Traditional Culture Encyclopedia - Hotel accommodation - Project design scheme
Project design scheme
I. Introduction
Invited by the government of Dongxihu District in Wuhan, Yuya Group International Co., Ltd. invested in the development and construction of five-star hotels, office buildings, real estate development and other projects in gold and silver lake. The architectural design scheme of five-star hotel-gold and silver lake Walden International Hotel (tentative name) is invited for international public bidding, hoping to leave the wisdom and innovation of bidders in gold and silver lake.
Second, the project overview
1. Project name: Walden International Hotel, gold and silver lake (tentative name)
2. Tenderee (Owner): Yuya Group International Limited
Wuhan dongxihu district gold and silver lake ecological garden administrative Committee
Wuhan yuya hotel investment co., ltd
3. Construction site: north of Jinshan Avenue and east of gold and silver lake Road, gold and silver lake Street, Dongxihu District, Wuhan City, Hubei Province.
4. Coverage scale: the planned net land area is 35,834.70 square meters (about 53.75 mu). In addition, 75 meters wide green space near Jinshan Avenue and 30 meters wide green space near Yinhe Lake are about 70 mu, which can be used as hotel landscape land. See the land red line map.
5. Nature of land use: the hotel land is used to build high-end foreign-related star hotels; Land classification: other commercial land
6. Development mode: overall design and phased construction.
7. Bidding content: architectural design scheme
Third, the design basis
1 and 1 Copy of current topographic map: see attachment 1 (including electronic documents).
2. Planning and design (land use) conditions: see Annex 2.
3. Relevant codes and technical regulations of China, Hubei and Wuhan.
4. Relevant requirements of the construction unit
Four, the basic requirements of architectural design scheme
1. Project location: international five-star lakeside hotel.
The development of this project aims at guiding and demonstrating the hotel industry in Dongxihu District and Wuhan City. The scheme design should embody the principle of "ahead of time, over cash and over value". "Advanced" means that the project should be forward-looking, in line with the development trend of the hotel industry in China and Wuhan, and the design concept should be advanced; "Surplus" means that the project design should surpass the present situation of Wuhan hotel industry, which is refreshing; "Supervalue" is to create a high-grade, high-grade and high-value international five-star hotel through meticulous planning, architectural style, environment and materials.
2. This project should follow the people-oriented principle, closely combine the characteristics of geographical location, human history and external natural environment, boldly adopt advanced design concepts and technologies, and comprehensively enhance the value of hotels and lots through scientific and reasonable layout.
3. The project is located in gold and silver lake Ecological Park, a famous "ecological garden city" in Wuhan, with superior environment. Silver Lake in the east, Jinshan Avenue in the south, Yinqiao flying to Silver Lake in the east, gold and silver lake Road in the west, Sanjiang space land in the north, 75m green belt near Jinshan Avenue and 30m green belt near the lake. The government agreed to rent it for free. Making full use of lakeside features and creating holiday garden hotel atmosphere is the key to the success of this project design. Bidders need to fully demonstrate and elaborate the principles and ideas of scheme design.
4. Project scale and content
(1) The total construction area of this project is about 90,000 square meters, and the designer should configure it according to the standards of five-star hotels and meet other design requirements of this tender. The staff living quarters are not within the scope of this plot.
(2) The project is planned to be constructed in two phases.
The construction area of the first phase is about 60,000 square meters, with about 300 guest rooms (which should be decorated by stages when designing) and main supporting rooms such as business, catering, conference, sauna and nightclub. In addition, there are 3-5 single-family superior rooms with about 3 floors, independent parking spaces and entrances in the area with good lake view. The second phase covers an area of about 30,000 square meters, mainly including high-rise business hotels.
When designing, we should fully combine the current situation, reasonably organize the entrance and traffic streamline to meet the needs of phased implementation.
(3) This project is a group building, which makes full use of the landscape and meets the requirements of phased construction. In principle, catering meetings and nightclubs need to be set up separately, with their own independent entrances and exits. Planning and layout should fully understand the process of five-star hotels, and combine the requirements of phased implementation of this project to ensure smooth functional connection of all parts, reasonable zoning and economic utilization.
(4) After the rapid development in recent years, the gold and silver lake area where this project is located has a large number of residential areas, but the commercial facilities always stay at the stage of relying on community commercial services, so it is difficult to provide more diversified and comprehensive commercial services in the area, which brings great inconvenience to the lives of residents in the area. The location of this project is the core of commercial development in this region. In order to promote the commercial development in gold and silver lake area, when planning and designing the building of this project, the main or part of commercial facilities (such as business, catering, conference, sauna, nightclub, bar, etc.). ) The group layout can be properly considered to provide high-quality commercial, leisure and entertainment services for residents and consumers in gold and silver lake. This article is for reference only and is not limited.
(5) The elevation of the land for this project has a height difference of about 3m from the perennial water surface of Yinhu Lake. When planning buildings and environmental design, we should give full consideration to hydrophilicity, and rationally arrange lakeside buildings and underground parking garages by using the height difference.
(6) In this project, as far as possible, there is no overall basement, and combined with the environmental layout, a semi-basement can be set up by raising the elevation of the first floor of the building, with an area of about 8000- 10000m2.
5. Other design requirements
(1) single-family superior guest room building: floors 3-5.
Each building covers an area of about 400m2, and the building height should be 3 floors.
The single-family superior guest room building should have a separate entrance and parking lot.
(2) Superior business rooms: about 50 sets.
(3) Standard rooms: about 250 sets.
(4) Multi-function hall:
The area should be ≥ 1200m2, and it should be easy to use with partitions.
Verb (abbreviation of verb) economic and technical index requirements
Refer to Annex 2 (except the floor area ratio, other indicators can be slightly flexible).
Requirements for bidding design results of intransitive verbs
1, Atlas: 8 volumes
(1) design description: including design concept, overall layout, architectural style, greening, traffic, parking, sanitation, environment, energy saving, application of new materials and technologies, etc. It embodies the characteristics of "low-carbon" architecture and meets the needs of building a "two-oriented society" in China.
(2) master plan color plan
(3) Overall bird's eye view
(4) Traffic analysis diagram, fire protection analysis diagram, general plan of greening, building volume and urban landscape analysis diagram, etc.
(5) renderings of single building
(6) Plan of main monomer
(7) Investment estimation table
(8) Other documents and drawings that can express the design concept.
2. Large plate: 1 set, with a width greater than A 1.
(1) master plan color plan
(2) Overall bird's eye view
(3) renderings of single building
(4) drawings customized by other bidders.
3. Formal design quotation (including scheme, preliminary design and construction drawing)
Seven. Bidder's conditions
1, the enterprise has a good reputation and no bad performance record.
2, with the corresponding design ability, domestic design units must have Grade A qualification.
3. Participated in the design of five-star hotels with successful experience.
4. The qualifications and resumes of the main planning, landscape, architecture and professionals involved in the project design should be competent for this project and have certain qualifications and successful cases of similar projects.
5. Welcome domestic and foreign design enterprises to participate in the bidding of architectural design scheme of this project individually or jointly. Overseas design enterprises must have foreign architects to participate in on-site investigation, scheme report and major design work.
Eight. any other business
1. When the deadline for registration of this design bidding is April 8 * * 17:00, the construction unit will comprehensively evaluate all bidders, select three to five as official bidders, and issue an official invitation letter.
2. The tender submission time is 30 days after the bidder receives the official tender.
3. The construction unit and the government invited well-known experts at home and abroad to form a bid evaluation team for comprehensive bid evaluation.
4. The design units participating in the bidding, whether winning the bid or not, will be compensated with 100,000 yuan of labor costs (what about overseas design units? ~ 50,000 yuan transportation subsidy), and can be used as a design alternative for the hotel's subsequent design and construction units to invest in other projects in gold and silver lake. The first place, the second place and the third place will be awarded RMB150,000 yuan,100,000 yuan and 50,000 yuan respectively.
5. No matter whether the bidder wins the bid or not, the bidder will not return the originals and copies of the documents provided by all participating bidders and related electronic documents.
6. All bidders, whether winning the bid or not, agree that the bidder can unconditionally have the right to bid for the design results.
Project design scheme (2)
I. Analysis of development conditions
1, now we
We are now studying in Ningbo Dongqian Lake Tourism School, a sophomore. Our major is foreign-related administrative affairs, belonging to the "secretarial" major. At school, we often carry out some meaningful activities, which exercise our ability and improve our quality, such as the "Entrepreneurship Marketing Theme Class Meeting" and "Visiting Di Hong Garment Factory" last semester. Di Hong Garment Factory is run by one of our senior sisters, and it is a relatively large local enterprise in Dongqian Lake. Last year, its output value was as high as 65.438+0.6 billion. But like ordinary small and medium-sized companies, there are no professional secretarial staff and related departments. We are going to practice in May next year, but some students in our class don't want to be ordinary wage earners, so we have the idea of setting up a secretarial service company.
2. We are in the future
Ningbo's foreign trade industry is very developed, and there are many foreign trade companies, including many small and medium-sized enterprises. It is precisely because of the lack of professional secretarial staff in these enterprises that our secretarial service company will have great room for development. Before we embark on the internship in May next year, our enterprise secretarial service company will be established soon. We expect that after several years of experience, we can also have certain communication means and the ability to handle affairs, weave a good customer network, establish a good relationship with customers, and fulfill customer requirements. The "enterprise secretarial service company" we founded will also be on the right track and gradually mature.
3. Market prospect analysis
Our enterprise secretarial service company is aimed at small and medium-sized enterprises without formal secretarial staff, and such enterprises exist in Ningbo in large numbers. Members of our company have studied secretarial professional courses, such as basic secretaries, basic public relations, basic documents and archives management and basic practical writing. At the same time, I also studied international trade, import and export practice, marketing basics, foreign trade documents and other courses related to foreign trade enterprises, and had a perceptual understanding of the operation of foreign trade enterprises. Therefore, on the basis of basic secretarial literacy, combined with foreign trade knowledge, we can handle all kinds of secretarial affairs of general companies well, help companies communicate with each other, and also guarantee to keep business secrets for the companies we represent. At the same time, we will also establish a company website that is open to the outside world, which can not only meet the actual needs of small and medium-sized enterprises, but also meet the needs of individuals in society for secretarial work. Such companies are rare in the market. Therefore, it has a good market prospect.
4, the main work completion survey
To understand the real needs of small and medium-sized enterprises, the company has made an overall plan from the aspects of achieving goals, operating mechanism and project strategy. In addition, in terms of system development scheme, the company also consulted a large number of documents about website services in combination with the actual situation in China, and combined with the knowledge of e-commerce learned in class, made a website operation process and design process suitable for the company, as well as a system logic scheme suitable for our company.
5. Fund management
Source of funds: 50,000 yuan each, and 4 people contributed1* * * 200,000 yuan as the start-up capital.
Capital expenditure: store decoration, store rent, employee salary and other miscellaneous expenses.
Capital gains: members will be charged for on-site service in the enterprise (the charge will depend on the situation).
6. Shortcomings and difficulties
Because our enterprise has just started planning, there is a serious shortage of funds, and because of the tight time, the whole planning is inevitably lacking, but we will try our best to enrich and improve it. In website design and production, because our team members don't know enough about this knowledge, we have great difficulties in website design, but through our joint efforts and cooperation, as well as our unique services. I believe that our secretarial service company will eventually get on the right track and become a formal and professional secretarial company.
Seven, risk analysis:
1. When a company starts its business, it will lack customers because of its lack of visibility.
2. At the moment of financial crisis, the internal operation of the company will be more difficult.
3, door-to-door service is prone to disputes, such as: customers are dissatisfied with disputes, customers do not pay for unreasonable troubles.
Solutions to the above risks:
1, do a lot of publicity for the company to improve its popularity.
2. Save money, and Qi Xin, a member of the company, worked together to tide over the financial crisis.
3. Develop a series of door-to-door service systems to show the quality service level. Before the door-to-door service, do a certain investigation on the reputation of the other company, and charge a certain deposit when both parties are interested in discussing cooperation.
Second, set development goals.
1, we have a strong interest in secretarial major, and interest inspires our actions.
Our common weakness is lack of practice, so we should urge each other, make progress together, achieve our goals together and start a business together.
3. Through self-analysis, market research and combining with what we have learned in our major, we finally set our own goals-to open a secretarial service company, accumulate experience and communicate with people more. Use the practical knowledge of public relations we have learned to determine our development goals.
4. The superior plans and manages the subordinate, and the subordinate should obey the work guidance of the superior and try his best to complete the tasks arranged by the superior.
5, coordinate the relationship between leaders and employees, the relationship between the company and customers, so that the company has an active working atmosphere, so that employees have a harmonious atmosphere, and can unite as one to contribute to the vigorous development of the company. It is necessary to establish a brand, let customers have a good evaluation of the company, and improve visibility and reputation.
6. Treat all customers fairly and equally; Let all employees do their best and give play to their talents.
Third, build a development stage.
Fourth, formulate measures.
Our study time in this school is only the second half of the year. In this half year, we should learn professional knowledge well and lay a solid foundation for future practice and company establishment.
①: Learn professional knowledge (public relations practice, secretarial foundation, etc.). )
② Take an active part in class and school activities to exercise eloquence and ability.
stage Ⅱ
graduation field work
1 year
We are already practicing, so we should apply what we have learned, constantly enrich ourselves in practice, fully develop our secretarial knowledge, constantly learn to be an excellent secretarial staff, and conduct full market research.
Give full play to what you have learned in school.
②: Constantly enrich yourself.
③: Market research
The third stage
Set up a secretarial service company
2 years
After the accumulation of internship and market research experience, our secretarial service company was formally established. Now we need to push the company to the market and do our best.
①: Establish a company
②: Continue market research and constantly improve the deficiencies.
③: Recommend companies and push them to the market.
4 work hard and do your best.
The fourth stage
Quanli development company
More than 2 years
Improve the reputation of the company when the market has a certain popularity, fully develop the company and push the company to a broader market.
①: Improve the reputation of the company.
②: Push the company to a broader market.
③: Fully develop the company.
Verb (abbreviation of verb) abstract
Our career planning is our goal. With the goal, we will work harder, constantly enrich our knowledge and study the basic courses of secretaries. During the internship, you should fully contact the actual business and do a good job in market research. Summarize and analyze the research results every month. Be fully prepared to set up a company. "If you eat hard, you are a master." We will remember this old saying and apply what we have learned. Raise the sail of hard work and sail to the other side of success.
- Related articles
- What are the delicious places in Wuhu?
- The most classic route in Xinjiang road trip is arranged here! Starting from Urumqi, I will take you to feel the charm of Xinjiang, and there are some matters needing attention.
- How far is it from Dalian Railway 1896 Garden Hotel to the railway station?
- How about Zhongshan Xinshunxiang Electric Appliance Manufacturing Co., Ltd.?
- How about Yizhou Hotel Pingyi Store in Linyi City?
- Consumption level of Burj Al Arab Hotel
- #Nanten-En # How can I get to your hotel from Kansai International Airport?
- Where can I rent an apartment? What are the precautions for choosing a long-term rental apartment?
- What school is the pub?
- Are Joker Xue and Jay Chou Han?