Traditional Culture Encyclopedia - Hotel accommodation - Hohhot Mazongshan Ski Resort Tender Announcement Hohhot Mazongshan Ski Resort Tender Announcement Latest
Hohhot Mazongshan Ski Resort Tender Announcement Hohhot Mazongshan Ski Resort Tender Announcement Latest
Mazongshan Ski Resort Project EPC General Contracting Bidding Announcement
1. Bidding Conditions
Mazongshan Ski Resort Project EPC General Contracting has been completed for housing in Saihan District, Hohhot City and the Urban and Rural Development Bureau for filing. The tenderer is Hohhot Metro Industrial Co., Ltd. The funds required for the project come from state-owned investment of 100.00 yuan, self-raised investment of 100.00 yuan, government investment of 0.00 yuan, non-state-owned investment of 0.00 yuan, and the project planned investment is 942.8955 million yuan. The project has met the bidding conditions and is now open to public bidding.
II. Project Overview and Bidding Scope
(1) Project Name: Mazongshan Ski Resort Project EPC General Contracting
(2) Construction Location: Hohhot City --Saihan District--Yulin Town
(3) Bidding content:
1. Construction scale:
The land area of ??Mazongshan Ski Resort is 269.32 hectares. The total snowmaking area is 460,000 square meters (including 28,000 square meters for playing in the snow), and the total number of snow trails: 14, 1 beginner trail, 9 intermediate trails, 3 advanced trails, and 1 snow circle trail. The total length is about 8.7 kilometers. The maximum carrying capacity is about 7,700 people. Phase I ski trail: planned snowmaking area is 330,000 square meters, carrying capacity: 5,800 people. It plans to have 1 beginner trail, 5 intermediate trails, 3 advanced trails, 1 snow circle trail, and a snow play park. The transportation system plans to have 3 magic carpets and 2 cable cars. The first phase of leisure service facilities: a ski service hall with a planned construction area of ??6,600 square meters; the first phase of basic facilities: a planned reservoir with a capacity of approximately 83,700 cubic meters, and a mechanical warehouse with a construction area of ??800 square meters. 1 pump room with a construction area of ??600 square meters; 1 parking lot with an area of ??28,000 square meters. Phase II ski trail: planned snowmaking area of ??130,000 square meters, carrying capacity: 1,900 people. 4 intermediate ski trails are planned, and 1 cable car is planned for the transportation system. The second phase of leisure service facilities: a ski service hall (permanent) with a construction area of ??6,000 square meters; a hotel and youth hostel with a construction area of ??22,000 square meters; a service facilities with a construction area of ??1,000 square meters; construction area A B&B of 13,000 square meters. Basic supporting facilities for the second phase: a reservoir with a planned capacity of approximately 150,000 cubic meters; and a staff dormitory with a construction area of ??4,000 square meters.
For this project, the construction, installation and equipment procurement cost in the reviewed feasibility study report is 942.8955 million yuan; of which the first phase is 420.7967 million yuan; the second phase is 522.0988 million yuan.
2. Service content:
This tender is for (EPC) general contracting, and the scope of the project contracting includes the design, equipment procurement and installation, construction, etc. of the first and second phases of the ski resort. , including but not limited to all of the following:
(1) Design stage tasks
The scope of services is all planning and design work of the Mazongshan Ski Resort project. Including but not limited to the overall planning and design of Mazongshan Ski Resort, controlled detailed planning (municipal planning) design, overall design and general contract management of the ski resort; conceptual planning and design scheme of the ski resort, preliminary design, construction drawing design and changes of all majors design.
1.1 Mazongshan Ski Resort project general drawing design, ski resort construction engineering civil engineering and decoration, cableway system, equipment system and installation engineering design, foundation treatment design and slope support design within the project scope , Landscape design, professional design of architecture, structure, water supply and drainage, HVAC, power lighting, professional weak current design of all building structures, interior decoration design, guide sign design, BIM design, road and parking lot design, multimedia animation production, etc.
1.2 Mazongshan Ski Resort Project flood control and drainage channel engineering design, snowmaking water intake engineering design (including water intake points, pump rooms and related building structures, water supply pipelines, reservoirs, etc.), domestic drinking water Integrated design of water exploration and mining (including water supply wells, pump rooms and related building structures, water supply pipelines crossing special coal transportation roads, special design of western natural gas, etc.).
1.3 Engineering design work such as the power supply introduction project outside the Mazongshan Ski Resort project and the 10kV high-voltage power supply within the ski resort area.
(2) Construction phase tasks
Phase I: ski slope project (earth excavation, slope protection, drainage ditch, safety net); water intake project (regulating gate, water pump stations, water pipes, reservoirs, etc.); flood control channel projects; ski equipment halls (site earthwork excavation and filling, foundation treatment, main structure, decoration, kitchen equipment, etc.); electromechanical systems; weak current systems; ticketing systems; guide signs ; Outdoor pavement hardening; domestic drinking water projects (tube well construction, pipeline engineering, pump station civil engineering and equipment procurement and installation, etc.); parking lot (site earth and stone excavation and filling, paving, guidance signs, parking management system, etc.); supporting projects (Mechanical warehouse, boiler room, pressurized pump station, opening and closing station, sewage treatment facilities, garbage transfer station, gas storage station, ropeway control room, station platform and garage, etc.); Ancillary projects in the site (greening, lighting, billboards, rainwater and sewage systems, integrated pipelines, etc.); power supply projects (temporary power, external power introduction, on-site power distribution, etc.); other earth and stone projects (commercial reserved land, gas storage stations and other areas of earth and stone excavation and filling, etc.); Ropeway engineering (ropeway equipment procurement, installation and foundation construction); on-site permanent road engineering; snowmaking system (water pumping station, snowmaking pipelines, snowmaking machine procurement and installation, dedicated power distribution); magic carpet (magic carpet equipment Procurement, installation and basic construction); operating supporting equipment and equipment.
Phase II: ski slope project (earth and stone excavation, slope protection, drainage ditch, safety net); reservoir expansion; flood control channel project; ski equipment hall (basic treatment, main structure, decoration and decoration) , wind, water and electricity installation, kitchen equipment, etc.); electromechanical systems; weak current systems; ticketing systems; guidance signs; outdoor pavement hardening; study, dormitory, hotel, B&B renovation, night venue lighting, parking lot (site earth and stone excavation, paving , guide signs, parking management system, etc.); supporting projects (sewage treatment equipment, cableway control room, station platform and garage, etc.); ancillary projects within the site (greening, lighting, billboards, rainwater and sewage systems, comprehensive pipelines, etc.) ); power supply project (external power expansion, on-site power distribution, etc.); ropeway project (ropeway equipment procurement, installation and foundation construction); on-site permanent road project; snowmaking system (water pump, snowmaking pipeline, snowmaking machine procurement and installation, dedicated power distribution); operating supporting equipment and equipment.
Click to view: Original text of the tender
- Previous article:Job responsibilities of the account manager position
- Next article:What are the maple leaf scenic spots in Suzhou?
- Related articles
- How to write a speech to host a banquet of an insurance company
- 10 What jobs are suitable for the deaf?
- What's the name of Jin Yue Hotel?
- English? English Band 4. Didn't Cuba speak Spanish? I want to have a comfortable time, but I don't want to rush. I haven't studied his scenic spots in depth.
- Idioms with culture, vision, prosperity and understanding.
- What are the scenic spots in Suzhou?
- Which way is from the railway station to Jingzhou Chunjiang Kazuki Watanabe musician International Hotel?
- Where is the regional culture more distinctive?
- What are the top ten domestic craft beer brands?
- Take a bus from Shenjing Village in Zhuhai to Chimelong Penguin Hotel.