Traditional Culture Encyclopedia - Hotel accommodation - How about Yijing Bay and the surrounding facilities of this property?

How about Yijing Bay and the surrounding facilities of this property?

The following is the property information and surrounding supporting information of Yijing Wanhe Project:

Regional plate Huangcun commercial plate

Building type layer

Is this property for sale?

Unit type: 80 flat, 85 flat, 133 flat, 135 flat, and the main unit type is 80-85 cost-effective unit type.

The current offer is 5.5w

Delivery time: September 2020

Delivery of blank in decoration state

70—years of property rights

Total price range 440-460

Developer Beijing Rong De Real Estate Development Co., Ltd.

Yuanyang yijia property

Address: 800 meters north of Yihezhuang subway on Line 4 of Xinyuan Street.

Property fee 3.8 yuan/m * month

Hydropower, civil water, civil electricity and gas

Heating mode to be determined

Parking ratio is 1: 1.7(7 17 parking spaces).

Floor area ratio 2.5

The storey height is 2.9.

The greening rate is 30%

Traffic facilities are 0.8km away from Yihezhuang subway station.

Medical facilities: South Area of Guang 'anmen Hospital, First Hospital of Peking University, Daxing Campus of Beijing Children's Hospital (all three hospitals are 3A hospitals).

Educational facilities include Beijing Primary School Daxing Branch, Yonghua Experimental School, Daxing No.2 Primary School, Beijing Key Middle School Daxing No.1 Middle School, Beijing Normal University Daxing Affiliated High School, etc.

80% of the commercial supporting areas are high-quality supporting facilities, including two major businesses, namely Huiju and Times Street, and six business districts, namely, Huoshen Temple, Yihezhuang, Colorful City and Hongkun, with living facilities of about 2 million square meters.

The environment is surrounded by Niantan Park (2,500 mu (1.5 km), Qingyuan Park (2 145 mu (1.4 km), river green space (1 km) and 3,429 mu of multiple natural ecological landscapes.

(equivalent to 2.5 Summer Palace). ?

Disadvantages of the project: the lighting design of some units is slightly inferior.