally tight, funds were increased outside the fiscal budget many times. Xinhong Subdistrict added nearly 6 million yuan to the budget for the 2013 water accumulation point renovation project, and implemented the renovation of water accumulation points along Wu Zhai Road in Xinjialong Village, Guanghua Village Railway Overpass and Huaxiang Road; implemented the renovation of Hongxing Village, Airport The overhaul project of the overpass under the highway and railway, the construction cost is about 460,000 yuan; combined with the district housing comprehensive renovation project, the rainwater and sewage diversion renovation project in Tianyi and Hujiang communities has been added, and the construction cost is about 4.87 million yuan; at the same time, various projects were carried out before the flood The actual investment in flood prevention and typhoon prevention preparations included more than 100,000 yuan in flood prevention material reserves and investment in rescue work.

? 3. Problems discovered during the 20XX flood season

? The main problems during this year’s flood season are:

? 1. The reserves of flood control materials are still insufficient, including rain gear, flashlights, etc. There are still shortcomings, and there is no special flood prevention warehouse for material storage.

? 2. Due to the public bidding in the early stage, the construction of the water accumulation point reconstruction project started late this year. The construction was basically carried out in the middle of the flood season, and the ideal effect was not achieved during this year's flood season.

? 3. Some areas of Xinhong Street are low-lying. Once the rainfall exceeds the standard, it is easy for rainwater to flow back into the community.

? 4. Key points of work before next year’s flood season

? 1. Carry out maintenance of flood control equipment and statistics of flood prevention and typhoon prevention materials

? In order to carry out the work smoothly during the flood season in the coming year , Carry out maintenance and upkeep of flood control facilities and equipment, and inventory flood and typhoon prevention materials to ensure that equipment and materials can be put into normal use next year.

? 2. Clarify responsibilities and continue to strengthen construction supervision of projects under construction.

Since Xinhong Street is located in the core area of ??Hongqiao transportation hub, a large number of construction sites are under construction. Engineering construction will have a huge impact on flood control safety. We need to further clarify responsibilities with each construction site under construction, strengthen inspections of their flood prevention and typhoon prevention work, and at the same time, cooperate with the district drainage office to divide drainage pipeline supervision responsibility areas and establish a review system for the transportation and disposal of construction mud. Once it is discovered that mud is secretly being discharged at a construction site and drainage pipes are blocked, it should be reported immediately to the relevant units for quick elimination of potential safety hazards.

? 3. Focus on promoting the transformation of weak points in street flood control.

? With the great attention of relevant departments at the municipal and district levels and the strong support of leaders at all levels of the street, next year Xinhong Street will take "serving people's livelihood" as the starting point and cooperate with the Huamei Community Airport noise control work. Focus on the implementation of the intensification of water supply in Huamei Community, the renovation of old Huacao municipal rainwater and sewage pipelines, and the comprehensive improvement project of Wenshan Bay River in Yangshu Bay. At the same time, drawing on the experience of projects in previous years, we must start early and implement early in 20xx, and gradually eliminate weak points and blind spots in flood control in the Xinhong area.

? In summary, the above is the general work content of this year’s flood season and the work plan for the next year after the flood. With the complexity and variability of global climate change, flood prevention work has a long way to go. We must establish a rapid , flexible and effective management mechanism, maintain a down-to-earth and serious work attitude, do better flood prevention work, create a good living environment for community residents, and work hard to ensure the safety of residents' lives and property.