Traditional Culture Encyclopedia - Weather inquiry - Emergency plan for typhoon and rainstorm prevention in hospital

Emergency plan for typhoon and rainstorm prevention in hospital

Model essay on emergency plan for typhoon and rainstorm prevention in hospital (generally 5 articles)

In the real study, work and life, we will encounter some unexpected events or accidents. In order to minimize the harm, it is necessary to prepare specific, detailed and targeted emergency plans in advance. So what kind of emergency plan is good? The following is a model essay (generally 5 articles) of Emergency Plan for Typhoon and Rainstorm Prevention in Hospitals, which I carefully compiled. Welcome to share.

Emergency plan for typhoon and rainstorm prevention in hospital 1 In order to effectively prevent geological disasters of unstable slopes of dangerous rock mass and unstable slopes of mid-levels in xx town, minimize accidents and avoid personal safety and property losses of people, the following emergency rescue plan is formulated in combination with the actual situation of our town.

I. Main points of disaster situation

(A) xx unstable slope of dangerous rock mass

The unstable slope of xx dangerous rock mass is located behind Longshan Temple in Liyang Town. There are several prominent dangerous rocks on the top of the mountain, which affect the safety of people and property in Longshan Temple. In case of heavy rainfall for a long time, landslides may occur. In case of heavy rainfall for a long time, notify the personnel in Longshan Temple to evacuate in time.

(2) The unstable slope of Banbianshan dangerous rock mass

The unstable slope of Banbianshan dangerous rock mass is located in the south of Xiaolongshan Mountain in Liyang Town. Banbianshan Mountain is almost vertical, and there are many raised rocks on the surface, which are easy to fall. There are special police schools and houses near the dangerous rock in Huangshan City. Long-term heavy rainfall may lead to landslides. In case of long-term heavy rainfall, notify nearby personnel to evacuate.

Second, the emergency work leading group

Team leader:

Deputy team leader:

Members:

Three. Emergency response and action

(1) Emergency personnel

Tester: xx

Settlement point: xx

Contact: xxx

Transferee: Releasing.

(II) Emergency Team: xxx

(3) Emergency material reserve

The materials for flood control and disaster relief in the town mainly include: raincoats/KOOC-0/2 sets, helmets/KOOC-0/2 sets, four folding charging recording and talking microphones, shovels/KOOC-0/0, sacks/KOOC-0/00 and some sand. The above flood control materials are stored in the instrument room of the town and uniformly deployed by Comrade Lin Tianyou.

(4) Emergency response:

1, the town's leading group for flood control and disaster relief held a meeting to report the disaster situation and disaster relief work in the jurisdiction, analyze and predict the possible greater disasters, and deploy disaster relief work in the jurisdiction. Immediately report the disaster situation and disaster relief work in the jurisdiction to the District People's Government and the District Flood Control and Drought Relief Headquarters, and request the support of the district government.

2. Organize the whole town personnel to inform the residents of flood information in time by telephone, SMS, microphone and other means according to the urgency of the flood season; In case of emergency or interruption of power supply and communication, residents in disaster-prone areas should be informed separately, especially when related disasters may occur at night, and the reliability of information transmission should be ensured, so as not to miss one household or one person.

3, emergency personnel according to their respective responsibilities and tasks, after receiving the disaster weather forecast, should be on standby at any time, not to go out, after receiving the assembly command, should be in 15 minutes to the designated place, according to the command to organize rescue.

4. Publish the disaster situation. The town headquarters office summarizes the disaster situation and reports it to the district flood control and drought relief headquarters.

Fourth, post-disaster relief work.

1. Hold a meeting on self-help in production and life in time, and quickly organize the recovery of production and life.

2, seriously organize the nuclear disaster investigation, focusing on the verification of the collapse of houses caused by the disaster, especially the loss of particularly heavy victims such as all households.

3. According to the disaster situation after the nuclear disaster, formulate a rescue plan for the victims and implement it step by step.

Five, the basic requirements of flood control emergency work and work discipline

1. The Office of the Leading Group for Flood Control and Disaster Relief implements a 24-hour duty system during flood control. Strict work discipline, carefully record the situation on duty and report in time. During the flood control period, if a member of the headquarters needs to leave the local area on business, it must be approved by the main person in charge of the unit and arrange the flood control work within the scope of his duties.

2. The responsible person is fully responsible for flood control and disaster relief, and must ensure that the telephone is open 24 hours a day, arrange the duty in this area, supervise and urge the duty record and duty handover, and report the danger within 30 minutes, and shall not delay the rescue work.

3. Where in the flood season on duty and flood control and disaster relief work, dereliction of duty, irresponsibility, late reporting or personnel are not in place in time, the responsibility of the relevant personnel should be seriously investigated; If serious consequences are caused, the main responsible person shall be investigated for responsibility according to law.

Emergency plan for typhoon and rainstorm prevention in hospitals II. Guiding ideology:

Preventing typhoon and rainstorm is an important work related to the life safety of teachers and students and the safety of national property. In order to effectively protect the safety of teachers, students and property, and improve the ability of kindergarten to deal with flood prevention and typhoon prevention, this plan is formulated in line with the principle of "prevention first, safety first".

Second, the prevention steps:

1, list of leading groups and contact telephone number

Team leader:

Team members:

The kindergarten started the typhoon prevention and flood control plan, and implemented the 24-hour leadership and 24-hour duty system.

Third, emergency measures:

1, strengthen information communication, so that the upper situation is issued and the lower situation is reported.

When there is a big flood, all the leaders are in place, and the leading group for flood control and typhoon prevention begins to operate; The competent leader shall report the disaster to the leading group for flood prevention and typhoon prevention; Fully deploy typhoon prevention and flood control work.

2, prevention first:

Clear the corridor. Before the typhoon lands, it is necessary to clean up the sundries and flowerpots on the balcony and corridor to prevent people from being blown away by the wind when the typhoon lands.

Close the doors and windows. When typhoon and rainstorm come, the wind is strong and the rainfall is heavy. Close the doors and windows to prevent the wind and rain from damaging the doors, windows and furniture and causing casualties.

The doorman fully dredged the sewers and main collecting wells of the whole school.

Dredge drains and downpipes on school buildings, and trim and strengthen school trees.

Conduct a comprehensive safety inspection of the lightning protection facilities and outdoor wires of the whole teaching building.

Conduct a comprehensive safety inspection of outdoor antenna, outdoor unit of air conditioner and plug-in.

Conduct a comprehensive inspection of indoor power supply, sockets, doors and windows of all departments.

If the circuit and wires are interrupted due to typhoon, turn off the power switch and turn on the emergency light, flashlight or candle.

Fourth, safeguard measures:

After the plan is started, kindergartens should make early warning and record information. Hold an emergency meeting, in the shortest possible time, deploy the kindergarten flood control and typhoon prevention work by telephone, inform the typhoon flood dynamics, and arrange the requirements and tasks of flood control and typhoon prevention, emergency rescue and disaster relief.

Keep close contact with superior departments and units at any time, strengthen information communication, and ensure information release and reporting.

Emergency plan for typhoon and rainstorm prevention in hospital 3 In order to do a good job in typhoon and storm surge prevention in our town, minimize the losses caused by disasters and ensure the safety of people's lives and property, this plan is formulated according to the spirit of emergency response law and the actual situation of our town.

I. Guiding ideology

According to the instructions of the municipal and district governments, combined with the reality of our town, firmly establish the idea of preventing floods, typhoons and storm surges, be prepared for danger in times of peace, so as to ensure the safety of people's lives and property.

Two, strengthen leadership, the establishment of typhoon and storm surge prevention work leading group.

Set up a leading group for flood control, typhoon prevention and storm surge prevention with the mayor as the team leader and the leaders in charge as the deputy team leader, and set up an emergency team, with the team leader as the director of the Office of the Deputy Secretary of the Party Committee; The emergency commandos for flood control, typhoon prevention and storm surge are responsible for the layout, inspection, supervision and information release of flood control, typhoon prevention and storm surge prevention in our town, timely convey the spirit of instructions for typhoon prevention and storm surge prevention at the municipal and district levels, and summarize and report the situation of typhoon prevention and storm surge prevention in our town.

Third, the division of responsibilities

(1) Each district

1. Person in charge: district secretaries.

Step 2 work

(1) inform the villages quickly and make records;

(2) Dangerous households are forced to move out;

(3) During the typhoon, vehicles stopped to reduce the number of people going out;

(4) Organize village cadres to clear the weeds in the canal, quickly drain the accumulated water in the field, and never allow the accumulated water in ditches and depressions;

(5) The residential area should be prepared for moistureproof;

(6) Animal husbandry villages should be prepared for wind and rain;

(7) After the rainstorm, quickly count the disaster situation and do a good job in rescue and appeasement.

(2) Safety

1. Person in charge: Salt Industry Office, Fisheries Bureau.

Step 2 work

(1) Inform the feeding and nursing personnel in the area to evacuate in writing in time;

(2) notify enterprises such as sea cucumber breeding in writing to stop construction and evacuate mechanical personnel;

(3) Notify all salt and salt chemical enterprises to prepare for wind and moisture;

(4) The ship docked and all operators landed.

(3) Enterprises within the jurisdiction

1, responsible person:

Step 2 work

Notify to take preventive measures.

(4) Construction site

1, responsible person:

Step 2 work

(1) Pay close attention to Jinghu Garden, middle school teaching building, kindergarten, community, market building and poor housing site;

(2) Give a written notice, and pay attention to live working, hanging objects at high altitude and personal safety.

(5) Road repair

1, responsible person:

Step 2 work

(1) Repair badly damaged road sections;

(2) rapid repair after the disaster;

(3) Check billboards, poles and lines along the way.

(6) Housing and nursing homes

1, responsible person:

Step 2 work

(1) Check the housing and nursing homes;

(2) communicate with the flood control headquarters on disaster statistics and retribution.

(7) Flood control in villages and towns.

1, responsible person:

Step 2 work

(1) Drainage dredging;

(2) High-altitude hanging objects such as billboards.

(8) Flood control facilities

1, responsible person:

Step 2 work

(1) Dredge all main drainage channels, lift gates, dig dams and clear grass;

(2) check the reservoir dam;

(3) Reservoir and main canal shall be responsible for division of labor, and a division of responsibilities table shall be formulated.

(9) "Three networks"

1. Person in charge: "Three Networks" Office, Forestry Station

2. Task: Post-disaster recovery.

(10) Emergency Rescue Team

1, responsible person:

2. Task: Organize two rescue teams, divide them into several groups, and each 1 2 team members will lead the team to ensure that the personnel are in place.

(11) Information flow.

1, responsible person:

Step 2 work

(1) Information communication of flood control headquarters;

(2) disaster statistics;

(3) personnel and vehicle scheduling;

(4) Upload and publish.

(12) supervision

Responsible person: supervision office, informing the armed police, police station and health center to prepare for disaster prevention.

The fourth is to comprehensively prepare and implement various measures.

All village committees and units stationed in our town should arrange typhoon and storm surge prevention work according to their own actual conditions, especially according to the priority of typhoon and storm surge prevention hidden dangers, and formulate corresponding preventive measures.

(1) Do a good job in the investigation of typhoon and storm surge prevention in our town. At present, many drainage ditches and pipelines in our town are occupied, covered and blocked, and some houses are still in danger of leaking rain, which is an important hidden danger to prevent typhoons and storm surges. All village committees and units stationed in our town should do a good job of investigation, especially in villages, and report the existing problems to the leading group for typhoon and storm surge prevention immediately.

(two) do a good job in typhoon and storm surge prevention work plan and typhoon and storm surge prevention work in key areas. According to the opinions of the city and district on typhoon storm surge prevention and the actual situation of our town, the leading group for typhoon storm surge prevention in town has formulated the implementation plan for typhoon storm surge prevention in town and the first-level plan for typhoon storm surge prevention in key areas.

(3) Strengthen the duty and duty system. The personnel on duty to prevent typhoon and storm surge in this town will be on duty 24 hours from 1 month to properly handle all kinds of emergencies in time. Establish a reporting system for flood control, typhoon prevention and storm surge prevention, and all village committees shall report to the town typhoon prevention and storm surge prevention in time; The town's typhoon and storm surge commandos are fully prepared for emergency rescue and disaster relief, and they will be dispatched as soon as there is danger.

(4) Prepare flood control materials. Buy shovels, pickaxes, straw bags, iron wires and sand materials as reserves for flood control, typhoon prevention and storm surge prevention.

Verb (abbreviation for verb) job requirements

(1) Be prepared for danger in times of peace and enhance the sense of hardship. All units should not take it lightly, and must resolutely prevent problems before they happen. Seriously study the instructions of superiors on typhoon and storm surge prevention, improve the understanding of the importance of typhoon and storm surge prevention, overcome paralysis and luck, firmly establish the awareness of typhoon and storm surge prevention, and include typhoon and storm surge prevention in one of the important tasks at present.

(2) Strengthen leadership and implement the responsibility system for typhoon and storm surge prevention. According to the requirements of the municipal and district typhoon and storm surge prevention headquarters, the first-in-command responsibility system shall be implemented, and the responsibility for typhoon and storm surge prevention shall be implemented. Each village committee should set up a leading group for typhoon and storm surge prevention, headed by the village committee director, to make good ideological and material preparations for the masses and ensure the safety of typhoon and storm surge prevention in our town. Staff should keep communication open for 24 hours. During the typhoon, the personnel and vehicles on duty are on duty 24 hours a day, and other personnel are on standby.

Sixth, the accountability system.

Such as loss or adverse effects caused by ideological paralysis, ineffective work, inaction, lack of posts, lack of posts, alcoholism, etc. , will seriously investigate the responsibility of the responsible person.

Emergency plan for typhoon and rainstorm prevention in hospital 4. Purpose:

Before the natural disaster of typhoon and rainstorm comes, we should make all kinds of emergency preparations in advance, control the situation quickly and effectively, and handle it properly to minimize the possible losses caused by typhoon and rainstorm.

Second, the beginning of the plan:

After receiving the typhoon rainstorm warning signal issued by Zhuhai Meteorological Observatory, this plan was officially launched.

Third, the organization:

(a) leading group for typhoon and rainstorm prevention:

Team leader:

Deputy team leader:

Members:

(2) Typhoon and rainstorm prevention working group:

1, Engineering Group:

Team leader:

Team members:

2. Equipment group:

Team leader:

Team members:

3, security mobile group:

Team leader:

Team members:

4, administrative logistics group:

Team leader:

Team members:

Fourth, responsibilities:

(a) the responsibilities of the leading group for typhoon and rainstorm prevention:

1, responsible for the organization, coordination, supervision and inspection of typhoon and rainstorm prevention.

2. Commander-in-Chief Su Ying is responsible for the overall work; Li Jian, deputy commander-in-chief, is in charge of the guard mobile group and the administrative logistics group; Wu Jinhui, deputy commander-in-chief, is in charge of the engineering group and equipment group.

(two) the duties of the typhoon and rainstorm prevention working group:

1, Engineering Group:

Responsible for the overall arrangement, inspection and coordination of typhoon prevention and rainstorm prevention in supervision and construction units within their jurisdiction.

Responsible for the reinforcement, protection, drainage and flood control of buildings, equipment and facilities on the construction site.

Responsible for the organization, inspection and implementation of personnel evacuation on the construction site.

Responsible for organizing an emergency rescue mobile team composed of construction units to stand by at any time, as a reserve team to deal with emergencies, directly sent by the leading group.

2. Equipment group:

Responsible for the overall arrangement, inspection and coordination of typhoon prevention and rainstorm prevention in supervision and construction units within their jurisdiction.

Clarify the key work contents of typhoon and rainstorm prevention and report to the leading group.

Be responsible for the reinforcement, protection, drainage and flood control of buildings, equipment and facilities on the construction site under the jurisdiction of the Equipment Department.

Responsible for organizing, inspecting and implementing the evacuation of personnel from the construction site under the jurisdiction of various equipment departments.

3, security mobile group:

Responsible for public security work within the jurisdiction, and do a good job in emergency adjustment of fixed posts and patrol posts.

Responsible for the preparation of materials needed for emergency rescue.

Responsible for the acceptance and inspection of typhoon prevention, rainstorm prevention, reinforcement and evacuation within the jurisdiction.

Responsible for coordinating relevant working groups to deal with detected security risks.

Responsible for rescue personnel in emergency rescue work.

4, administrative logistics group:

Responsible for collecting the latest typhoon and rainstorm warning information in time, and announcing the beginning and end of this plan.

Summarize the key parts of typhoon and rainstorm prevention reported by each working group and report them to the work leading group.

Responsible for the organization, coordination, inspection and supervision of administrative logistics.

Be responsible for arranging accommodation for evacuees and staff.

Be responsible for the vehicle dispatch of the administrative motorcade and arrange the first aid ambulance.

Contact medical rescue organizations and coordinate the arrangement of medical personnel.

Responsible for the coordination of various working groups.

Responsible for counting people, goods and materials after typhoon and rainstorm.

Responsible for insurance claims.

Five, typhoon prevention and rainstorm prevention work communication contact list:

Security, administrative personnel, engineering, equipment, catering, general affairs, art troupe, market.

Time of establishment:

Typhoon and rainstorm prevention working group: all staff of Mystic Island.

Six, evacuation location:

Job responsibilities:

1, Office of the Safety Committee: responsible for organizing the work of prevention and rescue.

2. Administration and Personnel Department: responsible for collecting the latest typhoon and rainstorm news in time, announcing the start and recovery of this plan, and coordinating the wind emergency and post-event handling.

3. Security Brigade of General Affairs Department: responsible for emergency rescue, guidance and on-site protection, and assisting relevant departments in handling typhoon disasters and accidents.

4. General Affairs and Market Service Room: responsible for rescuing people injured in typhoon and rainstorm disasters and arranging emergency rescue vehicles.

5. Equipment Department: responsible for the inspection and maintenance of equipment safety in the park, and eliminating hidden dangers of equipment.

6. Engineering Department: responsible for water and electricity treatment in emergency; Protect scenic spots and facilities and repair damaged parts; Treatment of trees and flowers. 7. Finance Department: responsible for handling insurance claims.

8. Other departments: Take emergency measures to prevent typhoons and rainstorms according to the responsibilities of the department. In principle, the heads of all departments shall arrange personnel to assist in handling natural disasters and accidents.

Seven. working procedure

1. After receiving the notice of typhoon and rainstorm from superiors or relevant units, the Administration and Human Resources Department and the Safety Committee Office immediately reported it to relevant leaders and forwarded it to various departments.

2. The Administration and Personnel Department, Security Brigade, Engineering Department, General Affairs Department, Tourism Department, Catering Department, Finance Department, Equipment Department, Art Troupe and relevant departments set up typhoon and rainstorm prevention working groups, with the leaders on duty in the General Manager's office as the chief commander. Managers of all departments organize the establishment of emergency teams to lead their departments to implement emergency measures against typhoons and rainstorms.

3. All employees can recognize the signals and meanings of typhoons and rainstorms. After receiving the notice, all departments should immediately organize their employees to do a good job in wind and flood prevention.

4. Each department and office shall organize employees to inspect the facilities in the scenic spot, reinforce and fasten the assault boat, and park the coaches and cruise ships in a safe place.

5. The administrative motorcade of the General Affairs Department arranges ambulances or emergency vehicles, and the infirmary is responsible for rescuing the injured.

6. If there is a strong wind enhancement signal, a red typhoon signal or a red rainstorm forecast signal in the typhoon rainstorm signal, the security brigade should organize a volunteer rescue team with more than 15 people to stand by at the watch post as a mobile force to prevent typhoon rainstorm.

7. In case of typhoon and rainstorm when opening the park, the tourism department will inform tourists to pay attention to safety through broadcasting after receiving the notice from the administrative personnel department. Security guards of the public security brigade and personnel of all posts in the park should pay close attention to the safety of tourists, buildings and facilities in the scenic spot and report the situation immediately.

8. The leaders of the general manager's office decide whether to close the park in advance according to the size of typhoon and rainstorm. If the park is closed ahead of schedule, the general manager on duty should inform the Tourist Department to broadcast that the park is closed ahead of schedule due to typhoon and rainstorm, and the staff of General Affairs Department, Tourist Department, Equipment Department, Engineering Department, Catering Department and Art Troupe will guide the tourists to leave the park in the scenic spot.

9. After the typhoon and rainstorm, the Administration and Personnel Department will coordinate, and the General Affairs Department and the Finance Department will take photos to collect evidence, count the lost materials and be responsible for handling insurance claims.

10, Engineering Department and Equipment Department organize personnel to repair damaged building facilities, flowers and trees blown down by typhoons and rainstorms, and clean up the site.

1 1. Departments and personnel who have made outstanding achievements in typhoon prevention and rainstorm prevention shall be commended and rewarded in accordance with the Staff Rewards and Punishment Regulations. Serious dereliction of duty, causing heavy losses and serious consequences, shall be investigated for responsibility according to the relevant provisions.

Emergency plan for typhoon and rainstorm prevention in hospital 5 In order to do a good job in typhoon prevention in my construction site, reduce disaster losses and ensure personal and property safety, according to the spirit of the Law of People's Republic of China (PRC) on Safety in Production and relevant documents of the District Construction Bureau, combined with the actual situation of our company, the emergency response plan of this project department is specially formulated.

First, the basic principles of emergency treatment

(1) This plan is the basic procedure and organizational principle for emergency treatment when the construction site is attacked or affected by a typhoon.

(two) the implementation of emergency treatment follows the principle of unified command, responsibility, prevention first, rescue first, rapid response and safety first.

Second, the organization and the responsibilities of the supervisor

The project department set up a leading group for typhoon prevention on the construction site.

Team leader:

Deputy team leader:

Members:

Main responsibilities:

(a) responsible for formulating and revising the emergency plan for typhoon prevention in construction projects;

(2) Before the typhoon comes, inform the construction site to do a good job of typhoon prevention, check the reinforcement of safety facilities on the construction site, and evacuate and transfer workers;

(three) arrange personnel on duty, check the construction site, immediately organize rescue and rehabilitation work, maintain close contact with the higher authorities, and report the emergency treatment at the scene of the accident at any time;

(four) after the typhoon, responsible for convening relevant personnel to summarize the emergency handling of the accident.

Third, the implementation of the plan

(1) received the news released by the Meteorological Observatory, which is expected to be affected by the typhoon:

1, the site project management department issued a typhoon prevention notice, and the relevant personnel of the project department paid close attention to the weather news and the typhoon trend;

2, the project intends to inform the relevant personnel and team, require all staff to cooperate closely, do a good job in the preparations for typhoon prevention.

(two) the typhoon approaching our city will affect our region within 48 hours, and the Meteorological Observatory will issue a typhoon warning:

1, the project department arranges the construction reasonably and stops the process that must be continuously constructed;

2, the project department should cooperate with the branch to do a good job of safety inspection before the typhoon, including whether the construction elevator is firm, scaffolding and other facilities are firm, whether the temporary work shed is safe, etc. And take measures to strengthen and eliminate potential safety hazards.

(three) there may be a typhoon in our area within 24 hours, and when the Meteorological Observatory issues an emergency warning:

1, the typhoon prevention leading group of the project department is in place, and personnel are arranged to be on duty;

2. The construction site stops and the construction personnel are evacuated to safety;

3, the project intends to organize personnel to patrol the scene, cooperate with the company's leading group to further check the implementation of various defensive measures, and ensure that the on-site rescue team is in place and in a state of war;

4. During the typhoon, the safety accidents with casualties on the construction site shall be implemented in accordance with the Company's Emergency Rescue Plan for Major Safety Accidents in Construction Projects.

After the typhoon, when the meteorological station issues a typhoon warning, the project department should check the disaster situation and report it to the branch and the head office. Strengthen the site safety facilities in time and summarize the typhoon prevention work.

;