Who has a model contract for hotel decoration design and construction?

Party A: (hereinafter referred to as Party A)

Party B: (hereinafter referred to as Party B)

In accordance with the Economic Contract Law of the People's Republic of China and the relevant regulations of the Ministry of Construction and the provincial and municipal construction committees on architectural decoration projects, this contract is hereby signed by both parties through consultation:

I. Project Overview and Contracting Method

1, Project Name: Decoration Project of Grand Hyatt Xindi Hotel.

2. Project location: Wulin Avenue, honghu city.

3. Project contracting method: contracting for work and materials.

4. Project Overview: The construction area is about 474.06 square meters.

Second, the engineering decoration content

1. Decoration works of Grand Hyatt Xindi Hotel, such as indoor ceiling, wall, floor and electrical decoration works.

Third, the project cost

1, the project cost is based on the construction drawings, Party A's use requirements and design requirements; The project cost is 845,674.00 yuan. RMB in words: eight hundred and forty-five thousand six hundred and seventy-four Yuan only. (subject to the unit price determined by Party A, subject to the audit after the completion of the engineering quantity)

Fourth, the project cycle

Commencement date: 20 13.

Project completion date: 20 13.

Verb (abbreviation of verb) quality requirements

According to the industry standard JGJ 73-9 1 Code for Acceptance of Building Decoration Engineering of the Ministry of Construction and the standards stipulated by provincial and municipal construction committees and fire departments, the project quality has reached the top level. If there are any quality problems after the completion of the project (except those caused by human factors, which will be used by Party A after the completion), Party B shall guarantee them free of charge for one year and maintain them for life.

Terms of payment for intransitive verbs

1. After the contract is signed, Party A shall pay Party B 10% of the total project cost.

2. After the project is completed and accepted, Party A shall pay Party B 85% of the total project cost, that is, 845,674.00 yuan * 85% = 7 18822.90 yuan.

3. 5% of Party B's remaining project funds shall be paid as quality guarantee within one year.

Seven. Responsibility of both parties

1. Party A is responsible for providing the use and design requirements of the whole project; Provide the location of water and electricity on site; Provide material transportation channels, necessary material storage sites and design drawings of original buildings; Responsible for indicating the location of power distribution system, piping system and water supply and drainage master valve involved in the decoration project; The construction site should be flat.

2. Party B: Provide Party A with engineering decoration construction design drawings and engineering quotation.

Eight. any other business

Party A and Party B agree to reach the following agreement:

1. If the construction cannot be carried out due to special circumstances or force majeure, the construction period can be postponed; All losses caused by breach of contract shall be borne by the breaching party.

2. When the materials and technology of the project or project other than the quotation of this project are changed, after Party A confirms the comprehensive unit price, the "on-site visa form" shall prevail and be included in the addendum to the final accounts of completion. (If the project beyond the quotation of this project or the project materials and processes have changed, Party A has recognized it, but Party A does not have a visa, and the expenses incurred will also take effect. )

3. When the engineering quantity changes, the engineering quantity calculation of the project audit after completion shall prevail.

4. If Party A or Party B breaches the contract and fails to implement the contract, they may appeal to the superior competent department or arbitration institution.

5. Other matters not covered shall be settled by both parties through consultation.

6. This contract is made in duplicate, which shall come into effect after being signed by both parties, and each party holds one copy, with the same legal effect.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _