What are the anti-skid and anti-freezing safety measures for construction electricity in rainy and snowy weather?

What are the anti-skid and anti-freezing safety measures for construction electricity in rainy and snowy weather? The following is a detailed introduction of Zhong Da Consulting for your reference.

A, enter the construction site construction personnel shall not wear leather shoes, must wear non-slip rubber shoes, wear safety helmet and non-slip gloves, in the construction work surface must remove mud.

Second, before the construction work, check whether the steel pipe scaffold is firmly connected with the bamboo springboard or wooden formwork and whether there is a probe board. If there is ice, frost, snow and rain on the working face, it must be removed.

Three, it is forbidden to use (erection of scaffolding as operating surface, steel pipe scaffold fasteners must be tightened, tightened and added bracing. Fasteners and steel pipes are prohibited from being used if they are damaged, slippery and seriously corroded.

Four, scaffolding work outside, it is forbidden to directly step on the steel pipe. During operation, bamboo springboard or wooden formwork should be laid and fixed firmly. There must be four cross bars under a bamboo springboard, both ends of which are fixed with iron wires.

Five, it is strictly prohibited to dismantle the steel pipe scaffold support and size bar and bamboo springboard before the upper work is completed.

Six, such as special parts do not have the erection of scaffolding, homework personnel must wear a seat belt, and have someone to care for.

Seven, before the flat die is not supported, the steel bar is not reinforced and safety protection measures are not taken, the operator is strictly forbidden to walk on the floor.

Eight, tower crane lifting construction materials, must be carried out under the command of personnel, it is forbidden to illegal lifting, centralized stacking.

Nine, before the construction work, must check whether the electricity consumption of construction machines and tools is normal. Whether there is disconnection, poor connection, leakage and other phenomena. , timely report to the project department. It is strictly forbidden to connect wires illegally without permission. Before coming off work, each team must turn off the power supply of machines and tools and the power supply of distribution box.

Ten, each team mechanical operators, it is forbidden to operate construction machinery in the case of wet hands or clothes.

In cold and humid weather, teams should pay attention to heat preservation and sleep time, and fatigue operation is not allowed. The above matters are expected to be implemented by each team one by one to strengthen team management.