Traditional Culture Encyclopedia - Hotel accommodation - Decoration design of express hotel

Decoration design of express hotel

The decoration of Express Hotel is very different from other renovations. Whether it is the decoration design or the decoration process of Express Hotel, many bosses who don't understand the decoration of Express Hotel have a headache. So how to decorate the express hotel? Let's take a look together.

Express hotel decoration process:

Express Hotel 1 Civil Decoration Design

After the project enters the site, the civil construction unit shall design and pay off according to the layout and the actual situation on site, and the fire control construction unit shall draw the drawings according to the pay-off and submit them for approval; Bind the finished molds, leave the bathroom door open, and pour concrete into the water stop; After the concrete is solidified, build a wall with light blocks, and then brush the interface agent on the wall; After the wall is laid, the ground should be leveled. Considering the shortened construction period, it is suggested that hydropower construction, fire fighting construction and site leveling should be carried out simultaneously.

Decoration design of express hotel II. fire engineering

After the on-site setting-out, the fire control construction unit shall draw drawings according to the on-site setting-out and submit them for approval. After the wall masonry is completed and the drawings are approved, the construction shall be carried out according to the approved drawings. Before carpentry enters the site, all pipes are required to be installed and pressure tested.

After the woodworker tied the keel, the fire fighting construction unit installed the sprinkler, and placed the smoke signal line and the fire fighting broadcast signal line at the same time. According to the drawings, before the corridor is closed, the fire emergency lighting power supply and the evacuation indicator light power supply shall be "slotted, laid and threaded" on the wall or top surface of the corridor.

After the painter finishes painting the wall surface, the fire-fighting construction personnel shall install smoke detectors, manual alarms, emergency lighting, evacuation indicator lights, fire-fighting broadcasts and decorative covers for nozzles. And install linkage alarm in the computer room for detection.

Decoration design of express hotel. Hydropower project

After the metope build by laying bricks or stones, plumber comes into play, to do temporary water and electricity; According to the design of the room, the electrician carries out "slotting on the wall of the room-fixing the box-laying pipes-mending the slot-threading in the room-bridging in the corridor-threading in the corridor-wiring in the distribution box"; After the painter finishes the roll coating of latex paint, install lamps and panels. The whole construction sequence shall be carried out according to the principle of guest room first, walkway later and computer room later.

Hydraulic engineers carry out the work of "slotting the bathroom wall-laying pipes-mending grooves-making the water inlet pipe main-hot water inlet pipe main-pressure test" and "punching holes-making the sewer branch pipe-making the sewer main pipe and exhaust pipe". When making the main water inlet pipe in the corridor, it should be docked with the hot water system construction unit to determine the technical parameters such as the diameter and direction of the main water inlet pipe and the main pipe.

Decoration design of express hotel. weak current engineering

After the completion of the electrical bridge, the weak current construction unit enters the site to thread, including network cable, telephone cable, TV cable, WiFi cable, background music cable and monitoring cable.

After the painter finishes the wall coating, the weak current construction personnel will install the panel. The whole construction sequence shall be carried out according to the principle of guest room first, walkway later and computer room later.

Decoration design of express hotel. Ceiling engineering

After the high-pressure guest room threading and low-pressure threading are completed, the woodworker enters the site to tie the keel, and after the fire fighting construction unit completes the nozzle installation, the guest room gypsum board can be sealed, and the lamp trough and curtain box can be installed.

After the arrangement of smoke cables, emergency lighting cables and spray pipes in the corridor of the fire fighting construction unit is completed, the plumber can thread the high-voltage corridor bridge, the corridor lighting and the corridor water supply and drainage supervisor, and the woodworker can seal the corridor gypsum board after the low-voltage corridor, WiFi, audio and monitoring bridge are threaded.

After the tile laying in the bricklayer's bathroom is completed, the carpenter will hang the top surface of the bathroom. (Considering the convenience of later maintenance, aluminum gusset ceiling is generally used at present. )

Decoration design of express hotel. Tile project

After the water supply pipeline pressure test is completed, the bricklayer first carries out basic treatment on the bathroom wall and ground, repairs the damaged parts of the wall and ground, and pours concrete on the pipe hole hanging formwork. Cement mortar is used as the slope at the internal corner.

After the basic treatment is completed, the polymer elastic waterproof coating should be painted at least twice, and the last coat should be dried before each painting. The two painting directions are perpendicular to each other. Every time you roll-coat waterproof paint, you should use a brush to treat the pipe wall, internal corner and door specially.

After waterproofing is completed, conduct a water closing test. The toilet floor can be filled with water for 48 hours. Check the corners, internal corners, doors and pipe walls for water leakage. If there is water leakage, find out the reason and deal with it in time. After waterproofing is completed, brick laying will begin, and the wall and floor tiles soaked in water will be laid in the order of brick laying first and then paving.

Decoration design of express hotel. Latex paint project

After the ceiling is completed, install gypsum line as needed. The painter first hangs a net on the wall to repair the groove, and vertically handles the angle of yin and yang. The joints of ceiling plasterboard are treated with adhesive tape, and screw holes are repaired with black cement.

Plaster the prepared putty powder at least twice with an iron plate until the wall and top surface are smooth and free from unevenness. Before each plastering, you need to wait until the last plastering is completely dry. After plastering is completely dry, sand the wall with sandpaper. Clean the construction surface with a feather duster and roll-coat latex paint twice with a roller. After the furniture installation is completed, the painter needs to repair the wall damage that occurred during the installation.

Decoration design of express hotel. Finished product installation

(1) Shop Recruitment Installation

In order to better publicize the Express Hotel, according to the hotel property, the sooner the hotel stores are installed, the better.

(2) Installation of hot water system

When the plumber is the main water inlet pipe of the corridor, the construction unit of the hot water system conducts on-site investigation and selects equipment according to the number of rooms and the length of the pipeline. Before installing the equipment, it is necessary to make a good foundation for the water tank and equipment. The common method is to add load-bearing foundation beams to the corresponding beams and columns. After the foundation is laid, place the equipment and water tank and connect the pipes. You can test the water after the sanitary ware is installed.

(3) Floor installation

After the guest room is painted for the first time, the floor can be laid.

(4) Electrical installation

Air conditioning and TV set are installed in the guest room after secondary painting. If the air conditioning pipe is placed on the upper part of the ceiling, the copper pipe should be placed before the woodworker seals the gypsum board.

(5) Installation of doors and furniture

Because the production cycle of doors and furniture is long, you can contact the supplier and measure the size and quantity of doors and furniture on site after the wall is built. Paint before installing the door, and then install the door lock; The installation of furniture can only be carried out after the floor installation is completed.

(6) Sanitary ware installation

Because the production or deployment of sanitary ware takes time, it is necessary to place an order half a month in advance. Sanitary ware can be installed after the bathroom ceiling is completed.

(7) Carpet installation

After the installation of the Express Hotel is completed, carpet can be laid after the first cleaning to ensure that there is no garbage.

The above is the whole content of the decoration design and process of the Express Hotel brought by Bian Xiao.