What is the decoration process of a three-bedroom and two-bedroom house?

1. Design

(1) Layout of the house: design according to your own understanding of the functional areas of the house and your favorite style.

(2) Drawing of construction drawings, drawing detailed construction drawings with dimensions, such as decorative walls and furniture.

2. Budget

(1) Water and electricity budget (water supply and drainage pipes and fittings, strong and weak electric wires, threading pipes and fittings, water and electricity installation fees).

(2) the ground engineering budget (tiles, floors, etc. ).

(3) ceiling project budget.

(4) Budget of wall engineering (wall paint, wallpaper, etc.). ).

(5) woodworking project budget (furniture, decorative surfaces, etc.). ).

(6) Windows and doors engineering budget.

(7) Other project budgets (installation cost of finished furniture or objects, cleaning and sanitation cost, transportation cost, etc.). ).

3. Architecture

Interior decoration projects are usually divided into masons, plumbers, masons, carpenters, painters, cleaners, porters, professional product installers and so on. After the renovation begins, the following steps are roughly followed:

1. Masonry and trunking: all pipe trunking (water supply and drainage roads, strong and weak current lines) and wall demolition and hole opening according to design requirements. (usually completed within 3 days)

2. Plumber, wiring: installation and layout of circuits, waterways and gas circuits. (usually completed within 4 ~ 7 days)

3. Masonry (water), civil engineering and surface decoration of wall and floor tiles: burying trunking, building walls, repairing various walls of heaven and earth, and laying floor tiles. (usually completed within 10 ~ 25 days)

4. Woodworking, decoration and decoration production: all decorative surfaces (walls of heaven and earth) and furniture shall meet the design requirements. (usually completed within 15 ~ 30 days)

5. Painters, furniture and wall coatings: all wooden furniture, decorative surface coatings, ceiling and wall coatings (latex paint, wallpaper wall covering). It usually takes 20 ~ 40 days to finish, especially when doing wall paint, which has a lot to do with the weather. )

6. Installation of plumbers, lamps and sanitary wares. (usually completed in 3 ~ 4 days)

7. Others: wooden floor curtain installation, self-purchased hardware pendant installation, overall land reclamation and cleaning. (usually completed in 3 ~ 4 days)

8. Buy furniture (such as sofa and dining table). ).