Traditional Culture Encyclopedia - Weather inquiry - Advanced personal story materials in engineering

Advanced personal story materials in engineering

Model essay on advanced personal deeds of engineering

In our study, work and life, everyone has written deeds. Deeds are a kind of official documents, which have the functions of promoting righteousness, commending the advanced and promoting the work. You don't even have a clue when drafting story materials? The following is a model essay on advanced personal deeds in engineering that I compiled for your reference only, hoping to help you.

Personal story of advanced engineering materials 1 This comrade is mainly engaged in engineering cost consultation in the School of Engineering Economics. Since I was admitted to the hospital in 20xx, I have been based on my post, working hard, assiduously studying technology, bravely shouldering heavy burdens, caring for the owners, and doing every job in a down-to-earth manner. In the process of work, we should be serious and responsible, modest and prudent, study hard and be good at summing up, and formulate different coping methods according to the respective characteristics of the project to improve work performance. While doing his job well, he also pays attention to improving his business skills and comprehensive quality through continuous learning, which has been affirmed and praised.

A, serious and responsible, to ensure the quality of work.

Although the cost consultation work is ordinary and boring, the comrade can take it seriously with great enthusiasm. He is conscientious and responsible in the specific work, always keeping in mind the company's quality management policy, trying to collect information, and filling in the record sheet as required, and also indicating the design input conditions such as material price, transportation distance and charging parameters in the record sheet, which not only facilitates the subsequent proofreading work, but also facilitates the possible design changes in the later stage or the cost adjustment of the next stage, which increases the traceability.

At the same time, this comrade's work is not carried out blindly. He first sorted out the background, owner's requirements, design premise and possible problems of the whole project, and combined with the experience of similar projects, found out the key points and difficulties. Secondly, according to the analysis of the data submitted by the design, if there are any questions or deficiencies in the data submitted by the design, communicate with the designer in a timely and active manner; Then, in strict accordance with the requirements of the compilation specification, the cost is compiled in an orderly manner, and submitted to the relevant auditors, directors and chief engineers for proofreading according to the company's quality management requirements, and adjusted in time according to the proofreading opinions; Finally, before the results are submitted to the owner, feedback and communication should be conducted with the designers to ensure the quality of the project cost results. Quality is fundamental, especially for engineering design units, quality is the basis and important guarantee for enterprises to occupy the market on the road of development.

Second, pay attention to learning and improve business skills.

In work practice, the comrade knows the importance of improving business skills to do a good job. He began to improve his business skills by expanding his knowledge and summing up his experience.

On the premise of not affecting the work, through the combination of professional knowledge training and self-study, while learning the basic theory of project cost management and related laws and regulations, project cost pricing and control, we pay attention to the study of port engineering construction technology, construction organization, project management, highways, bridges, civil engineering and other professional knowledge, and strive to continuously broaden professional and technical knowledge to cope with more diverse and complex engineering projects.

When new materials and new processes are adopted in engineering design, he will humbly ask designers and experienced veteran comrades for advice, learn until he masters them, and constantly improve his knowledge through work practice.

In the course of work, the comrade also paid attention to summing up the cost consultation results of completed projects, and compared them with similar projects, and gradually accumulated some work experience.

Third, we are willing to contribute to better service to our customers.

Engineering cost consultation is a job that requires high professional skills of employees, mainly including investment estimation of engineering feasibility study, preliminary design budget, construction drawing budget, design bidding project scheme quotation, general contracting quotation, etc. In order to meet different requirements, he can always actively communicate with designers, fully understand the investment intention, source of funds, construction scale, design progress and design concept of the construction unit, and compare different design schemes economically through the combination of technology and economy, so that designers can fully consider the economic rationality when finally choosing the design scheme, and through repeated feedback and comparison, determine the best design scheme that is technically feasible and economically reasonable and submit it to the owner, which fully embodies the company management policy of taking care of customers. Always answer the owner's inquiries in a friendly, serious and responsible manner, and reply to the owner's inquiries in the form of words or forms when necessary, which has been affirmed by many owners.

In the implementation of specific projects, he often encounters short project cycle and tight schedule. He always overcomes all kinds of difficulties, gives up his rest time, works overtime actively and submits satisfactory results at the first time. When he is on a business trip, he always obeys the arrangement without saying a word, and does not forget the project at hand during the business trip. If there is a time conflict between the business trip and the project at hand, he also takes the information to the place where he is on a business trip, works overtime to complete the project at night, and then sends it to the unit for proofreading, so that the project can be completed in time with good quality and quantity without affecting the progress of the whole project.

Fourth, bravely shoulder heavy burdens and strive for better performance.

In the process of work, this comrade can always put himself in a correct position, regard every job as an opportunity and dare to challenge difficulties. It is this sacred sense of mission and high sense of responsibility that makes this comrade always maintain a high degree of work enthusiasm in the face of tirelessly changing and optimizing the design scheme, make full use of his own business skills, clearly analyze the composition of costs and market changes, actively coordinate feedback from various parties, provide strong technical support for the final selection of the optimal scheme, and make due contributions to the progress and implementation of the whole project in the direction of high quality and low price.

Advanced personal story materials of engineering 2 He was born in 1980. To put it in a fashionable way, he is born after 80. Speaking of the "post-80s" generation, people will think of the lack of sense of responsibility and collective consciousness. However, he used this rare maturity and steadiness of the post-80s generation to write and interpret a beautiful poem about the loyalty and responsibility of the Party. He is the chief engineer of the management department of five companies. People who don't know him may doubt his ability and level when they first see him as the chief project engineer under the age of 26, but only those who know him will be impressed by his professionalism and dedication. From a little boy who just walked out of campus to a handsome engineer who is working hard now, the construction site is his home and the enterprise is his stage. He danced a sunshine dance on this stage.

Standardization of daily management

During his tenure as the chief engineer of xxx management department, he always took the standardization of construction technology management as the basis of daily management, organized engineering and technical personnel to study in strict accordance with the requirements of the Bureau's construction technology management measures, and combined with the characteristics and differences of this project, made it concrete and innovative in the learning process. The standardization and proceduralization of construction technology management are fully realized, and the engineering quality management network is orderly and controllable. In the quality credit evaluation organized by the Ministry of Railways for many times, internal data and external evaluation are among the best in each bid section, and in the construction technology management inspection evaluation organized by the company, it has also achieved good results for many times. Strict management has laid a solid foundation for the project to achieve better economic benefits.

In terms of personnel training, he organized interns, interns and mature engineers and technicians to carry out apprenticeships, which formed a good atmosphere for technicians to learn while working, and paid attention to cultivating the technical level and independent working ability of young engineers and technicians. Every time he went to the construction site, he took the engineering technicians who had just joined the work to the construction site, opened drawings and technical disclosure, and made technical preparations before construction, technical requirements of key working procedures in the construction process and thinking about the construction process after completion through questions and answers, so that they could learn to think, do and summarize. And regular training, regular assessment, the rapid growth of young technical personnel, enriched to the key positions of project management.

Create maximum benefits

Through a comprehensive study of the terms of the contract, he listed all the conditions that meet the requirements of design change and claim compensation, combined with the quotation of bill of quantities, made a change claim scheme for stop-loss and efficiency-enhancing projects, and then organized drawing review and on-site verification. For projects that do not meet the design requirements and are not conducive to construction, he made a change declaration and supplemented the number of missing drawings according to the corresponding change conditions. Up to now, more than 2.4 million yuan has been paid for the inspection of change claims, and more than 3 million yuan of change claims are still being processed and tracked; The new project and construction drawing have been completed, and the project inspection is valued at 6.79 million yuan; The first-level modification design of the road-to-bridge has increased the investment by190,000 yuan, and the budget estimate is being split with the owner. By effectively carrying out the above work, he realized the "return to the warehouse" of the income within the contract and the "steady increase" of the income outside the contract. On the one hand, it pays attention to the project income, on the other hand, it offers suggestions and suggestions for project cost saving.

There are three bridges in this project, and the consumption of FRP cable trough is about 4500m, so the purchase volume is large. When choosing the supplier of FRP cable trough on the bridge, many manufacturers have come, and most of them are "related households" in all aspects. It is said that "kickback" is also used as bait, the product quality is also uneven, and the unit price of purchase is higher. He euphemistically rejected the supplier's "kindness" on the grounds that he had signed a purchase contract with other manufacturers, and immediately launched a market survey of FRP cable trough. Through various understanding, a factory in Wuhan has been engaged in the production and installation of railway FRP cable trough for a long time, and the price is low.

In order to save cost and control quality, he went to Wuhan alone regardless of fatigue. After many twists and turns, he finally found the manufacturer and got the samples under construction in the workshop and the test report of the quality inspection center of the Ministry of Railways. The management department signed the purchase contract with confidence, and the actual purchase unit price saved nearly 100 yuan per meter compared with the unit price of "related households", which alone saved about 450,000 yuan for the project. In addition, there are processed steel fittings in the gutter of the bus maintenance workshop. The unit price of entrusted processing in the previous investigation is 85 yuan/block. He communicated with the design institute to understand the mechanical characteristics of the parts and changed the milling process to welding process, which greatly saved the waste of materials. And through the continuous investigation of mechanical processing manufacturers, the finishing cost has dropped again and again. In the face of fierce competition, he finally forced the processing factory to win the processing contract at a low price of 44 yuan/block, saving the enterprise more than 200,000 yuan.

Selflessness of loyal enterprises

Xxx plans to undertake the difficult, dangerous and urgent engineering projects of most pipeline sections, from completing the construction period of one million earthwork nodes of the whole passenger station to the opening of two frame bridges across Hanyi Expressway, from the construction period of paving nodes of Yayi rerouting bridge to the opening of Yayi rerouting dial-up, and keeping paving and paving lines unblocked for 40 days in freezing weather, leaving his footprints and sweat everywhere. During the construction of Yayi Bridge, no matter day or night, as long as there is a need on the construction site, he will appear in the most needed place for the first time.

In particular, in the final stage of line connection and opening, it has been raining heavily since the construction preparation in front of the blockade point at night, and the temperature is as low as 10℃ at night. A thin figure, wearing a wide raincoat, is still shuttling between the dialing crowd and the machinery when it is raining cats and dogs, sometimes nailing himself there as a subgrade side pile, commanding the machinery to fill the subgrade, and sometimes raising his hand to command the machinery. He sometimes directs the mechanical auxiliary dialing personnel to dial the road in place, and sometimes directs the technical personnel to measure the line in place. That night, he didn't drink a mouthful of hot water, nor did he bake a warm fire in the rain for 8 hours. He never sat on a bench in the rest shed and ran back and forth countless times in the 200-meter enclosure. It was not until the next morning that the line was successfully opened on time and the first train passed slowly that he showed a tired smile. He didn't know that the rain in the rain boots had dripped through, and he realized that there was no dry and warm place all over his body. His hands were almost numb by the rain. He picked up the rice soaked in boiling water several times and never felt that the rice soaked in boiling water was so fragrant.

He tried his best to treat the enterprise; For himself, he is a little careless, young, and a few strands of white hair have been quietly afraid of sideburns. One day in March of 20XX has made Master Wang unforgettable. Xxx was going to the design institute at that time. Just after the bus left Yichang city, he vaguely felt the pain in his right abdomen, which was getting worse and worse. At that time, Master Wang saw that he was in pain and was ready to turn around and go back to the Municipal People's Hospital, and then come to work the next day. But he said firmly, "I have already made an appointment with the design institute, and I can't break my word." In this way, he gritted his teeth and bent down all the way to the design institute. After finishing, the engineer of the design institute helped him go downstairs. It was already 2 pm when I got back to the hospital. After examination, it was found to be acute perforated appendicitis. Half an hour later, the doctor performed an emergency operation. At this time, his daughter is not yet full moon. Seven days after the operation, he devoted himself to the busy construction and production. It is such a soft-blooded "post-80 s" that closely links the fate of enterprises with their own times. When the storm came, he was willing to shelter the enterprise from the wind and rain, but never thought of finding a harbor for his thin body to hide the department he led. He has been rated as an advanced department by the bureau and the company for many times, and he himself has been rated as an advanced production worker, chief engineer of excellent projects of the company and advanced production worker of the company every time.

;